2012 sustainability plan |
Previous | 1 of 3 | Next |
|
small (250x250 max)
medium (500x500 max)
Large
Extra Large
large ( > 500x500)
Full Resolution
|
This page
All
|
FY 2012 SUSTAINABILITY PLAN OFFICE OF FACILITIES MANAGEMENT O FM Sustainability Plan FY2012 GOAL 1: IMPLEMENT SUSTAINABLE BUILDING PRACTICES FY12 Objectives: • 1.1: All projects shall be qualified with the requirements listed in Standard 189.1-2009. • 1.2: Publish and implement IECC 2006 Standards on “Interior lighting power allowances” [Table 505.5.2] and “Lighting Power Densities” for building exteriors [Table 505.6.2]. • 1.3: Implement energy modeling practices in lieu of like kind equipment replacement • 1.4: 75% of OFM remodel and renovation projects will exceed adopted building standard. • 1.5: 100% of OFM repair and replacements will be best available for the application. FY12 Tasks: • Energy Management: o 1.1: Develop a checklist or similar tracking method for the Architect and Engineer to incorporate in proposal/design packages. o 1.2: Distribute tables to design team i.e. Architect and Engineering on-call o 1.3: Baseline: Model Energy consumption as per the latest requirements of ASHRAE standards 90.1-2007 and 62.1-2007. o 1.4: Work with architects, engineers and Facilities Services to ensure the adopted standards are implemented in all remodel/renovation projects. o 1.5: Research best available options & industry climate; Make water conservation & lighting efficiency recommendations adhering to the established standards in Objective 1.1. FY13 Objectives (2 year): • 1.1: All projects shall be qualified with the requirements listed in Standard 189.1-2009. • 1.2: Publish and implement IECC 2006 Standards on “Interior lighting power allowances” [Table 505.5.2] and “Lighting Power Densities” for building exteriors [Table 505.6.2]. • 1.3: Implement energy modeling practices in lieu of like kind equipment replacement • 1.4: 75% of OFM remodel and renovation projects will exceed adopted building standard. • 1.5: 100% of OFM repair and replacements will be best available for the application. FY17 Objectives (5 year): • 1.1: All projects shall be qualified with the requirements listed in Standard 189.1-2009. • 1.2: Publish and implement IECC 2006 Standards on “Interior lighting power allowances” [Table 505.5.2] and “Lighting Power Densities” for building exteriors [Table 505.6.2]. • 1.3: Implement energy modeling practices in lieu of like kind equipment replacement • 1.4: 75% of OFM remodel and renovation projects will exceed adopted building standard. • 1.5: 100% of OFM repair and replacements will be best available for the application. O FM Sustainability Plan FY2012 GOAL 2: REDUCE VEHICLE ASSOCIATED POLLUTION FY12 Objectives: • 2.1: Benchmark mansion grounds gasoline usage for FY13 comparison. FY12 Tasks: • Facilities Services: o 2.1: Task FY13 Objectives (2 year): • 2.1: Reduce mansion grounds gasoline usage by 10% from FY12 baseline. FY17 Objectives (5 year): • 2.1: Reduce mansion grounds gasoline usage by 25% from FY12 baseline. • 2.2: Install Electric Vehicle charging stations at one building. O FM Sustainability Plan FY2012 GOAL 3: MAXIMIZE RECYCLING, MINIMIZE WASTE FY12 Objectives: • 3.1 ‐ 10% reduction in office paper use based on FY10 baseline. • 3.2 ‐ Maintain 100% of copy paper purchased for OFM use is 100% recycled content (white 8 ½ 11). • 3.3 ‐ 100% of janitorial paper products will be of 30% recycled content and chlorine free if available in the market. • 3.4 ‐ 100% of all fluorescent bulbs and rechargeable batteries will be recycled. • 3.5 – 100% compact fluorescent bulbs will be disposed of through an environmental management program. FY12 Tasks: • Energy Management: o 3.1: Minimize paper use by utilizing electronic tablet computer for all auditing. FY13 Objectives (2 year): • 3.1 ‐ 15% reduction in office paper use based on FY10 baseline. • 3.2 ‐ Maintain 100% of copy paper purchased for OFM use is 100% recycled content (white 8 ½ 11). • 3.3 ‐ 100% of janitorial paper products will be of 30% recycled content and chlorine free if available in the market. • 3.4 ‐ 100% of all fluorescent bulbs and rechargeable batteries will be recycled. • 3.5 – 100% compact fluorescent bulbs will be disposed of through an environmental management program. FY17 Objectives (5 year): • 3.1 ‐ 25% reduction in office paper use based on FY10 baseline. • 3.2 ‐ Maintain 100% of copy paper purchased for OFM use is 100% recycled content (white 8 ½ 11). • 3.3 ‐ 100% of janitorial paper products will be of 30% recycled content and chlorine free if available in the market. • 3.4 ‐ 100% of all fluorescent bulbs and rechargeable batteries will be recycled. • 3.5 – 100% compact fluorescent bulbs will be disposed of through an environmental management program. O FM Sustainability Plan FY2012 GOAL 4: MINIMIZE FACILITY RELATED ENERGY & WATER USE FY12 Objectives: • 4.1: Reduce greenhouse gas emission/energy use by 25%. • 4.2: Reduce water use by 30% per square foot from FY08 benchmark. • 4.3: Increase renewable energy kW potential based on FY11 benchmark. • 4.4: Achieve an Energy Star rating of 75 or higher for ten (10) DCS-managed buildings. • 4.5: Achieve Energy Star Portfolio average rating of 85 or higher. • 4.6: Achieve Power Factor of 90 in all buildings. • 4.7: Achieve Energy Star‐certification for ten (10) buildings. • 4.8: Two employees will become certified energy managers. • 4.9: Two employees will become LEED Green Associates. FY12 Tasks: • Energy Management: o 4.1: Establish complete lighting upgrade plan for 2 buildings. Plan will include: existing conditions, recommended products/systems & projected payback. o 4.1: Complete plans and bid process for the following projects: Denver Davison 2012 upgrade projects; Jim Thorpe cooling tower, piping, chiller & control upgrades; Agriculture building mechanical re-design; o 4.2: Complete irrigation on-call contract process. o 4.3: Complete PV project at Banking Commission building. o 4.3: Complete design & construction of wind generator at Library. o 4.4: Work with Facilities Services to set up electrical metering for OEM allowing Will Rogers to be profiled separately on Energy Star. o 4.4: Investigate natural gas supply. o 4.5: Target projects in underperforming buildings to raise average rating. o 4.6: Target projects in underperforming buildings to raise average rating. o 4.7: Work with Facilities Services to set up electrical metering for OEM allowing Will Rogers to be profiled separately on Energy Star. o 4.7: Investigate natural gas supply. o 4.7: Target projects in borderline buildings. o 4.8: Locate training course & determine eligibility. o 4.9: Study & schedule exams. • Facilities Services: o 4.1: Task FY13 Objectives: • 4.1: Reduce greenhouse gas emission/energy use by 27.5%. • 4.2: Reduce water use by 30% per square foot from FY08 benchmark. • 4.3: Increase renewable energy kW potential by 10% based on FY11 benchmark. • 4.4: Achieve an Energy Star rating of 75 or higher for eleven (11) DCS-managed buildings. • 4.5: Achieve Energy Star Portfolio average rating of 87 or higher. O FM Sustainability Plan FY2012 • 4.6: Achieve Power Factor of 90 in all buildings. • 4.7: Achieve Energy Star‐certification for all eligible buildings. • 4.8: Complete required CEU credits to maintain LEED Green Associate accreditation. FY17 Objectives: • 4.1: Reduce greenhouse gas emission/energy use by 30%. • 4.2: Reduce water use by 30% per square foot from FY08 benchmark. • 4.3: Increase renewable energy kW potential by 10% based on FY11 benchmark. • 4.4: Achieve an Energy Star rating of 75 or higher for thirteen (13) DCS-managed buildings. • 4.5: Achieve Energy Star Portfolio average rating of 88 or higher. • 4.6: Achieve Power Factor of 91 in all buildings. • 4.7: Achieve Energy Star‐certification for all eligible buildings. • 4.8: Complete required CEU credits to maintain LEED Green Associate accreditation. O FM Sustainability Plan FY2012 GOAL 5: REDUCE TOXIC PRODUCTS AND CHEMICALS FY12 Objectives: • 5.1: OFM (Purchasing) will establish procedures and guidelines (checklist) for the procurement of Environmentally Preferred Products/Services (EPP) contracts/products. • 5.2: 100% of OFM janitorial products used will be Green Seal approved or equivalent. • 5.3: Maintain no persistent toxins in OFM managed landscaping. FY12 Tasks: • Facilities Services: o 5.1: Task 1 FY13 Objectives: • 5.1: OFM (Purchasing) will establish procedures and guidelines (checklist) for the procurement of Environmentally Preferred Products/Services (EPP) contracts/products. • 5.2: 100% of OFM janitorial products used will be Green Seal approved or equivalent. • 5.3: Eliminate all persistent toxins in OFM managed landscaping. FY17 Objectives: • 5.1: OFM (Purchasing) will establish procedures and guidelines (checklist) for the procurement of Environmentally Preferred Products/Services (EPP) contracts/products. • 5.2: 100% of OFM janitorial products used will be Green Seal approved or equivalent. • 5.3: Eliminate all persistent toxins in OFM managed landscaping. O FM Sustainability Plan FY2012 GOAL 6: SUSTAINABLE LEASING PRACTICES FY12 Objectives: • 6.1: Draft legislation to require Energy Star rating for private leased buildings • 6.2: Establish cost tier to enable consideration of sustainable practices when calculating the total cost per square foot of leased space. FY12 Tasks: • State Leasing: o 6.1: Research requirements and lessons learned from other states o 6.1: Work with Administration to seek sponsor and draft legislation o 6.2: Create checklist for lessors and brokers to complete and submit with proposals. o 6.2: Incorporate items on checklist on agency evaluation tool. • Energy Management: o Provide information & assist when needed. FY13 Objectives: • 6.1: Implement legislation to require Energy Star rating for private leased buildings • 6.2: Implement cost tier to enable consideration of sustainable practices when calculating the total cost per square foot of leased space. FY17 Objectives: • 6.1: Implement legislation to require Energy Star rating for private leased buildings • 6.2: Implement cost tier to enable consideration of sustainable practices when calculating the total cost per square foot of leased space.
Object Description
Description
Title | 2012 sustainability plan |
OkDocs Class# | C1350.3 S964p 2011/12 |
Digital Format | PDF, Adobe Reader required |
ODL electronic copy | Downloaded from agency website: http://www.ok.gov/DCS/documents/FY12_OFM-Sustainability-Plan%20(V2).pdf |
Rights and Permissions | This Oklahoma state government publication is provided for educational purposes under U.S. copyright law. Other usage requires permission of copyright holders. |
Language | English |
Full text | FY 2012 SUSTAINABILITY PLAN OFFICE OF FACILITIES MANAGEMENT O FM Sustainability Plan FY2012 GOAL 1: IMPLEMENT SUSTAINABLE BUILDING PRACTICES FY12 Objectives: • 1.1: All projects shall be qualified with the requirements listed in Standard 189.1-2009. • 1.2: Publish and implement IECC 2006 Standards on “Interior lighting power allowances” [Table 505.5.2] and “Lighting Power Densities” for building exteriors [Table 505.6.2]. • 1.3: Implement energy modeling practices in lieu of like kind equipment replacement • 1.4: 75% of OFM remodel and renovation projects will exceed adopted building standard. • 1.5: 100% of OFM repair and replacements will be best available for the application. FY12 Tasks: • Energy Management: o 1.1: Develop a checklist or similar tracking method for the Architect and Engineer to incorporate in proposal/design packages. o 1.2: Distribute tables to design team i.e. Architect and Engineering on-call o 1.3: Baseline: Model Energy consumption as per the latest requirements of ASHRAE standards 90.1-2007 and 62.1-2007. o 1.4: Work with architects, engineers and Facilities Services to ensure the adopted standards are implemented in all remodel/renovation projects. o 1.5: Research best available options & industry climate; Make water conservation & lighting efficiency recommendations adhering to the established standards in Objective 1.1. FY13 Objectives (2 year): • 1.1: All projects shall be qualified with the requirements listed in Standard 189.1-2009. • 1.2: Publish and implement IECC 2006 Standards on “Interior lighting power allowances” [Table 505.5.2] and “Lighting Power Densities” for building exteriors [Table 505.6.2]. • 1.3: Implement energy modeling practices in lieu of like kind equipment replacement • 1.4: 75% of OFM remodel and renovation projects will exceed adopted building standard. • 1.5: 100% of OFM repair and replacements will be best available for the application. FY17 Objectives (5 year): • 1.1: All projects shall be qualified with the requirements listed in Standard 189.1-2009. • 1.2: Publish and implement IECC 2006 Standards on “Interior lighting power allowances” [Table 505.5.2] and “Lighting Power Densities” for building exteriors [Table 505.6.2]. • 1.3: Implement energy modeling practices in lieu of like kind equipment replacement • 1.4: 75% of OFM remodel and renovation projects will exceed adopted building standard. • 1.5: 100% of OFM repair and replacements will be best available for the application. O FM Sustainability Plan FY2012 GOAL 2: REDUCE VEHICLE ASSOCIATED POLLUTION FY12 Objectives: • 2.1: Benchmark mansion grounds gasoline usage for FY13 comparison. FY12 Tasks: • Facilities Services: o 2.1: Task FY13 Objectives (2 year): • 2.1: Reduce mansion grounds gasoline usage by 10% from FY12 baseline. FY17 Objectives (5 year): • 2.1: Reduce mansion grounds gasoline usage by 25% from FY12 baseline. • 2.2: Install Electric Vehicle charging stations at one building. O FM Sustainability Plan FY2012 GOAL 3: MAXIMIZE RECYCLING, MINIMIZE WASTE FY12 Objectives: • 3.1 ‐ 10% reduction in office paper use based on FY10 baseline. • 3.2 ‐ Maintain 100% of copy paper purchased for OFM use is 100% recycled content (white 8 ½ 11). • 3.3 ‐ 100% of janitorial paper products will be of 30% recycled content and chlorine free if available in the market. • 3.4 ‐ 100% of all fluorescent bulbs and rechargeable batteries will be recycled. • 3.5 – 100% compact fluorescent bulbs will be disposed of through an environmental management program. FY12 Tasks: • Energy Management: o 3.1: Minimize paper use by utilizing electronic tablet computer for all auditing. FY13 Objectives (2 year): • 3.1 ‐ 15% reduction in office paper use based on FY10 baseline. • 3.2 ‐ Maintain 100% of copy paper purchased for OFM use is 100% recycled content (white 8 ½ 11). • 3.3 ‐ 100% of janitorial paper products will be of 30% recycled content and chlorine free if available in the market. • 3.4 ‐ 100% of all fluorescent bulbs and rechargeable batteries will be recycled. • 3.5 – 100% compact fluorescent bulbs will be disposed of through an environmental management program. FY17 Objectives (5 year): • 3.1 ‐ 25% reduction in office paper use based on FY10 baseline. • 3.2 ‐ Maintain 100% of copy paper purchased for OFM use is 100% recycled content (white 8 ½ 11). • 3.3 ‐ 100% of janitorial paper products will be of 30% recycled content and chlorine free if available in the market. • 3.4 ‐ 100% of all fluorescent bulbs and rechargeable batteries will be recycled. • 3.5 – 100% compact fluorescent bulbs will be disposed of through an environmental management program. O FM Sustainability Plan FY2012 GOAL 4: MINIMIZE FACILITY RELATED ENERGY & WATER USE FY12 Objectives: • 4.1: Reduce greenhouse gas emission/energy use by 25%. • 4.2: Reduce water use by 30% per square foot from FY08 benchmark. • 4.3: Increase renewable energy kW potential based on FY11 benchmark. • 4.4: Achieve an Energy Star rating of 75 or higher for ten (10) DCS-managed buildings. • 4.5: Achieve Energy Star Portfolio average rating of 85 or higher. • 4.6: Achieve Power Factor of 90 in all buildings. • 4.7: Achieve Energy Star‐certification for ten (10) buildings. • 4.8: Two employees will become certified energy managers. • 4.9: Two employees will become LEED Green Associates. FY12 Tasks: • Energy Management: o 4.1: Establish complete lighting upgrade plan for 2 buildings. Plan will include: existing conditions, recommended products/systems & projected payback. o 4.1: Complete plans and bid process for the following projects: Denver Davison 2012 upgrade projects; Jim Thorpe cooling tower, piping, chiller & control upgrades; Agriculture building mechanical re-design; o 4.2: Complete irrigation on-call contract process. o 4.3: Complete PV project at Banking Commission building. o 4.3: Complete design & construction of wind generator at Library. o 4.4: Work with Facilities Services to set up electrical metering for OEM allowing Will Rogers to be profiled separately on Energy Star. o 4.4: Investigate natural gas supply. o 4.5: Target projects in underperforming buildings to raise average rating. o 4.6: Target projects in underperforming buildings to raise average rating. o 4.7: Work with Facilities Services to set up electrical metering for OEM allowing Will Rogers to be profiled separately on Energy Star. o 4.7: Investigate natural gas supply. o 4.7: Target projects in borderline buildings. o 4.8: Locate training course & determine eligibility. o 4.9: Study & schedule exams. • Facilities Services: o 4.1: Task FY13 Objectives: • 4.1: Reduce greenhouse gas emission/energy use by 27.5%. • 4.2: Reduce water use by 30% per square foot from FY08 benchmark. • 4.3: Increase renewable energy kW potential by 10% based on FY11 benchmark. • 4.4: Achieve an Energy Star rating of 75 or higher for eleven (11) DCS-managed buildings. • 4.5: Achieve Energy Star Portfolio average rating of 87 or higher. O FM Sustainability Plan FY2012 • 4.6: Achieve Power Factor of 90 in all buildings. • 4.7: Achieve Energy Star‐certification for all eligible buildings. • 4.8: Complete required CEU credits to maintain LEED Green Associate accreditation. FY17 Objectives: • 4.1: Reduce greenhouse gas emission/energy use by 30%. • 4.2: Reduce water use by 30% per square foot from FY08 benchmark. • 4.3: Increase renewable energy kW potential by 10% based on FY11 benchmark. • 4.4: Achieve an Energy Star rating of 75 or higher for thirteen (13) DCS-managed buildings. • 4.5: Achieve Energy Star Portfolio average rating of 88 or higher. • 4.6: Achieve Power Factor of 91 in all buildings. • 4.7: Achieve Energy Star‐certification for all eligible buildings. • 4.8: Complete required CEU credits to maintain LEED Green Associate accreditation. O FM Sustainability Plan FY2012 GOAL 5: REDUCE TOXIC PRODUCTS AND CHEMICALS FY12 Objectives: • 5.1: OFM (Purchasing) will establish procedures and guidelines (checklist) for the procurement of Environmentally Preferred Products/Services (EPP) contracts/products. • 5.2: 100% of OFM janitorial products used will be Green Seal approved or equivalent. • 5.3: Maintain no persistent toxins in OFM managed landscaping. FY12 Tasks: • Facilities Services: o 5.1: Task 1 FY13 Objectives: • 5.1: OFM (Purchasing) will establish procedures and guidelines (checklist) for the procurement of Environmentally Preferred Products/Services (EPP) contracts/products. • 5.2: 100% of OFM janitorial products used will be Green Seal approved or equivalent. • 5.3: Eliminate all persistent toxins in OFM managed landscaping. FY17 Objectives: • 5.1: OFM (Purchasing) will establish procedures and guidelines (checklist) for the procurement of Environmentally Preferred Products/Services (EPP) contracts/products. • 5.2: 100% of OFM janitorial products used will be Green Seal approved or equivalent. • 5.3: Eliminate all persistent toxins in OFM managed landscaping. O FM Sustainability Plan FY2012 GOAL 6: SUSTAINABLE LEASING PRACTICES FY12 Objectives: • 6.1: Draft legislation to require Energy Star rating for private leased buildings • 6.2: Establish cost tier to enable consideration of sustainable practices when calculating the total cost per square foot of leased space. FY12 Tasks: • State Leasing: o 6.1: Research requirements and lessons learned from other states o 6.1: Work with Administration to seek sponsor and draft legislation o 6.2: Create checklist for lessors and brokers to complete and submit with proposals. o 6.2: Incorporate items on checklist on agency evaluation tool. • Energy Management: o Provide information & assist when needed. FY13 Objectives: • 6.1: Implement legislation to require Energy Star rating for private leased buildings • 6.2: Implement cost tier to enable consideration of sustainable practices when calculating the total cost per square foot of leased space. FY17 Objectives: • 6.1: Implement legislation to require Energy Star rating for private leased buildings • 6.2: Implement cost tier to enable consideration of sustainable practices when calculating the total cost per square foot of leased space. |
Date created | 2011-12-22 |
Date modified | 2011-12-22 |