cirb_fy2012-2016_workplan |
Previous | 1 of 4 | Next |
|
small (250x250 max)
medium (500x500 max)
Large
Extra Large
large ( > 500x500)
Full Resolution
|
This page
All
|
FY-2012 through FY-2016 Construction Work Plan Oklahoma Department of Transportation in Cooperation with the County Advisory Board CIRB County Improvements for Roads and Bridges BUDGETARY PROJECTIONS 1 Budgetary Projections House Bill 1176 Applicable Provisions With the passage of House Bill 1176 in the summer of 2006, a new section of law was codified in the Oklahoma Statutes as Section 507 of Title 69. This law effectively creates the County Improvements for Roads and Bridges (CIRB) program and reads as follows: A. There is hereby created in the State Treasury a revolving fund to be known as the “County Improvements for Roads and Bridges Fund”. The fund shall be a continuing fund, not subject to fiscal year limitations, and shall consist of all appropriations and transfers made by the Legislature and the apportionments made pursuant to subsection L of Section 1104 of Title 47 of the Oklahoma Statutes. All monies accruing to the credit of said fund are hereby appropriated and may be budgeted and expended beginning with the fiscal year ending June 30, 2008, and each fiscal year thereafter pursuant to subsection B of this section. Expenditures from said fund shall be made upon warrants issued by the State Treasurer against claims filed as prescribed by law with the Director of State Finance for approval and payment. B. The funds apportioned pursuant to subsection L of Section 1104 of Title 47 of the Oklahoma Statutes shall be in equal amounts to the various Transportation Commission districts. The funds shall be used for the sole purpose of construction or reconstruction of county roads or bridges on the county highway system that are of the highest priority as defined by the Transportation Commission. Counties may accumulate annual funding for a period of up to five (5) years for a specific project, with such funding to be held by the Transportation Commission to the credit of the county project. The Transportation Commission shall promulgate rules for the administration of the process and the development of criteria for determining the level of priority for projects and include such projects in a five-year construction plan that will be updated annually. Projects in the five-year construction plan shall be contracted as provided by law and awarded by the Transportation Commission. C. The fund shall be invested in whatever instruments are authorized by law for investments by the State Treasurer and the interest earned by any investment of monies from the fund shall be credited to the fund which shall earn the same, if there is any unexpended balance of such fund to which to credit the interest. The interest credited herein shall be expended pursuant to this section. Key Provisions of the CIRB Program 15 percent of the Motor Vehicle Tax is directed to the newly created County Improvements for Roads and Bridges (CIRB) which is administered by the Department. Previously, this portion of the taxes and fees went to the General Revenue Fund. The apportionment for the County Improvements for Roads and Bridges (CIRB) will be phased in at a rate of 5 percent per year. When fully implemented the estimated annual amount provided to county roads is estimated to be $85.6 million (see attached graph). The funds are directed to be equally distributed by the Department’s eight (8) Transportation Commission Districts and administered by the Department through the utilization of a Transportation Commission approved five-year construction work plan for projects on the county road system. The five-year CIRB plan is developed through careful coordination with the County Commissioners along with the assistance provided by their respective Circuit Engineering Districts. Projects included in the CIRB plan consist of the highest priority, most critical projects as identified and validated by the cooperative project recommendation, selection and approval process. SELECTION & BALANCING PROCESS Selection and Balancing Process The balancing and management of the CIRB Construction Work Plan is progressed in accordance with the roles and responsibilities generally defined in the following outline: County Commissioners The development of the CIRB Construction Work Plan begins with the identification of potential projects by the County Commissioners and is guided by their knowledge of the transportation needs and priorities in their respective Districts. They and their staff work to maintain an understanding of the condition of the roads and bridges in their areas of responsibility and typically consider the following general project selection characteristics as applicable and listed in no particular order: Surface condition Bridge condition Geometrics (horizontal and vertical alignment) Average annual daily traffic (AADT) Percentage of truck traffic Accident history Local, regional and sometimes national traffic patterns Capacity The further understanding gained from these considerations is coupled with the definition of a “critical, high priority project” to guide the Commissioner’s recommendations. As a result, recommended CIRB projects are anticipated to be comprised of improvements to the county transportation system that advance the safety and mobility benefits realized by the traveling public and commerce and the extent that the projects will enhance the overall level of service and longevity of these facilities. For example: Given the current condition of Oklahoma’s State and County bridge infrastructure, an easily supported critical, high priority project could consist of a structurally deficient and/or functionally obsolete bridge in excess of 200’ in length and on the county collector system. These facilities number in excess of 140, typically inhibit safe and efficient travel and are also most often load posted. In addition, these bridges are very difficult for the County Commissioners to replace as part of their regular transportation program due to the expense and magnitude of the endeavor. A single bridge of this type constitutes an unfunded, long term problem and, if addressed through conventional funding sources, represents a tremendous drain on a County’s already limited resources. Roadway and/or bridge improvements that represent “county mobility corridors” might also be considered as critical, high priority projects as long as the proposed solution is of sufficient design and is supported by sound engineering judgment. A project of this type could include several contiguous miles of roadway, culvert and bridge improvements and might even span and be recommended by multiple counties. County road intersection improvements at locations that have poor sight triangles, sight distances, or other safety related deficiencies are good candidates. Often these locations are also noted by high traffic volumes and accident occurrences and may be proposed in combination with and as a component of “county mobility corridor” solutions. Circuit Engineering Districts The Circuit Engineering Districts (CEDs) are established by the County Commissioners to provide common engineering and project support services to the member Counties. The CEDs are governed by a Board with a County Commissioner representative from each participating County and each CED also elects a Board Member to a Statewide Circuit Engineering Board. The individual CEDs are not organizationally identical and may be staffed differently dependent on the desires and needs of the member Commissioners. The available resources that may be provided through a CED currently range from engineers to bridge and construction inspectors to management, production and support personnel. A CED may also choose to utilize the services of Consultants to assist with meeting the needs of their members. As related to the recommendation and delivery of CIRB projects, all potential projects are initiated by the County Commissioners and are coordinated with the appropriate Circuit Engineering District for further preparation, consideration, evaluation and screening. Each CED ultimately assists with the compilation of the proposed individual project request forms and directs the development of the recommended list of projects to be considered by the Department for addition to the CIRB Construction Work Plan. Concurrently and to the extent possible, the scope, schedule and budget of projects that previously existed in the Construction Work Plan are re-validated to determine the need for modifications. For projects that exist in the Construction Work Plan and that are being actively progressed, the CEDs assist with the facilitation of any necessary modifications to the scope, schedule and/or budgets of approved projects as more detailed information becomes available during the course of project development. The continuous assessment of these projects is accomplished through drive outs and/or other project team meetings conducted with the complete participation of appropriate Department, County and CED personnel as deemed necessary. The CEDs may also assist with the scheduling, coordination and documentation of these meetings and the larger project development process. Department of Transportation The responsibility for the expenditure of the CIRB funding has been placed with the Department of Transportation and the Transportation Commission has promulgated rules to guide the administration of the program. The simple role of the Department is to work with County Governments and their representatives to insure the long term budgetary integrity of the CIRB Construction Work Plan and the continuity of the projects it encompasses. In summary of the process, the County Commissioners identify and consider potential CIRB projects. The CEDs then assist with the completion of the project request forms and with the preparation of the recommended list of projects. Upon receipt of the CED recommendation and supporting documentation, the Department conducts an independent review of the proposed projects as determined necessary. The individual project evaluations are completed as appropriate drawing on the expertise of a team of Department personnel knowledgeable in the subject matter. When the proposed projects are validated, each requested project phase (Engineering, Right-of-Way, Utility Relocation, Construction) is then budgeted, scheduled and packaged for addition to the CIRB Construction Work Plan. The project additions are balanced to and fiscally constrained by the Transportation Commission District’s boundary and the projected allocation of the available CIRB funding. Based on the information generated by the described process, the Department will compile, prepare and present the CIRB Construction Work Plan for Transportation Commission consideration and approval annually. Ultimately, the Transportation Commission will consider the Department’s evaluation of the proposed CIRB projects and the resulting Construction Work Plan recommendation with a Statewide perspective. When the CIRB Construction Work Plan is approved, the Department coordinates and cooperates with the Counties and the CEDs in the active management of the project development and delivery process. As the projects develop, the Department also facilitates the regular maintenance, modification and adjustment of the Plan as necessary. SUMMARY REPORT FY Category CIRB Federal State Other Tribe Match Tribe Reimb. Total Construction $195,806,481 $40,057,643 $0 $5,416,311 $1,800,000 $1,119,000 $243,137,033 R/W & Utilities $13,370,083 $0 $0 $0 $0 $0 $13,370,083 Engineering $8,608,319 $0 $0 $0 $0 $0 $8,608,319 FY Totals $217,784,883 $40,057,643 $0 $5,416,311 $1,800,000 $1,119,000 $265,115,435 Construction $111,682,844 $19,760,486 $0 $1,441,388 $0 $500,000 $132,884,718 Engineering $2,527,260 $0 $0 $0 $0 $0 $2,527,260 R/W & Utilities $3,109,137 $0 $0 $0 $0 $0 $3,109,137 FY Totals $117,319,241 $19,760,486 $0 $1,441,388 $0 $500,000 $138,521,115 R/W & Utilities $3,819,570 $0 $0 $0 $0 $0 $3,819,570 Engineering $4,236,296 $0 $0 $0 $0 $0 $4,236,296 Construction $88,078,634 $18,200,456 $523,200 $2,050,417 $0 $0 $108,952,706 FY Totals $96,134,500 $18,200,456 $523,200 $2,050,417 $0 $0 $117,008,572 Construction $78,839,239 $18,619,193 $0 $3,000,848 $280,000 $2,000,000 $100,989,280 R/W & Utilities $1,255,000 $0 $0 $0 $0 $0 $1,255,000 Engineering $1,934,695 $0 $0 $0 $0 $0 $1,934,695 FY Totals $82,028,934 $18,619,193 $0 $3,000,848 $280,000 $2,000,000 $104,178,975 Construction $66,976,551 $11,127,660 $0 $32,000 $0 $0 $78,136,211 R/W & Utilities $897,468 $0 $0 $0 $0 $0 $897,468 Engineering $1,550,000 $0 $0 $0 $0 $0 $1,550,000 FY Totals $69,424,019 $11,127,660 $0 $32,000 $0 $0 $80,583,679 $582,691,577 $107,765,438 $523,200 $11,940,964 $2,080,000 $3,619,000 $705,407,776 Note: Preliminary Engineering projects are shown only in this summary and are not included in the then Fiscal Year project listing. Grand Total 2012 2013 2014 2015 2016 CIRB FUNDING SUMMARY CONSTRUCTION WORK PLAN FY 2012 – FY 2016 CONSTRUCTION WORK PLAN ***Projects are ordered by Fiscal Year and arranged alphabetically by County*** FFY 2012 5 YEAR CIRB WORK PLAN FISCAL YEAR 2012 CIRB$ Total$ ADAIR 1 24830(04) COBRGE 0.50 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER EVANSVILLE CR. 2.7 MI. E. AND 0.2 MI. N. OF SH-51 $1,545,000 DIV. $1,545,000 ADAIR 1 24830(06) COBRGE 0.50 MI. FY 2012 RIGHT OF WAY CO. BR. OVER EVANSVILLE CR. 2.7 MI. E. AND 0.2 MI. N. OF SH-51 (RW FOR 24830(04)) $25,750 DIV. $25,750 ADAIR 1 24830(07) COBRGE 0.50 MI. FY 2012 UTILITIES CO. BR. OVER EVANSVILLE CR. 2.7 MI. E. AND 0.2 MI. N. OF SH-51 (UT FOR 24830(04)) $51,500 DIV. $51,500 ADAIR 1 24831(07) COBRGE 0.50 MI. FY 2012 UTILITIES CO. BR. OVER ILLINOIS RIVER, 4.0 MI. S. AND 0.8 MI. E.OF NW C/L (UT FOR 24831(04)) $10,300 DIV. $10,300 ADAIR 1 25640(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER ROCK BRANCH CR., 5.8 MI. N. & 1.1 MI. W. OF CHANCE $309,000 DIV. $515,000 ALFALFA 6 24832(04) CO RD 5.00 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO. RD. ON EW-25 FROM 1.0 MI. W. OF ALFALFA C/L IN WOODS CO. EXT. E. 6.0 MI TO NS-255 (PH I) $4,017,000 DIV. $4,017,000 ALFALFA 6 24832(06) CO RD 5.00 MI. FY 2012 RIGHT OF WAY CO. RD. 7 BRIDGES, 17.0 MI. IN ALFALFA CO. & 1.0 MI. IN WOODS CO. (EW23, NS255,EW-25) (RW FOR 24832(04) $10,300 DIV. $10,300 ALFALFA 6 24832(07) CO RD 5.00 MI. FY 2012 UTILITIES CO. RD. 7 BRIDGES, 17.0 MI. IN ALFALFA CO. & 1. IN WOODS CO. (EW-23,NS255, EW-25) UT FOR 24832(04) $10,300 DIV. $10,300 ALFALFA 6 24832(10) CO RD 8.00 MI. FY 2012 RIGHT OF WAY CO. RD. ON NS-255 FROM EW-25 EXT. N. 2.0 MI. TO EW-23 THEN EXT. E. 6.0 MI. TO US-64 (PH II) RW FOR 24832(08) $10,300 DIV. $10,300 ALFALFA 6 24832(11) CO RD 8.00 MI. FY 2012 UTILITIES CO. RD. ON NS-255 FROM EW-25 EXT. N. 2.0 MI. TO EW-23 THEN EXT. E. 6.0 MI. TO US-64 (PH II) UT FOR 24832(08) $10,300 DIV. $10,300 ALFALFA 6 24833(05) CO RD 10.00 MI. FY 2012 PRELIMINARY ENGINEERING CO. RD. EW-08 FROM BYRON E TO ALFALFA C/L INC 3 BRIDGES (PE FOR 24833(04)(08)) $257,500 DIV. $257,500 ALFALFA 6 25910(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER EAGLE CHIEF CR., 3.2 MI. W. & 1.0 MI. N. OF CARMEN $525,485 DIV. $1,040,485 ALFALFA 6 26958(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES CO BR ON NS-252 OVER LITTLE MULE CREEK 2 MI WEST & 4.2 MI NORTH SH-8/SH-11 JCT $245,257 DIV. $515,000 ALFALFA 6 28343(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING IDGE AND APPROACHES ON EW-034 OVER EAGLE CHIEF CREEK, 1.0 MILES NORTH AND 0.5 MILES EAST OF ALINE PE FOR 28343(04) CIRB FUND $48,410 DIV. $48,410 ALFALFA 6 28351(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES ON NS-264 OVER UNNAMED CREEK, 3.0 MILES EAST OF CHEROKEE PE FOR 28351(04) CIRB FUNDS $48,410 DIV. $48,410 ALFALFA 6 28639(05) CO RD 4.50 MI. FY 2012 PRELIMINARY ENGINEERING RESURFACE EW-35, BEGIN AT WOODS CO LINE (NS-251) AND EXTEND EAST 4.5 MILES TO ALINE PE FOR 28639(04) $37,080 DIV. $37,080 ATOKA 2 22079(04) CO RD 4.00 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO. RD.:4.9 MILES S. OF SH-3, EXT. N 4.0 MI. TO SH 3(PH I) $2,966,194 DIV. $2,966,194 ATOKA 2 22079(05) COBRGE 4.00 MI. FY 2012 PRELIMINARY ENGINEERING CO. RD.: 4.9 MILES S. OF SH 3 EXTENDING N. TO SH 3 (PE FOR 22079(04)) $221,450 DIV. $221,450 ATOKA 2 22079(06) COBRGE 4.00 MI. FY 2012 RIGHT OF WAY CO. RD.: BEGINNING 4.9 MILES S. OF SH 3 EXTENDING N. 4.9 MILES (RW FOR 22079(04)) $123,600 DIV. $123,600 Friday, July 8, 2011 Page 1 of 63 5 YEAR CIRB WORK PLAN ATOKA 2 22079(07) COBRGE 4.00 MI. FY 2012 UTILITIES CO. RD.: BEGINNING 4.9 MILES S. OF SH 3 EXTENDING N. TO SH 3 (UT FOR 22079(04)). $51,500 DIV. $51,500 ATOKA 2 24835(04) COBRGE 1.30 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER N. BOGGY CR., 0.2 MI. E. OF EW-168, NS-393 AND 0.6 MI. E. OF EW-168, NS-393 $1,165,960 DIV. $1,165,960 ATOKA 2 24835(06) COBRGE 1.30 MI. FY 2012 UTILITIES CO. BR. OVER N. BOGGY CR., 0.2 MI. E. OF EW-168, NS-393 AND 0.6 MI. E. OF EW-168, NS-393 (RW FOR 24835(04)) $26,394 DIV. $26,394 ATOKA 2 25859(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER UNNAMED CR., 0.5 MI. N. & 1.2 MI. E. OF REYNOLDS $189,520 DIV. $395,520 ATOKA 2 25861(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER BIRCH CR., 1.0 MI. N. & 1.5 MI. E. OF WARDVILLE $102,176 DIV. $510,880 ATOKA 2 28603(05) COBRGE 0.20 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER BUCK CREEK, 0.6 MILES SOUTH OF CENTERPOINT PE FOR 2860304 $25,750 DIV. $25,750 ATOKA 2 28604(05) COBRGE 0.20 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES ON NS-395.5, OVER DOUBLE SPRING CREEK, 0.5 MILE EAST AND 0.9 SOUTH OF LANE PE FOR 2860404 $25,750 DIV. $25,750 ATOKA 2 28607(05) COBRGE 0.50 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER NORTH BOGGY CREEK ON EW-166 LOCATED 1.0 MILE WEST 2.0 MILES NORTH OF CHOCKIE PE FOR 2860704 $72,100 DIV. $72,100 BEAVER 6 24836(04) COBRGE 0.61 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER BEAVER RV. 4.0 MI. S. OF US-64 $4,635,000 DIV. $4,635,000 BEAVER 6 24836(06) COBRGE 0.61 MI. FY 2012 RIGHT OF WAY CO. BR. OVER BEAVER RV. 4.0 MI. S. OF US-64 (RW FOR 24836(04)) $10,300 DIV. $10,300 BEAVER 6 24836(07) COBRGE 0.61 MI. FY 2012 UTILITIES CO. BR. OVER BEAVER RV. 4.0 MI. S. OF US-64 (RW FOR 24836(04)) $10,300 DIV. $10,300 BEAVER 6 24837(05) COBRGE 0.66 MI. FY 2012 PRELIMINARY ENGINEERING CO. BR. OVER WILLOW CREEK, EW-15, 4.0 MI. E. & 6.0 MI. N. & 1.6 MI. E. OF BOYD (PE FOR 24837(04)) $141,719 DIV. $141,719 BEAVER 6 24837(06) COBRGE 0.66 MI. FY 2012 RIGHT OF WAY CO. BR. OVER WILLOW CR., EW-15, 4.0 MI. E., 6.0 MILE N AND 1.6 MILE E OF BOYD (RW FOR 24837(04)) $10,300 DIV. $10,300 BEAVER 6 24837(07) COBRGE 0.66 MI. FY 2012 UTILITIES CO. BR. OVER WILLOW CR., EW-15, 4.0 MI. E. , 6.0 MILE N AND 1.6 MILE E OF BOYD (UT FOR 24837(04)) $10,300 DIV. $10,300 BEAVER 6 24838(05) COBRGE 1.89 MI. FY 2012 PRELIMINARY ENGINEERING CO. BR. OVER DUGOUT CR., 0.7 MI. S. & 6.4 MI. W. OF BEAVER (PE FOR 24838(04)) $103,000 DIV. $103,000 BEAVER 6 26980(04) COBRGE 0.80 MI. FY 2012 BRIDGE & APPROACHES CO BR: (NS-148) OVER BEAVER RIVER 9 MI EAST & 11.9 NORTH OF ELMWOOD $497,575 DIV. $824,000 BEAVER 6 26981(04) COBRGE 0.30 MI. FY 2012 BRIDGE & APPROACHES CO RD (NS-133) OVER SOUTH FORK OF CLEAR CREEK 6 MI WEST & 0.8 MI SOUTH OF ELMWOOD $230,033 DIV. $515,000 BEAVER 6 28247(05) COBRGE 0.50 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE & APPROACHES OVER KIOWA CREEK, 3.0 MILES NORTH OF SLAPOUT PE FOR 28247(04) CIRB FUNDS $77,250 DIV. $77,250 BEAVER 6 28349(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING COUNTY BRIDGE ON NS-141 OVER CLEAR CREEK, 2.0 MILES NORTH AND 2.0 MILES EAST OF ELMWOOD PE FOR 28349(04) CIRB FUNDS $72,100 DIV. $72,100 Friday, July 8, 2011 Page 2 of 63 5 YEAR CIRB WORK PLAN BECKHAM 5 24840(04) CO RD 7.50 MI. FY 2012 GRADE, DRAIN & SURFACE CO. RD. FROM SH-34, EXT. 4.5 MI. W. THEN 3.0 MI. S. $2,407,625 DIV. $2,407,625 BLAINE 5 24799(04) COBRGE 0.38 MI. FY 2012 BRIDGE & APPROACHES LOW WATER CROSS OVER SALT CR, 7.2 MI SOUTH & 1.0 MI WEST OF SH-8/SH-51 JCT IN OKEENE $907,430 DIV. $907,430 BLAINE 5 26618(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO BR: OVER SALT CR, 2.0 MI EAST & 4.7 MI SOUTH OF THE SH-51/SH-8 IN OKEENE $72,100 DIV. $360,500 BLAINE 5 28694(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING COBR. REPLACE BRIDGE OVER 9 MILE CREEK,6 MI. S. AND 0.4 EAST OF CANTON. PE FOR 28694(04) $30,900 DIV. $30,900 BRYAN 2 20149(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR: OVER NEWBERRY CR, 1.1 MI NORTH OF US-70 & 0.5 MI EAST OF MEAD (ON NS 366) $123,600 DIV. $618,000 BRYAN 2 21654(04) COBRGE 0.30 MI. FY 2012 BRIDGE & APPROACHES CO BR:OVER J-N CREEK, APPROX. 2.3 MI. S. & 0.5 MI. W. OF BLUE $257,500 DIV. $615,940 BRYAN 2 21654(06) COBRGE 0.25 MI. FY 2012 RIGHT OF WAY CO BR: OVER J-N CR., APPROX. 2.3 MI. S. & 0.5 MI. W. OF BLUE R/W FOR 2165404 $5,150 DIV. $5,150 BRYAN 2 21654(07) COBRGE 0.25 MI. FY 2012 UTILITIES CO BR: OVER J-N CR., APPROX. 2.3 MI. S. & 0.5 MI. W. OF BLUE UT FOR 2165404 $5,150 DIV. $5,150 BRYAN 2 24800(06) COBRGE 0.95 MI. FY 2012 RIGHT OF WAY CO BR OVER THE RED RIVER, S.E. OF HENDRIX (CARPENTERS BLUFF BR) (ROW FOR 24800(04) $91,928 DIV. $91,928 BRYAN 2 24800(07) COBRGE 0.95 MI. FY 2012 UTILITIES CO BR OVER THE RED RIVER, S.E. OF HENDRIX (CARPENTERS BLUFF BR) (UT FOR 24800(04) $64,890 DIV. $64,890 BRYAN 2 27889(04) CO RD 2.00 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD(NS-366) BEG APPROX 6.0 MILE SOUTH OF US-70 & EXT SOUTH APPROX 2.0 MILE. $267,800 DIV. $1,297,800 BRYAN 2 27889(06) CO RD 2.00 MI. FY 2012 RIGHT OF WAY CO RD(NS-366) BEG APPROX 6.0 MILE SOUTH OF US-70 & EXT SOUTH APPROX 2.0 MILE. R/W FOR 2788904 $15,450 DIV. $15,450 BRYAN 2 27889(07) CO RD 2.00 MI. FY 2012 UTILITIES CO RD(NS-366) BEG APPROX 6.0 MILE SOUTH OF US-70 & EXT SOUTH APPROX 2.0 MILE. UT FOR 2788904 $25,750 DIV. $25,750 CADDO 7 24802(05) CO RD 2.00 MI. FY 2012 RIGHT OF WAY CO RD (EW-131) BEG AT US-281 & EXTEND WEST APPROXIMATELY 5.8 MILES ROW FOR 24802(04) $412,000 DIV. $412,000 CADDO 7 24802(06) CO RD 2.00 MI. FY 2012 UTILITIES CO RD (EW-131) BEG AT US-281 & EXTEND WEST APPROXIMATELY 5.8 MILES UT FOR 24802(04) $463,500 DIV. $463,500 CADDO 7 24803(05) COBRGE 1.00 MI. FY 2012 PRELIMINARY ENGINEERING CO BR OVER THE LITTLE WASHITA RIVER WEST OF CYRIL ON NS-267 BEG @ SH-19 & EXT APPROX 1.0 MILE SOUTH(2 BRIDGES) (PE FOR 24803(04)) $257,500 DIV. $257,500 CADDO 7 26867(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR: ON NS-261, OVER CEDAR CR, 6.0 MI SOUTH OF BINGER $83,842 DIV. $419,210 CADDO 7 26867(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO BR: ON NS-261, OVER CEDAR CR, 6.0 MI SOUTH OF BINGER ROW FOR 26867(04) $5,150 DIV. $5,150 CADDO 7 26867(07) COBRGE 0.20 MI. FY 2012 UTILITIES CO BR: ON NS-261, OVER CEDAR CR, 6.0 MI SOUTH OF BINGER UT FOR 26867(04) $5,150 DIV. $5,150 Friday, July 8, 2011 Page 3 of 63 5 YEAR CIRB WORK PLAN CADDO 7 27424(04) CO RD 1.70 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD(EW-131) BEG APPROX 3.2 MILE EAST OF JCT OF SH-146/SH-9 & EXT EAST APPROX 1.7 MILE $1,002,370 DIV. $1,414,370 CADDO 7 28389(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER WASHITA RIVER, 1.5 MILES WEST OF ANADARKO PE FOR 28389(04) $77,250 DIV. $77,250 CADDO 7 28409(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES BRIDGE AND APPROACHES (EW-110) OVER SUGAR CREEK, 2.7 MILES WEST AND 3.5 MILES SOUTH OF JCT US-281/SH-37 IN HINTON $115,360 DIV. $576,800 CADDO 7 28409(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-110) OVER SUGAR CREEK, 2.7 MILES WEST AND 3.5 MILES SOUTH OF JCT US-281/SH-37 IN HINTON PE FOR 28409(04) $46,350 DIV. $46,350 CADDO 7 28409(06) COBRGE 0.25 MI. FY 2012 RIGHT OF WAY BRIDGE AND APPROACHES (EW-110) OVER SUGAR CREEK, 2.7 MILES WEST AND 3.5 MILES SOUTH OF JCT US-281/SH-37 IN HINTON ROW FOR 28409(04) $5,150 DIV. $5,150 CADDO 7 28409(07) COBRGE 0.25 MI. FY 2012 UTILITIES BRIDGE AND APPROACHES (EW-110) OVER SUGAR CREEK, 2.7 MILES WEST AND 3.5 MILES SOUTH OF JCT US-281/SH-37 IN HINTON UT FOR 28409(04) $10,300 DIV. $10,300 CADDO 7 28425(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-114) OVER SUGAR CREEK, 0.2 MILES EAST OF LOOKEBA PE FOR 28425(04) $51,500 DIV. $51,500 CANADIAN 4 24804(06) CO RD 4.00 MI. FY 2012 RIGHT OF WAY CO RD FROM US-81 IN OKARCHE WEST 4.0 MI (EW-89) ROW FOR 24804(04) $6,695 DIV. $6,695 CANADIAN 4 24804(07) CO RD 4.00 MI. FY 2012 UTILITIES CO RD FROM US-81 IN OKARCHE WEST 4.0 MI (EW-89) UT FOR 24804(04) $6,695 DIV. $6,695 CANADIAN 4 26646(06) CO RD 2.00 MI. FY 2012 PRELIMINARY ENGINEERING CO RD(NS-274) BEG @ EW-91, APPROX 6.5 MILE NORTH OF CALUMET, & EXT NORTH 2.0 MILE TO EW-89(KINGFISHER C/L) PE FOR 2664604 CIRB FUNDS $74,160 DIV. $74,160 CANADIAN 4 26965(04) COBRGE 0.23 MI. FY 2012 BRIDGE & APPROACHES CO BR ON EW-105 OVER UNNAMED CREEK 1.1 MI EAST OF CADDO CO LINE $103,000 DIV. $515,000 CANADIAN 4 26966(04) COBRGE 0.23 MI. FY 2012 BRIDGE & APPROACHES CO BR ON EW-96 OVER A TRID TO UNCLE JOHNS CREEK 1.3 MI NORTH & 11.5 MI WEST OF PIEDMONT $98,880 DIV. $494,400 CARTER 7 24806(04) CO RD 0.50 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD WITHIN THE CITY OF LONE GROVE (MC-1068C) $780,664 DIV. $1,038,164 CARTER 7 24819(06) CO RD 3.30 MI. FY 2012 RIGHT OF WAY CO RD FROM I-35 @ THE LOVE C/L, NORTH & WEST TO THE DOLESE QUARRY INCLUDES HICKORY CR BR (MC-1032C) (ROW FOR 24819(04) $309,000 DIV. $309,000 CARTER 7 24819(07) CO RD 3.30 MI. FY 2012 UTILITIES CO RD FROM I-35 @ THE LOVE C/L, NORTH & WEST TO THE DOLESE QUARRY INCLUDES HICKORY CR BR (MC-1032C) (UT FOR 24819(04) $257,500 DIV. $257,500 CARTER 7 26848(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES CO BR ON EW-200 OVER WALNUT BAYOU CR, 4.0 MI SOUTH & 5.6 MI EAST OF THE US-70/SH-76 JCT (REPLACE LOW WATER CROSSING) $206,000 DIV. $1,043,312 CARTER 7 26848(06) COBRGE 0.25 MI. FY 2012 RIGHT OF WAY CO BR ON EW-200 OVER WALNUT BAYOU CR, 4.0 MI SOUTH & 5.6 MI EAST OF THE US-70/SH-76 JCT (REPLACE LOW WATER CROSSING) ROW FOR 26848(04) $10,300 DIV. $10,300 CARTER 7 26849(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR ON EW-200 OVER A TRIBUTARY OF WALNUT BAYOU CR, 4.0 MI SOUTH & 4.6 MI EAST OF THE US-70/SH-76 JCT (LOW WATER CROSSING) $107,120 DIV. $535,600 CARTER 7 28377(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (NS-319) OVER CADDO CREEK, 1.2 MILES EAST AND 1.8 MILES SOUTH OF MILO PE FOR 28377(04) $59,659 DIV. $59,659 Friday, July 8, 2011 Page 4 of 63 5 YEAR CIRB WORK PLAN CARTER 7 28379(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-3143) OVER TRIB TO BEAR CREEK, 0.2 MILES NORTH OF POOLEVILLE PE FOR 28379(04) $33,718 DIV. $33,718 CHEROKEE 1 22151(04) COBRGE 0.48 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO. BR. OVER THE ILLINOIS RIVER, 0.2 MI S.E. OF SH-10 (COMBS BR) $2,832,500 DIV. $2,832,500 CHEROKEE 1 22151(06) COBRGE 0.48 MI. FY 2012 RIGHT OF WAY CO. BR. OVER THE ILLINOIS RIVER, 0.2 MI S.E. OF SH-10 (COMBS BR) ROW FOR 22151(04) $25,750 DIV. $25,750 CHEROKEE 1 22151(07) COBRGE 0.48 MI. FY 2012 UTILITIES CO. BR. OVER THE ILLINOIS RIVER, 0.2 MI S.E. OF SH-10 (COMBS BR) UT FOR 22151(04) $25,750 DIV. $25,750 CHEROKEE 1 23430(08) COBRGE 0.43 MI. FY 2012 PRELIMINARY ENGINEERING CO. BR. OVER BARRON FORK CREEK, 0.8 MI SOUTH OF WELLING (PE FOR: 23430(04)) CIRB $77,250 DIV. $77,250 CHEROKEE 1 24824(06) CO RD 1.00 MI. FY 2012 RIGHT OF WAY CO RD: NS4410 FROM 3.8 MI S & 1.0 MI W. OF HULBERT, EXT. NORTH APPRX.1.0 MI OVER RATTLESNAKE CREEK TRIB. ( ROW FOR 24824(04)) $77,250 DIV. $77,250 CHEROKEE 1 24824(07) CO RD 1.00 MI. FY 2012 UTILITIES CO RD: NS4410 FROM 3.8 MI S & 1.0 MI W. OF HULBERT, EXT. NORTH APPRX.1.0 MI OVER RATTLESNAKE CREEK TRIB. (UT FOR 24824(04)) $77,250 DIV. $77,250 CHEROKEE 1 27350(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER PARKHILL CREEK ON FORESTRY RD 4 MI SOUTH & 0.5 MI EAST OF TAHLEQUAH $257,500 DIV. $515,000 CHOCTAW 2 21652(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES CO BR: OVER SALT CREEK, APPROX. 1.2 MI. N. & 1.9 MI. E OF HUGO $360,500 DIV. $721,000 CHOCTAW 2 21652(06) COBRGE 0.25 MI. FY 2012 RIGHT OF WAY CO BR: OVER SALT CREEK, APPROX. 1.2 MI. N. & 1.9 MI. E OF HUGO R/W FOR 2165204 $5,150 DIV. $5,150 CHOCTAW 2 21652(07) COBRGE 0.25 MI. FY 2012 UTILITIES CO BR: OVER SALT CREEK, APPROX. 1.2 MI. N. & 1.9 MI. E OF HUGO UT FOR 2165204 $5,150 DIV. $5,150 CHOCTAW 2 21653(04) COBRGE 0.30 MI. FY 2012 BRIDGE & APPROACHES COUNTY BRIDGE AND APPROACHES OVER BOKCHITO CREEK APPROX. 0.5 MILES SOUTH AND 1.4 MILES EAST OF SOPER $115,690 DIV. $578,448 CHOCTAW 2 24820(06) COBRGE 1.04 MI. FY 2012 RIGHT OF WAY CO BR OVER CLEAR BOGGY CR, 1.9 MI EAST & 4.3 MI NORTH OF BOSWELL ROW FOR 24820(04) $11,897 DIV. $11,897 CHOCTAW 2 24820(07) COBRGE 1.04 MI. FY 2012 UTILITIES CO BR OVER CLEAR BOGGY CR, 1.9 MI EAST & 4.3 MI NORTH OF BOSWELL UT FOR 24820(04) $16,223 DIV. $16,223 CHOCTAW 2 24821(06) COBRGE 1.14 MI. FY 2012 RIGHT OF WAY CO BR OVER MUDDY BOGGY CR, 5.0 MI NORTH OF US-70 ROW FOR 24821(04) $17,510 DIV. $17,510 CHOCTAW 2 24821(07) COBRGE 1.14 MI. FY 2012 UTILITIES CO BR OVER MUDDY BOGGY CR, 5.0 MI NORTH OF US-70 UT FOR 24821(04) $20,600 DIV. $20,600 CHOCTAW 2 28677(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 2.0 MILES NORTH OF FORT TOWSON $10,300 DIV. $216,300 CHOCTAW 2 28677(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 2.0 MILES NORTH OF FORT TOWSON $30,900 DIV. $30,900 CIMARRON 6 24823(04) CO RD 6.00 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD FROM US-287 WEST 6.0 MI @ THE TEXAS S/L (MC-1332C) $2,472,000 DIV. $2,472,000 Friday, July 8, 2011 Page 5 of 63 5 YEAR CIRB WORK PLAN CIMARRON 6 24823(06) CO RD 6.00 MI. FY 2012 RIGHT OF WAY CO RD FROM US-287 WEST 6.0 MI @ THE TEXAS S/L (MC-1332C) ROW FOR 24823(04) $10,300 DIV. $10,300 CIMARRON 6 24823(07) CO RD 6.00 MI. FY 2012 UTILITIES CO RD FROM US-287 WEST 6.0 MI @ THE TEXAS S/L (MC-1332C) UT FOR 24823(04) $10,300 DIV. $10,300 CIMARRON 6 24825(05) CO RD 11.50 MI. FY 2012 PRELIMINARY ENGINEERING CO RD: FROM SH-64 AT FELT, NORTH 11.5 MI. (MC-1342C) P.E. FOR 24825(04) $206,000 DIV. $206,000 CIMARRON 6 28322(05) CO RD 2.80 MI. FY 2012 PRELIMINARY ENGINEERING COUNTY ROAD NS-28 FROM EW-23 EXTEND NORTH 2.8 MILES TO US-56 IN BOISE CITY PE FOR 28322(04) CIRB FUNDS $30,900 DIV. $30,900 COAL 3 24942(04) COBRGE 0.50 MI. FY 2012 BRIDGE & APPROACHES CO BR @ A LOW WATER CROSSING, 1.0 MI SOUTH & 2.0 MI EAST OF LEHIGH $1,390,500 DIV. $1,390,500 COAL 3 24942(06) COBRGE 0.50 MI. FY 2012 RIGHT OF WAY CO BR @ A LOW WATER CROSSING, 1.0 MI SOUTH & 2.0 MI EAST OF LEHIGH ROW FOR 24942(04) $15,450 DIV. $15,450 COAL 3 24942(07) COBRGE 0.50 MI. FY 2012 UTILITIES CO BR @ A LOW WATER CROSSING, 1.0 MI SOUTH & 2.0 MI EAST OF LEHIGH UT FOR 24942(04) $20,600 DIV. $20,600 COMANCHE 7 21614(04) CO RD 6.00 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD: LEE BLVD.-FROM NS-244 EAST 6.0 MI $4,998,590 DIV. $5,790,660 COMANCHE 7 21614(06) CO RD 6.00 MI. FY 2012 RIGHT OF WAY CO RD: LEE BLVD.-FROM NS-246 EAST 6.0 MI (ROW FOR: 21614 (04)) $412,000 DIV. $412,000 COMANCHE 7 21614(07) CO RD 6.00 MI. FY 2012 UTILITIES CO RD: LEE BLVD. FROM NS-246 EAST 6.0 MI (UT FOR: 21614 (04)) $412,000 DIV. $412,000 COMANCHE 7 26850(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER WHISKEY CR, 2.0 MI NORTH & 4.7 MI EAST OF THE SH-17/US-277 JCT $79,104 DIV. $395,520 COMANCHE 7 26850(06) COBRGE 0.15 MI. FY 2012 RIGHT OF WAY CO BR OVER WHISKEY CR, 2.0 MI NORTH & 4.7 MI EAST OF THE SH-17/US-277 JCT ROW FOR 26850(04) $5,150 DIV. $5,150 COMANCHE 7 28373(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-170) OVER BEAVER CREEK, 3.0 MILES SOUTH AND 2.7 MILES EAST OF JCT SH-7/SH-65 (LOW WATER XING) PE FOR 28373(04) $56,897 DIV. $56,897 COMANCHE 7 28426(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-168) OVER TRIB. TO EAST CACHE CREEK, 1.0 MILE SOUTH AND 0.4 MILES EAST OF JCT I-44/SH-7 PE FOR 28426(04) $51,500 DIV. $51,500 COTTON 7 24858(04) COBRGE 2.00 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER CACHE CR., 2.1 MI. N. OF SH-53/SH-5 $1,776,750 DIV. $1,776,750 COTTON 7 27436(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO RD(NS-253) OVER A TRIB OF WEST CACHE CR. APPROX 1.0 MILE WEST & 0.2 MILE NORTH OF JCT US-277/SH-5 WEST. $70,452 DIV. $352,260 COTTON 7 27436(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO RD(NS-253) OVER A TRIB OF WEST CACHE CR. APPROX 1.0 MILE WEST & 0.2 MILE NORTH OF JCT US-277/SH-5 WEST. (RW FOR 27436(04)) $5,150 DIV. $5,150 COTTON 7 27436(07) COBRGE 0.20 MI. FY 2012 UTILITIES CO RD(NS-253) OVER A TRIB OF WEST CACHE CR. APPROX 1.0 MILE WEST & 0.2 MILE NORTH OF JCT US-277/SH-5 WEST. (UT FOR 27436(04)) $10,300 DIV. $10,300 COTTON 7 27486(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO RD(NS-257) OVER BIRD CREEK APPROX 3.0 MILE EAST & 1.7 MILE SOUTH OF JCT US-277/US-70 $65,920 DIV. $329,600 Friday, July 8, 2011 Page 6 of 63 5 YEAR CIRB WORK PLAN COTTON 7 27486(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO RD(NS-257) OVER BIRD CREEK APPROX 3.0 MILE EAST & 1.7 MILE SOUTH OF JCT US-277/US-70 ROW FOR 27486(04) $10,300 DIV. $10,300 COTTON 7 28372(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-179) OVER BEAVER CREEK, 4.0 MILES NORTH AND 2.8 MILES EAST OF JCT SH-53/SH-65 PE FOR 28372(04) $51,500 DIV. $51,500 CRAIG 8 24860(06) COBRGE 0.38 MI. FY 2012 RIGHT OF WAY CO. BR. OVER BIG CR., 2.0 MI. NE OF SH-10 (RW FOR 24860(04)) $20,600 DIV. $20,600 CRAIG 8 24860(07) COBRGE 0.38 MI. FY 2012 UTILITIES CO. BR. OVER BIG CR., 2.0 MI. NE OF SH-10 (UT FOR 24860(04)) $36,050 DIV. $36,050 CRAIG 8 28525(04) COBRGE FY 2012 BRIDGE & APPROACHES OTA OVERPASS $163,496 DIV. $2,489,304 CRAIG 8 28529(05) COBRGE FY 2012 PRELIMINARY ENGINEERING CO BR ON EW 240 OVER ELM CREEK APPX 2.0 MI NORTH OF VINITA (PE FOR 28529(04)) $92,700 DIV. $92,700 CRAIG 8 28530(05) COBRGE FY 2012 PRELIMINARY ENGINEERING CO BR ON NS 429 OVER BIG CREEK APPX 2.5 MILE SOUTH OF KANSAS SL (PE FOR 28530(04)) $66,950 DIV. $66,950 CREEK 8 22350(10) CO RD 1.00 MI. FY 2012 RIGHT OF WAY CO. RD: WEST 81ST STREET SOUTH, FROM FRANKOMA ROAD WEST TO SH-97 ROW FOR 22350(08) $247,200 DIV. $247,200 CREEK 8 22350(11) CO RD 1.00 MI. FY 2012 UTILITIES CO. RD: WEST 81ST STREET SOUTH, FROM FRANKOMA ROAD WEST TO SH-97 UT FOR 22350(08) $206,000 DIV. $206,000 CUSTER 5 24670(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER DEER CR. 1.4 MIS. E. AND 4.0 MIS N. OF CUSTER CITY, ON EW-89 $108,150 DIV. $540,750 CUSTER 5 24863(04) CO RD 4.80 MI. FY 2012 BRIDGE & APPROACHES CO. RD. US-183 AT ARAPAHO EXT. 4.8 MI. E. TO INTERSECT. OF MAJOR COLLECTORS $2,800,570 DIV. $2,800,570 CUSTER 5 24863(06) CO RD 4.80 MI. FY 2012 UTILITIES CO. RD. US-183 AT ARAPAHO EXT. 4.8 MI. E. TO INTERSECT. OF MAJOR COLLECTORS (UT FOR 24863(04)) $154,500 DIV. $154,500 CUSTER 5 24863(07) CO RD 4.80 MI. FY 2012 RIGHT OF WAY CO. RD. US-183 AT ARAPAHO EXT. 4.8 MI. E. TO INTERSECT. OF MAJOR COLLECTORS (RW FOR 24863(04)) $30,900 DIV. $30,900 CUSTER 5 28473(04) CO RD 0.00 MI. FY 2012 GRADE, DRAIN & SURFACE MAJOR COLLECTOR 2074C FROM EW101 & AIRPORT RD EAST & NORTH TO EW100 $164,800 DIV. $679,800 DELAWARE 8 20622(05) COBRGE 0.60 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER SPAVINAW CREEK $1,662,420 DIV. $1,662,420 DELAWARE 8 24864(04) COBRGE 0.38 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER FLY CR., 2.0 MIS. NW OF BERNICE $708,640 DIV. $708,640 DELAWARE 8 24864(06) COBRGE 0.38 MI. FY 2012 RIGHT OF WAY CO. BR. OVER FLY CR., 2.0 MIS. NW OF BERNICE RW FOR 24864(04) $44,290 DIV. $44,290 DELAWARE 8 24864(07) COBRGE 0.38 MI. FY 2012 UTILITIES CO. BR. OVER FLY CR., 2.0 MIS. NW OF BERNICE UT FOR 24864(04) $14,420 DIV. $14,420 DELAWARE 8 25901(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER UNNMAED CR., 1.0 MI. N. & 3.0 MI. E. OF THE SH-10/SH-25 JCT. $233,810 DIV. $583,701 Friday, July 8, 2011 Page 7 of 63 5 YEAR CIRB WORK PLAN DELAWARE 8 27820(05) COBRGE FY 2012 PRELIMINARY ENGINEERING CO BR OVER HONEY CREEK ON NS 467 PE FOR (04) $61,800 DIV. $61,800 DEWEY 5 24865(04) COBRGE 0.38 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER LONE CREEK, 3.2 MI. E. OF WEBB $1,002,705 DIV. $1,002,705 DEWEY 5 26653(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO BR APPROX 0.6 MILE WEST & 0.5 MILE NORTH OF SEILING. $72,100 DIV. $360,500 DEWEY 5 28695(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING COBR. REPLACE CO. BRIDGE OVER LONE CREEK,1.5MI. S. AND 3.8 MI. E OF WEBB. PE FOR 28695(04) $30,900 DIV. $30,900 ELLIS 6 24339(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO RD(EW-56) OVER LONG CREEK APPROX 5.0 MILE SOUTH & 6.3 MILE WEST OF SHATTUCK $355,350 DIV. $561,350 ELLIS 6 24866(04) COBRGE 1.00 MI. FY 2012 BRIDGE & APPROACHES CO. BR.(NS-190) OVER WOLF CREEK, APPROX. 1.5 MILES NORTH OF FARGO $2,884,000 DIV. $2,884,000 ELLIS 6 24866(06) COBRGE 1.00 MI. FY 2012 RIGHT OF WAY CO. BR. OVER WOLF CREEK (RW FOR 24866(04)) $10,300 DIV. $10,300 ELLIS 6 24866(07) COBRGE 1.00 MI. FY 2012 UTILITIES CO. BR. OVER WOLF CREEK (UT FOR 24866(04)) $10,300 DIV. $10,300 ELLIS 6 26248(04) CO RD 4.50 MI. FY 2012 RESURFACE CO. RD. 5.0 MI. S. OF FARGO, EXT. N. 4.5 MI. TO 7TH ST. IN FARGO $618,000 DIV. $1,648,000 GARFIELD 4 23739(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER CLEAR CR., 1 MI. S. AND 5.4 MI. W. OF LAHOMA, EW-44 $103,000 DIV. $515,000 GARFIELD 4 24867(04) COBRGE 2.50 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO. RD. NS-293 APPROX. 6.5 MI. W. OF DOUGLAS BEG @ EW-52.5, EXT. N. TO EW-50 (PHASE I) $1,545,000 DIV. $1,545,000 GARFIELD 4 24867(07) COBRGE 5.00 MI. FY 2012 GRADE, DRAIN & SURFACE CO. RD. NS-293 FROM EW-50 TO 45 (PHASE II) $2,266,000 DIV. $2,266,000 GARFIELD 4 24868(05) CO RD 11.00 MI. FY 2012 PRELIMINARY ENGINEERING CO. RD. EW-40 FROM NS-294 TO 305 (PE FOR 24868(04)(08)) $206,000 DIV. $206,000 GARFIELD 4 28421(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING COUNTY BRIDGE ON EW-54 OVER OTTER CREEK, 5.0 MILES SOUTH AND 2.4 WEST OF COVINGTON PE FOR 28421(04) CIRB FUNDS $48,410 DIV. $48,410 GARFIELD 4 28429(05) CO RD 3.00 MI. FY 2012 PRELIMINARY ENGINEERING COUNTY ROAD NS-285, STARTING 8.0 MI SOUTH AND 2.0 MI OF JCT US-81/US-412, (EW-51) EXTENDING NORTH 3.0 MILES PE FOR 28429(04) CIRB FUND $30,900 DIV. $30,900 GARVIN 3 24869(06) CO RD 5.00 MI. FY 2012 RIGHT OF WAY CO. RD. SH-19 AND NS-334, EXTEND N. TO EW-148 (RW FOR 24869(04)) $54,075 DIV. $54,075 GARVIN 3 24869(07) CO RD 5.00 MI. FY 2012 UTILITIES CO. RD. SH-19 AND NS-334, EXTEND N. TO EW-148 (UT FOR 24869(04)) $237,930 DIV. $237,930 GRADY 7 24945(06) CO RD 4.00 MI. FY 2012 RIGHT OF WAY CO RD FROM 0.5 MI NORTH OF I-44 NORTH TO SH-37 (MC-2686C) (SARA ROAD) ROW FOR 24945(04) $412,000 DIV. $412,000 GRADY 7 24945(07) CO RD 4.00 MI. FY 2012 UTILITIES CO RD FROM 0.5 MI NORTH OF I-44 NORTH TO SH-37 (MC-2686C) (SARA ROAD) UT FOR 24945(04) $309,000 DIV. $309,000 Friday, July 8, 2011 Page 8 of 63 5 YEAR CIRB WORK PLAN GRADY 7 26851(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER SALT CR, 1.7 MI NORTH & 2.0 MI EAST OF POCASSET $97,850 DIV. $489,250 GRADY 7 28341(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (NS-292) OVER EAST BITTER CREEK, 5.0 MILES EAST AND 3.3 MILES SOUTH OF AMBER PE FOR 28341(04) $46,350 DIV. $46,350 GRADY 7 28345(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-126) OVER A TRIBUTARY TO SALT CREEK, 8.5 MILES SOUTH AND 1.3 MILES EAST OF JCT US-81/SH-37 PE FOR 28245(04) $46,350 DIV. $46,350 GRANT 4 23655(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES COUNTY BRIDGE OVER SAND CREEK,4.0 MILES SOUTH AND 1.6 MILES EAST OF THE SH-11/SH-132 JCT. $103,000 DIV. $597,400 GRANT 4 24946(04) CO RD 5.00 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO RD EW-20, 3.3 MI. E. OF JEFFERSON AT NS-296, EXT. E. 5.0 MI. TO NS-301 (PHASE I) 5 BRS $4,017,000 DIV. $4,017,000 GRANT 4 24946(07) CO RD 11.00 MI. FY 2012 RIGHT OF WAY CO RD EW-20, 3.3 MI. E. OF JEFFERSON @ NS-196, EXT. E. 5.0 MI. TO NS-301 (PHASE I) RW FOR 24946(04) $10,300 DIV. $10,300 GRANT 4 24946(08) CO RD 11.00 MI. FY 2012 UTILITIES CO RD EW-20, 3.3 MI. E. OF JEFFERSON @ NS-196, EXT. E. 5.0 MI. TO NS-301 (PHASE I) UT FOR 24946(04) $10,300 DIV. $10,300 GRANT 4 25586(04) COBRGE 0.15 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER DEER CR., 2.3 MI. N. & 0.1 MI. E. OF DEER CREEK. $123,600 DIV. $545,900 GRANT 4 28360(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES ON NS-280 OVER SAND CREEK, 1.0 MILES EAST AND 2.9 MILES SOUTH OF JCT SH-11/SH-132 PE FOR 28360(04) CIRB FUNDS $48,410 DIV. $48,410 GRANT 4 28412(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING COUNTY BRIDGE ON EW-016 OVER POLECAT CREEK, 2.0 MILES SOUTH AND 5.2 MILES EAST OF JCT SH-11/US-81 PE FOR 28412(04) CIRB FUNDS $48,410 DIV. $48,410 GRANT 4 28418(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING COUNTY BRIDGE ON EW-09 OVER SAND CREEK, 5.0 MILES NORTH AND 0.4 MILES EAST OF JCT SH-11/SH-132 PE FOR 28418(04) $61,800 DIV. $61,800 GREER 5 24947(04) COBRGE 0.38 MI. FY 2012 BRIDGE & APPROACHES LOW WATER CROSSING OVER SALT FORK OF THE RED RIVER $2,420,500 DIV. $2,420,500 GREER 5 24947(06) COBRGE 0.38 MI. FY 2012 RIGHT OF WAY CO BR OVER SALT FORK OF THE RED RIVER RW FOR 24947(04) $10,558 DIV. $10,558 GREER 5 24947(07) COBRGE 0.38 MI. FY 2012 UTILITIES CO BR OVER SALT FORK OF THE RED RIVER UT. FOR 24947(04) $10,300 DIV. $10,300 GREER 5 24948(04) COBRGE 0.76 MI. FY 2012 BRIDGE & APPROACHES CO BR: OVER 2 UNNAMED CREEKS, 2.0 MI SOUTH OF GRANITE $643,750 DIV. $643,750 GREER 5 24948(07) COBRGE 0.76 MI. FY 2012 UTILITIES CO BR: OVER 2 UNNAMED CREEKS, 2.0 MI SOUTH OF GRANITE UT FOR 24948(04) $5,150 DIV. $5,150 GREER 5 26718(04) COBRGE 0.00 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER UNNAMED CREEK APPROX 9.0 MILE SOUTH & 0.4 MILE EAST OF GRANITE $72,100 DIV. $360,500 HARMON 5 24949(04) COBRGE 0.38 MI. FY 2012 BRIDGE & APPROACHES CO BR: OVER THE RED RIVER, 8.0 MI SOUTH & 3.0 MI WEST OF HOLLIS $2,717,269 DIV. $5,961,769 HARMON 5 24950(04) CO RD 1.30 MI. FY 2012 INTERSECT MODIF CO RD AT THE INTERSECTION OF EW 160 & NS 170, 1.0 MI WEST & 1.0 NORTH OF HOLLIS $852,840 DIV. $852,840 Friday, July 8, 2011 Page 9 of 63 5 YEAR CIRB WORK PLAN HARMON 5 28020(04) COBRGE 0.00 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER TURKEY CREEK APPROX 6.3 MILE NORTH & 1.1 MILE EAST OF GOULD $108,150 DIV. $396,550 HARPER 6 24964(05) COBRGE 0.38 MI. FY 2012 PRELIMINARY ENGINEERING CO BR: OVER BUFFALO CR, 0.5 MI WEST & 0.9 MI NORTH OF BUFFALO P.E FOR 24964(04) $92,700 DIV. $92,700 HARPER 6 25913(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO. BR OVER KIOWA CR., 4.8 MI. W. & 1.8 MI. N. OF LAVERNE $265,857 DIV. $741,600 HARPER 6 25914(04) CO RD 0.10 MI. FY 2012 RESURFACE CO RD: FROM EW-22/US-183, WEST 1.0 MI. TO NS-175, EXT NORTH 2.0 MI ON NS-175 TO EW-20, THEN EXT 1.0 MI EAST TO US-183 ON EW-20 $927,000 DIV. $1,442,000 HARPER 6 25915(04) CO RD 0.10 MI. FY 2012 RESURFACE CO RD: RESURFACE ON EW-21 FROM THE C/L EAST 5.0 MI TO NS-175 $927,000 DIV. $1,442,000 HASKELL 1 24965(04) COBRGE 1.50 MI. FY 2012 BRIDGE REHABILITATION CO. BR. ON NS-455 OVER SANS BOIS CR., AT KERR RESERVOIR, 2.5 MI. N. OF SH-9 AT KEOTA $1,648,000 DIV. $1,648,000 HASKELL 1 24966(04) COBRGE 0.47 MI. FY 2012 BRIDGE & APPROACHES CO BR ON NS-448 OVER SANS BOIS CR, 3.5 MI SOUTH & 4.5 MI EAST OF STIGLER $1,751,000 DIV. $1,751,000 HASKELL 1 24966(06) COBRGE 0.47 MI. FY 2012 RIGHT OF WAY CO BR ON NS-448 OVER SANS BOIS CR, 3.5 MI SOUTH & 4.5 MI EAST OF STIGLER ROW FOR 24966(04) $10,300 DIV. $10,300 HASKELL 1 24966(07) COBRGE 0.47 MI. FY 2012 UTILITIES CO BR ON NS-448 OVER SANS BOIS CR, 3.5 MI SOUTH & 4.5 MI EAST OF STIGLER UT FOR 24966(04) $10,300 DIV. $10,300 HASKELL 1 24967(05) CO RD 4.00 MI. FY 2012 PRELIMINARY ENGINEERING CO RD NS 447 ,BEGINNING APPROX. 3.5 MI EAST OF STIGLER AT SH. 9 AND EXTEND 4.0 MI NORTH TO GARLAND (TAMAHA RD PHASE 1) P.E. FOR 24967(04) $280,160 DIV. $280,160 HASKELL 1 25334(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER UNNAMED CR., 3.6 MI. S. AND 3.0 MI. W. OF SH-9/SH-2 JCT. IN WHITEFIELD. (DEL FR 10-10, ADD TO 04-11; FUNDING ISSUES) $78,280 DIV. $391,400 HASKELL 1 28411(06) CO RD 2.80 MI. FY 2012 RIGHT OF WAY CO. RD. EW1270 WEST LONA VALLEY RD. BEG. 2.0 MI W. & 4.0 MI N. OF KINTA,EXT 2.8 MI. EAST TO SH-2 (OVER UNNAMED CREEK) (R/W FOR 2841104) $66,950 DIV. $66,950 HASKELL 1 28411(07) CO RD 2.80 MI. FY 2012 UTILITIES CO. RD. EW1270 WEST LONA VALLEY RD. BEG. 2.0 MI W. & 4.0 MI N. OF KINTA,EXT 2.8 MI. EAST TO SH-2 (OVER UNNAMED CREEK) (UT FOR 2841104) $66,950 DIV. $66,950 HASKELL 1 28451(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR ON EW1220 OVER TRIB. OF OTTER CK 0.7 MI SOUTH & 0.7 MI WEST OF KEOTA $257,500 DIV. $683,920 HASKELL 1 28499(05) CO RD 6.50 MI. FY 2012 PRELIMINARY ENGINEERING CO RD NS 4580 & EW 1175 BEGINNING 3.0 MI EAST OF KEOTA AT SH 9 EXTEND NORTH 3.5 MI THEN 3.0 MI EAST. (STAR ROAD) PE FOR 28499(04) $206,000 DIV. $206,000 HUGHES 3 27797(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER CANEY BOGGY CREEK APPROX 7.3 MILE SOUTH & 3.5 MILE WEST OF STUART $530,450 DIV. $735,110 JACKSON 5 24970(04) COBRGE 1.14 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO BR OVER 3 UNNAMED CREEKS ALONG MC 3386C, FROM SH-5 NORTH TO US-62 $2,729,500 DIV. $2,729,500 JACKSON 5 26627(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO BR: OVER AN UNNAMED CR, 5.0 MI SOUTH & 4.6 MI EAST IF ALTUS ON EW-169 $82,400 DIV. $412,000 JACKSON 5 26627(06) COBRGE 0.10 MI. FY 2012 RIGHT OF WAY CO BR: OVER AN UNNAMED CR, 5.0 MI SOUTH & 4.6 MI EAST IF ALTUS ON EW-169 (ROW FOR 26627(04)) $5,150 DIV. $5,150 Friday, July 8, 2011 Page 10 of 63 5 YEAR CIRB WORK PLAN JACKSON 5 28021(08) COBRGE 0.00 MI. FY 2012 PRELIMINARY ENGINEERING CO BR OVER BITTER CREEK APPROX 5.5 MILE NORTH & 2.0 MILE WEST OF ALTUS (PE FOR 28021(04)) $24,786 DIV. $24,786 JACKSON 5 28723(04) COBRGE 9.00 MI. FY 2012 GRADE, DRAIN & SURFACE GRADE, DRAIN AND SURFACE ON NS-210 FROM HWY 5 NORTH TO HWY 62 FOR 9 MI. $2,729,500 DIV. $2,729,500 JEFFERSON 7 24971(04) CO RD 5.00 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD FROM 4.0 MI NORTH & 4.0 MI WEST OF RYAN, EXT NORTH TO US-70 $3,695,640 DIV. $3,695,640 JEFFERSON 7 27474(04) COBRGE 0.30 MI. FY 2012 BRIDGE & APPROACHES CO RD(EW-190 OVER MUD & COTTONWOOD CREEK APPROX 6.0 MILE NORTH & 0.7 MILE WEST OF JCT US-70/SH-89 IN RINGLING $172,216 DIV. $861,080 JEFFERSON 7 27474(06) COBRGE 0.30 MI. FY 2012 RIGHT OF WAY CO RD(EW-190 OVER MUD & COTTONWOOD CREEK APPROX 6.0 MILE NORTH & 0.7 MILE WEST OF JCT US-70/SH-89 IN RINGLING (RW FOR 27474(04)) $5,150 DIV. $5,150 JEFFERSON 7 27474(07) COBRGE 0.30 MI. FY 2012 UTILITIES CO RD(EW-190 OVER MUD & COTTONWOOD CREEK APPROX 6.0 MILE NORTH & 0.7 MILE WEST OF JCT US-70/SH-89 IN RINGLING (UT FOR 27474(04)) $10,300 DIV. $10,300 JEFFERSON 7 28375(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-207) OVER FROG CREEK, 0.5 MILES SOUTH AND 2.1 MILES EAST OF RYAN PE FOR 28375(04) $42,654 DIV. $42,654 JOHNSTON 3 22995(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR.: AND APPR. OVER TRIB. TO SANDY CR., 2.4 MI. N. AND 0.3 MI. W. OF COLEMAN $10,300 DIV. $172,871 KAY 4 22953(04) CO RD 3.00 MI. FY 2012 RESURFACE CO RD(NS-331)(WAVERLY RD) BEG @ EW-20.5 & EXT NORTH APPROX 1.6 MILE TO EW-18(HUBBARD RD); EXT EAST ON EW-18(HUBBARD RD) APPROX 0.1 MILE.(PHASE 1) $1,895,200 DIV. $2,925,200 KAY 4 22953(06) CO RD 3.00 MI. FY 2012 RIGHT OF WAY CO. RD.: ON NS-331 FROM EW-19.5 NORTH 1.5 MI TO EW-18, THEN EAST ON EW-18 2.1 MI. TO US-77. (NW OF PONCA CITY) ROW FOR 22953(04) $103,000 DIV. $103,000 KAY 4 22953(07) CO RD 3.60 MI. FY 2012 UTILITIES CO. RD.: ON NS-331 FROM EW-19.5 NORTH 1.5 MI TO EW-18, THEN EAST ON EW-18 2.1 MI. TO US-77. (NW OF PONCA CITY) UT FOR 22953(04) $126,587 DIV. $126,587 KAY 4 22953(09) CO RD 3.00 MI. FY 2012 RESURFACE CO RD EW-18(HUBBARD RD) BEG APPROX 0.1 MILE EAST OF NS-331(WAVERLY RD) & EXT EAST APPROX 1.9 MILE TO US-77. $4,120,000 DIV. $4,120,000 KAY 4 25084(06) COBRGE 0.38 MI. FY 2012 RIGHT OF WAY CO BR OVER DEER CR, 5.6 MI WEST & 4.3 MI SOUTH OF THE SH11/I-35 JCT ROW FOR 25084(04) $3,322 DIV. $3,322 KAY 4 28433(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING COUNTY BRIDGE ON EW-18 OVER BOIS D'ARC CREEK, 4.0 MILES SOUTH AND 3.5 MILES WEST OF KILDARE CN 103 PE FOR 28433(04) $46,350 DIV. $46,350 KAY 4 28434(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING COUNTY BRIDGE ON EW-03 OVER BEAVER CREEK, 0.2 MILES SOUTH AND 0.2 MILES WEST OF HARDY PE FOR 28434(04) CIRB ENG/BIA CONST $57,680 DIV. $57,680 KINGFISHER 4 25086(04) COBRGE 1.60 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO BR OVER UNCLE JOHN CR, 2.5 MI SOUTH & 0.6 MI EAST OF US-81/SH-33 $2,060,000 DIV. $2,060,000 KINGFISHER 4 25086(06) COBRGE 1.60 MI. FY 2012 RIGHT OF WAY CO BR OVER UNCLE JOHN CR, 2.5 MI SOUTH & 0.6 MI EAST OF US-81/SH-33 ROW FOR 25086(04) $66,435 DIV. $66,435 KINGFISHER 4 25086(07) COBRGE 1.60 MI. FY 2012 UTILITIES CO BR OVER UNCLE JOHN CR, 2.5 MI SOUTH & 0.6 MI EAST OF US-81/SH-33 UT FOR 25086(04) $166,088 DIV. $166,088 KINGFISHER 4 27391(04) COBRGE 0.18 MI. FY 2012 BRIDGE & APPROACHES CO BR ON NS-294 (REEDING RD) OVER CAMPBELL CREEK 4.9 MI WEST & 0.1 MI NORTH OF CASHION $206,000 DIV. $1,030,000 Friday, July 8, 2011 Page 11 of 63 5 YEAR CIRB WORK PLAN KINGFISHER 4 28361(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES ON EW-66 OVER TURKEY CREEK, 4.0 SOUTH AND 2.0 MILES WEST OF JCT SH-51/US-81 PE FOR 28361(04) CIRB FUNDS $48,410 DIV. $48,410 KINGFISHER 4 28435(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING COUNTY BRIDGE ON EW-84 OVER DEAD INDIAN CREEK, 4.0 MILES WEST, 5.0 MILES NORTH AND 0.5 MILES EAST OF OKARCHE PE FOR 28434(04) CIRB FUNDS $48,410 DIV. $48,410 KIOWA 5 25094(04) CO RD 0.00 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO. RD.(EW-160) BEG AT US-183 & EXT WEST APPROX. 4.0 MILE TO CO. RD(NS-220) $2,662,550 DIV. $2,662,550 KIOWA 5 25094(07) CO RD 0.00 MI. FY 2012 UTILITIES CO. RD.(EW-160) BEG AT US-183 & EXT WEST APPROX. 4.0 MILE TO CO. RD(NS-220) (UT FOR 25094(04)) $10,300 DIV. $10,300 KIOWA 5 26972(04) COBRGE 0.01 MI. FY 2012 BRIDGE & APPROACHES REPLACE LOW WATER CROSSING W/BRIDGE OVER EAST OTTER CREEK 3 MI NORTH & 0.1 MI WEST OF US-62/US-183 $15,450 DIV. $77,250 KIOWA 5 26972(06) COBRGE 0.01 MI. FY 2012 RIGHT OF WAY REPLACE LOW WATER CROSSING W/BRIDGE OVER EAST OTTER CREEK 3 MI NORTH & 0.1 MI WEST OF US-62/US-183 (ROW FOR 26972(04)) $5,150 DIV. $5,150 KIOWA 5 26972(07) COBRGE 0.01 MI. FY 2012 UTILITIES REPLACE LOW WATER CROSSING W/BRIDGE OVER EAST OTTER CREEK 3 MI NORTH & 0.1 MI WEST OF US-62/US-183 (UT FOR 26972(04)) $5,150 DIV. $5,150 LATIMER 2 25095(05) CO RD 4.00 MI. FY 2012 PRELIMINARY ENGINEERING CO. RD.(EW-159) BEG APPROX. 4.0 MILE WEST OF SH-2 & EXT EAST 4.0 MILE (PE FOR 2095(04)) $166,088 DIV. $166,088 LATIMER 2 25095(06) CO RD 4.00 MI. FY 2012 RIGHT OF WAY CO. RD.(EW-159) BEG APPROX. 4.0 MILE WEST OF SH-2 & EXT EAST 4.0 MILE (RW FOR 2095(04)) $37,389 DIV. $37,389 LATIMER 2 25095(07) CO RD 4.00 MI. FY 2012 UTILITIES CO. RD.(EW-159) BEG APPROX. 4.0 MILE WEST OF SH-2 & EXT EAST 4.0 MILE (UT FOR 2095(04)) $309,000 DIV. $309,000 LATIMER 2 26298(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER CROOKED CR., 1.1 MI. S. & 1.8 MI. E. OF SH-63 $103,000 DIV. $309,000 LATIMER 2 26298(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO. BR. OVER CROOKED CR., 1.1 MI. S. & 1.8 MI. E. OF SH-63 R/W FOR 2629804 $5,150 DIV. $5,150 LATIMER 2 26298(07) COBRGE 0.20 MI. FY 2012 UTILITIES CO. BR. OVER CROOKED CR., 1.1 MI. S. & 1.8 MI. E. OF SH-63 UT FOR 2629804 $5,150 DIV. $5,150 LATIMER 2 28609(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES FOURCHE MALINE CREEK ON NS-345.5, 3.1 MILES WEST AND 0.6 MILE SOUTH OF PANOLA $43,775 DIV. $43,775 LATIMER 2 28610(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER TRIBUTARY TO FOURCHE MALINE CREEK ON NS-435.5, 3.1 MILES WEST AND 0.4 MILE SOUTH OF PANOLA (PE FOR 2861004) $39,655 DIV. $39,655 LATIMER 2 28611(05) CO RD 4.00 MI. FY 2012 PRELIMINARY ENGINEERING RECONSTRUCT CRAVENS ROAD (EW-146) FROM 4.0 MILES SOUTH OF RED OAK AT JCT OF SH 82 EXTEND WEST 4.0 MILES (PE FOR 2861104) $103,000 DIV. $103,000 LATIMER 2 28612(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER BEAVER CREEK, LOCATED 1.2 MILES EAST OF CHILLI (PE FOR 286104) $30,900 DIV. $30,900 LATIMER 2 28613(05) COBRGE 0.35 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER WEST FORK CREEK ON EW-158, LOCATED 5.6 MILE WEST AND 0.3 MILE WEST OF YANUSH (PE FOR 2861304) $36,050 DIV. $36,050 LATIMER 2 28614(04) CO RD 1.00 MI. FY 2012 WIDEN & RESURFACE RECONSTRUCT CRAVENS ROAD (EW-146) FROM 4.0 MILES SOUTH AND 9.0 MILES WEST OF RED OAK EXTENDING EAST 1.0 MILES $103,000 DIV. $618,000 Friday, July 8, 2011 Page 12 of 63 5 YEAR CIRB WORK PLAN LATIMER 2 28614(05) CO RD 1.00 MI. FY 2012 PRELIMINARY ENGINEERING RECONSTRUCT CRAVENS ROAD (EW-146) FROM 4.0 MILES SOUTH AND 9.0 MILES WEST OF RED OAK EXTENDING EAST 1.0 MILES (PE FOR 2861404) $39,140 DIV. $39,140 LATIMER 2 28614(06) CO RD 1.00 MI. FY 2012 RIGHT OF WAY RECONSTRUCT CRAVENS ROAD (EW-146) FROM 4.0 MILES SOUTH AND 9.0 MILES WEST OF RED OAK EXTENDING EAST 1.0 MILES (RW FOR 2861404) $5,150 DIV. $5,150 LATIMER 2 28614(07) CO RD 1.00 MI. FY 2012 UTILITIES RECONSTRUCT CRAVENS ROAD (EW-146) FROM 4.0 MILES SOUTH AND 9.0 MILES WEST OF RED OAK EXTENDING EAST 1.0 MILES (UT FOR 2861404) $10,300 DIV. $10,300 LATIMER 2 28615(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER LITTLE BUFFALO CREEK ON NS-439, LOCATED 5.5 MILES EAST AND 1.4 MILES NORTH OF YANUSH (PE FOR 2861504) $25,750 DIV. $25,750 LEFLORE 2 22885(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR.: AND APPR. OVER BLACK FORK CR., APPROX 0.5 MI. E. OF HODGENS $1,648,000 DIV. $1,648,000 LEFLORE 2 22885(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO. BR.: AND APPR. OVER BLACK FORK CR., APPROX 0.5 MI. E. OF HODGENS (RW FOR 22885(04)) $19,997 DIV. $19,997 LEFLORE 2 25096(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES CO. RD(EW-142) OVER CASTON CREEK APPROX. 0.7 MILE WEST & 0.5 MILE SOUTH OF JCT OF US-270/US-59 $1,854,000 DIV. $1,854,000 LEFLORE 2 25096(06) COBRGE 0.25 MI. FY 2012 RIGHT OF WAY CO. RD(EW-142) OVER CASTON CREEK APPROX. 0.7 MILE WEST & 0.5 MILE SOUTH OF JCT OF US-270/US-59 (RW FOR 25096(04)) $10,300 DIV. $10,300 LEFLORE 2 25096(07) COBRGE 0.25 MI. FY 2012 UTILITIES CO. RD(EW-142) OVER CASTON CREEK APPROX. 0.7 MILE WEST & 0.5 MILE SOUTH OF JCT OF US-270/US-59 (UT FOR 25096(04)) $10,300 DIV. $10,300 LEFLORE 2 25097(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES CO. RD(NS-457.5) OVER BRAZIL CREEK APPROX. 4.0 MILE SOUTH OF SH-31. $1,442,000 DIV. $1,442,000 LEFLORE 2 25097(06) COBRGE 0.25 MI. FY 2012 RIGHT OF WAY CO. RD(NS-457.5) OVER BRAZIL CREEK APPROX. 4.0 MILE SOUTH OF SH-31. (RW FOR 25097(04)) $10,300 DIV. $10,300 LEFLORE 2 25097(07) COBRGE 0.25 MI. FY 2012 UTILITIES CO. RD(NS-457.5) OVER BRAZIL CREEK APPROX. 4.0 MILE SOUTH OF SH-31. (UT FOR 25097(04)) $10,300 DIV. $10,300 LEFLORE 2 25101(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES CO. RD(NS-480) OVER THE POTEAU RIVER APPROX. 1.0 MILE NORTH OF LOVING $1,545,000 DIV. $1,545,000 LEFLORE 2 25101(06) COBRGE 0.00 MI. FY 2012 RIGHT OF WAY CO. RD(NS-480) OVER THE POTEAU RIVER APPROX. 1.0 MILE NORTH OF LOVING (RW FOR 25101(04)) $22,660 DIV. $22,660 LEFLORE 2 25101(07) COBRGE 0.00 MI. FY 2012 UTILITIES CO. RD(NS-480) OVER THE POTEAU RIVER APPROX. 1.0 MILE NORTH OF LOVING (UT FOR 25101(04)) $30,900 DIV. $30,900 LEFLORE 2 26896(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER TRIB OF BUZZARD CREEK APPROX 2.5 MILE EAST & 0.9 MILE SOUTH OF TALIHINA. $36,050 DIV. $36,050 LEFLORE 2 26903(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER BUZZARD CREEK APPROX 3.0 MILE EAST & 0.9 MILE SOUTH OF TALAHINA $463,500 DIV. $463,500 LEFLORE 2 26904(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER UNNAMED CREEK APPROX 3.0 MILE SOUTH & 1.3 MILE WEST OF POCOLA $51,500 DIV. $298,700 LEFLORE 2 26905(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER UNNAMED CREEK APPROX 4.0 MILE SOUTH & 1.7 MILE WEST OF POCOLA $72,100 DIV. $319,300 Friday, July 8, 2011 Page 13 of 63 5 YEAR CIRB WORK PLAN LEFLORE 2 26905(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO BR OVER UNNAMED CREEK APPROX 4.0 MILE SOUTH & 1.7 MILE WEST OF POCOLA (RW FOR 26905(04)) $5,150 DIV. $5,150 LEFLORE 2 26905(07) COBRGE 0.20 MI. FY 2012 UTILITIES CO BR OVER UNNAMED CREEK APPROX 4.0 MILE SOUTH & 1.7 MILE WEST OF POCOLA (UT FOR 26905(04)) $10,300 DIV. $10,300 LEFLORE 2 28616(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER BIG CREEK, LOCATED 0.6 MILES WEST OF HICKS PE FOR 2861604 $30,900 DIV. $30,900 LEFLORE 2 28617(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 2.2 MILES NORTH AND 0.8 MILE WEST OF HICKS PE FOR 2861704 $25,750 DIV. $25,750 LINCOLN 3 25087(04) CO RD 5.50 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO RD FR 3.8 MI SOUTH & 2.0 MI EAST OF CARNEY, EXT EAST & SOUTH TO SH-18 $3,986,100 DIV. $3,986,100 LOGAN 4 23017(04) COBRGE 0.12 MI. FY 2012 BRIDGE & APPROACHES CO. BR.: AND APPR OVER OTTER CR., 3 MI. S. AND 1.4 MI. E. OF SH-74/SH-51 $248,601 DIV. $745,802 LOGAN 4 25089(04) CO RD 5.00 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD: FR 1.5 MI WEST OF I-35 ON WATERLOO ROAD NORTH ON COLTRANE 5.0 MI PHASE I $2,120,000 DIV. $2,120,000 LOGAN 4 25089(05) CO RD 5.00 MI. FY 2012 PRELIMINARY ENGINEERING CO RD: FR 1.5 MI WEST OF I-35 ON WATERLOO ROAD NORTH ON COLTRANE 5.0 MI ( PE FOR 25089(04) $87,584 DIV. $87,584 LOGAN 4 25089(06) CO RD 5.00 MI. FY 2012 RIGHT OF WAY CO RD: FR 1.5 MI WEST OF I-35 ON WATERLOO ROAD NORTH ON COLTRANE 5.0 MI ( ROW FOR 25089(04) $772,500 DIV. $772,500 LOGAN 4 25089(07) CO RD 5.00 MI. FY 2012 UTILITIES CO RD: FR 1.5 MI WEST OF I-35 ON WATERLOO ROAD NORTH ON COLTRANE 5.0 MI ( UT FOR 25089(04) $1,030,000 DIV. $1,030,000 LOGAN 4 25090(05) COBRGE 0.38 MI. FY 2012 PRELIMINARY ENGINEERING CO BR OVER SKELETON CR, 2.0 MI WEST & 1.3 MI SOUTH OF SH-51/SH-74E PE FOR 25090(04) $92,700 DIV. $92,700 LOGAN 4 28686(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING CO BR ON EW-69 OVER SKELETON CREEK, 7.0 SOUTH AND 5.3 EAST OF JCT SH-51/SH-74 PE FOR 28686(04) $51,500 DIV. $51,500 LOGAN 4 28726(05) CO RD 3.00 MI. FY 2012 PRELIMINARY ENGINEERING CHARTER OAK PE FOR 28726(04) $36,050 DIV. $36,050 LOVE 7 25091(04) CO RD 4.50 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO RD: FR I-35 WEST 4.5 MI ON MC4304, INCLUDES BR OVER SOUTH BRANCH HICKORY CR & AN UNNAMED CR $4,294,070 DIV. $4,294,070 LOVE 7 25091(06) CO RD 4.50 MI. FY 2012 RIGHT OF WAY CO RD: FR I-35 WEST 4.5 MI ON MC4304, INCLUDES BR OVER SOUTH BRANCH HICKORY CR & AN UNNAMED CR (ROW FOR 25091(04) $128,750 DIV. $128,750 LOVE 7 25091(07) CO RD 4.50 MI. FY 2012 UTILITIES CO RD: FR I-35 WEST 4.5 MI ON MC4304, INCLUDES BR OVER SOUTH BRANCH HICKORY CR & AN UNNAMED CR (UT FOR 25091(04) $257,500 DIV. $257,500 MAJOR 6 24615(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO RD(EW-48) OVER WEST BRANCH BARNEY CREEK APPROX 7.0 MILE SOUTH & 6.25 MILE EAST OF BOUSE JUNCTION, JCT OF US-412/US-281. $245,257 DIV. $515,000 MAJOR 6 25104(04) CO RD 6.00 MI. FY 2012 RESURFACE CO RD(EW-54) BEG 3.0 MILES EAST OF SH-58 & EXT EAST 6.0 MILE PHASE I $2,472,000 DIV. $2,472,000 MAJOR 6 25104(06) CO RD 9.00 MI. FY 2012 RIGHT OF WAY CO RD(EW-54) BEG @ SH-58 & EXT EAST 9.0 MILE (RW FOR 25104(04)(08)) $10,300 DIV. $10,300 Friday, July 8, 2011 Page 14 of 63 5 YEAR CIRB WORK PLAN MAJOR 6 25104(07) CO RD 9.00 MI. FY 2012 UTILITIES CO RD(EW-54) BEG @ SH-58 & EXT EAST 9.0 MILE (UT FOR 25104(04)(08)) $10,300 DIV. $10,300 MAJOR 6 25104(08) CO RD 3.00 MI. FY 2012 RESURFACE CO RD(EW-54) BEG @ SH-58 & EXT EAST 3.0 MILE PHASE II $1,030,000 DIV. $1,030,000 MAJOR 6 25831(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER EAGLE CR., 2.2 MI. N. OF CLEO SPRINGS OKLAHOMA. $375,950 DIV. $736,450 MAJOR 6 28353(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES ON NS-228 OVER CUDDY CREEK, 3.0 MILES WEST AND 5.1 MILES NORTH OF JCT US-412/US-281 PE FOR 28353(04) CIRB FUNDS $42,230 DIV. $42,230 MARSHALL 2 21097(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES COUNTY BRIDGE OVER CANEY CREEK, 1.7 MILES SOUTH AND 0.4 MILES WEST OF KINGSTON $309,000 DIV. $664,968 MARSHALL 2 21097(06) COBRGE 0.25 MI. FY 2012 RIGHT OF WAY COUNTY BRIDGE OVER CANEY CREEK, 1.7 MILES SOUTH AND 0.4 MILES WEST OF KINGSTON R/W FOR 2109704 $5,150 DIV. $5,150 MARSHALL 2 21097(07) COBRGE 0.25 MI. FY 2012 UTILITIES COUNTY BRIDGE OVER CANEY CREEK, 1.7 MILES SOUTH AND 0.4 MILES WEST OF KINGSTON UT FOR 2109704 $5,150 DIV. $5,150 MARSHALL 2 25105(07) CO RD 0.00 MI. FY 2012 RIGHT OF WAY (04)CORD(EW-200)(LINN RD) BEG 5 MI E OF SH-99 & EXT E & S 4.8 MI.(PHASE I) (05)CORD(LINN RD) BEG @ SH-99 & EXT E 5 MI (PHSE II)(RW FOR 25105(04)(05)) $11,781 DIV. $11,781 MARSHALL 2 25105(08) CO RD 0.00 MI. FY 2012 UTILITIES (04)CORD(EW-200)(LINN RD) BEG 5 MI E OF SH-99 & EXT E & S 3.9 MI.(PHASE I) (05)CORD(LINN RD) BEG @ SH-99 & EXT E 5 MI (PHSE II)(UT FOR 25105(04)(05)) $15,457 DIV. $15,457 MARSHALL 2 28618(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 2.5 MILES WEST AND 5.4 MILES SOUTH OF MADILL PE FOR 2861804 $41,200 DIV. $41,200 MARSHALL 2 28619(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 1.0 MILE NORTH OF TYLER PE FOR 2861904 $51,500 DIV. $51,500 MARSHALL 2 28620(05) CO RD 4.00 MI. FY 2012 PRELIMINARY ENGINEERING RECONSTRUCT SHAY CUT OFF ROAD (EW-212) FROM SH 99 ENTEND EAST 4.0 MILES PE FOR 2862004 $103,000 DIV. $103,000 MARSHALL 2 28622(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER UNNAMED CREEK ON NS-348, LOCATED 2.5 MILES WEST AND 3.6 MILES SOUTH OF MADILL PE FOR 2862204 $36,050 DIV. $36,050 MARSHALL 2 28623(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER UNNAMED CREEK ON EW-203, LOCATED 4.0 MILES WEST AND 1.5 MILE SOUTH OF MADILL PE FOR 2862304 $36,050 DIV. $36,050 MAYES 8 06549(04) CO RD 2.00 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD NS 432 BEGINNING AT SH 69A AND EXTENDING NORTH 2 MILES TO EW 51. $2,915,930 DIV. $2,915,930 MAYES 8 06549(06) CO RD 2.00 MI. FY 2012 RIGHT OF WAY CO. RD. NS 432, BEG. AT SH 69A AND EXTENDING NORTH 2 MILES TO EW 51 RW FOR 06549(04) $15,450 DIV. $15,450 MAYES 8 06549(07) CO RD 2.00 MI. FY 2012 UTILITIES CO. RD. NS 432, BEG. AT SH 69A AND EXTENDING NORTH 2 MILES TO EW 51 UT FOR 06549(04) $108,150 DIV. $108,150 MAYES 8 25416(06) COBRGE 0.00 MI. FY 2012 RIGHT OF WAY COUNTY ROAD(EW-50) OVER PRYOR CREEK APPROX 1.0 MILE WEST OF US-69 (RW FOR 25416(04)) $8,219 DIV. $8,219 MAYES 8 25416(07) COBRGE 0.00 MI. FY 2012 UTILITIES COUNTY ROAD(EW-50) OVER PRYOR CREEK APPROX 1.0 MILE WEST OF US-69 (UT FOR 25416(04)) $12,066 DIV. $12,066 Friday, July 8, 2011 Page 15 of 63 5 YEAR CIRB WORK PLAN MAYES 8 25417(04) CO RD 0.00 MI. FY 2012 GRADE, DRAIN & SURFACE CHIMNEY ROCK RD(EW-50) BEG @ SH-82 & EXT EAST 2.0 MILE $3,493,760 DIV. $4,523,760 MAYES 8 28497(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES OLD HWY 33(EW-590) OVER UP RAILROAD APPROX 0.3 MILE WEST OF US-69 $177,160 DIV. $491,310 MCCLAIN 3 25448(05) CO RD 0.00 MI. FY 2012 PRELIMINARY ENGINEERING CO RD: FROM US-77 EAST 3.0 MI (PHASE I) (4450C) P.E. FOR 25448(04) & (08) $298,700 DIV. $298,700 MCCLAIN 3 25448(06) CO RD 0.00 MI. FY 2012 RIGHT OF WAY CO RD: FROM US-77 EAST 3.0 MI (PHASE I) (4450C) ROW FOR 25448(04) & (08) $55,363 DIV. $55,363 MCCLAIN 3 25448(07) CO RD 0.00 MI. FY 2012 UTILITIES CO RD: FROM US-77 EAST 3.0 MI (PHASE I) (4450C) UT FOR 25448(04) & (08) $55,363 DIV. $55,363 MCCLAIN 3 25449(04) CO RD 0.00 MI. FY 2012 BRIDGE & APPROACHES CO RD: 3 LOCATIONS NEAR COLE, CURVE CORRECTIONS $1,158,195 DIV. $1,158,195 MCCLAIN 3 25449(06) CO RD 0.00 MI. FY 2012 RIGHT OF WAY CO RD: 3 LOCATIONS NEAR COLE, CURVE CORRECTIONS ROW FOR 25449(04) $54,075 DIV. $54,075 MCCLAIN 3 25449(07) CO RD 0.00 MI. FY 2012 UTILITIES CO RD: 3 LOCATIONS NEAR COLE, CURVE CORRECTIONS UT FOR 25449(04) $108,150 DIV. $108,150 MCCURTAIN 2 21778(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR.: OVER LUKFATA CREEK APPROX 1.4 MI. S. AND 1.2 MI. W. OF STEEL JUNCTION $103,000 DIV. $721,000 MCCURTAIN 2 25467(06) COBRGE 0.25 MI. FY 2012 RIGHT OF WAY CO BR: OVER LITTLE RIVER & TRIBUTARY, 2.6 MI NORTH OF IDABEL ROW FOR 25467(04) $15,836 DIV. $15,836 MCCURTAIN 2 25467(07) COBRGE 0.25 MI. FY 2012 UTILITIES CO BR: OVER LITTLE RIVER & TRIBUTARY, 2.6 MI NORTH OF IDABEL UT FOR 25467(04) $21,115 DIV. $21,115 MCCURTAIN 2 25468(04) COBRGE 0.40 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER YANUBBEE CR, 2.0 MI SOUTH & 1.5 MI EAST OF BROKEN BOW (4532C) $1,030,000 DIV. $1,030,000 MCCURTAIN 2 25468(06) COBRGE 0.40 MI. FY 2012 RIGHT OF WAY CO BR OVER YANUBBEE CR, 2.0 MI SOUTH & 1.5 MI EAST OF BROKEN BOW (4532C) ROW FOR 25468(04) $11,713 DIV. $11,713 MCCURTAIN 2 25468(07) COBRGE 0.40 MI. FY 2012 UTILITIES CO BR OVER YANUBBEE CR, 2.0 MI SOUTH & 1.5 MI EAST OF BROKEN BOW (4532C) UT FOR 25468(04) $10,815 DIV. $10,815 MCCURTAIN 2 25469(05) COBRGE 1.70 MI. FY 2012 PRELIMINARY ENGINEERING CO BR OVER LITTLE RIVER CR, 1.6 MI NORTH & 0.5 MI EAST OF GARVIN (4530C) PE FOR 25469(04) $93,009 DIV. $93,009 MCCURTAIN 2 25470(05) COBRGE 0.30 MI. FY 2012 PRELIMINARY ENGINEERING CO BR OVER GLOVER, GOLDEN & HOLLY CREEKS, 3.6 MI NORTH OF IDABEL PE FOR 25470(04) $42,230 DIV. $42,230 MCCURTAIN 2 25827(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER WATERHOLE CR., 0.5 MI. S. OF IRON STOB CORNER $283,250 DIV. $592,250 MCCURTAIN 2 25827(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO. BR. OVER WATERHOLE CR., 0.5 MI. S. OF IRON STOB CORNER R/W FOR 2582704 $5,150 DIV. $5,150 MCCURTAIN 2 25827(07) COBRGE 0.20 MI. FY 2012 UTILITIES CO. BR. OVER WATERHOLE CR., 0.5 MI. S. OF IRON STOB CORNER UT FOR 2582704 $5,150 DIV. $5,150 Friday, July 8, 2011 Page 16 of 63 5 YEAR CIRB WORK PLAN MCCURTAIN 2 25828(05) COBRGE 0.20 MI. FY 2012 PRELIMINARY ENGINEERING CO. BR. OVER BIG EAGLE CR., 1.6 MI. N. & 2.1 MI. W. OF SMITHVILLE (PE FOR 25828(04)) $36,050 DIV. $36,050 MCCURTAIN 2 28624(05) CO RD 5.00 MI. FY 2012 PRELIMINARY ENGINEERING RECONSTRUCT IRON STOBB (NS-455) FROM GLOVER EXTENDING SOUTH 4.7 MILES PE FOR 2862404 $82,400 DIV. $82,400 MCCURTAIN 2 28625(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER HOLLY CREEK (ROUTE 4530C), LOCATED 1.5 MILE WEST AND 0.5 MILE SOUTH OF BROKEN BOW PE FOR 2862504 $30,900 DIV. $30,900 MCINTOSH 1 20584(04) COBRGE 0.13 MI. FY 2012 BRIDGE & APPROACHES COUNTY BRIDGE ON NS 398 OVER MILL CREEK, SOUTH OF VERNON $257,500 DIV. $515,000 MCINTOSH 1 22223(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO.BR. OVER TRIB TO MILL CREEK, 1.0 KILE NORTH AND 7.9 MILES EAST OF HANNA $309,000 DIV. $527,360 MCINTOSH 1 23511(04) COBRGE 0.25 MI. FY 2012 BRIDGE REHABILITATION CO. RD(EW-114) OVER DUCHESS APPROX. 0.5 MILE WEST OF PORUM LANDING $3,399,000 DIV. $3,399,000 MCINTOSH 1 23511(07) COBRGE 0.25 MI. FY 2012 UTILITIES CO. RD(EW-114) OVER DUCHESS APPROX. 0.5 MILE WEST OF PORUM LANDING (UT FOR 23511(04)) $1,030 DIV. $1,030 MCINTOSH 1 25102(04) COBRGE 1.00 MI. FY 2012 BRIDGE REHABILITATION CO. BR. ON NS-410 OVER LAKE EUFAULA, 3.0 MI. S. & 0.7 MI E. OF VIVIAN $1,133,000 DIV. $1,133,000 MCINTOSH 1 25103(06) CO RD 3.80 MI. FY 2012 RIGHT OF WAY CO. RD(EW103) BEG @ OLD US-69(NS421) & EXT EAST 2.0 MI., NORTH 1.0 MI. (NS423), EAST 0.2MI.(EW102), NORTH 0.6MI,(NS4232). (RW FOR 25103(04)) $77,250 DIV. $77,250 MCINTOSH 1 25103(07) CO RD 3.80 MI. FY 2012 UTILITIES CO. RD(EW103) BEG @ OLD US-69(NS421) & EXT EAST 2.0 MI., NORTH 1.0 MI. (NS423), EAST 0.2MI.(EW102), NORTH 0.6MI,(NS4232). (UT FOR 25103(04)) $77,250 DIV. $77,250 MURRAY 7 22688(04) COBRGE 0.21 MI. FY 2012 BRIDGE & APPROACHES CO BR.: REPLACE EXISTING LOW-WATER CROSSING OVER LOWRANCE CR., 3.9 MI. S. AND 0.4 MI. E. OF THE S. JCT. OF US-177/SH-7 $72,100 DIV. $360,500 MURRAY 7 22688(06) COBRGE 0.21 MI. FY 2012 RIGHT OF WAY CO BR.: REPLACE EXISTING LOW-WATER CROSSING OVER LOWRANCE CR., 3.9 MI. S. AND 0.4 MI. E. OF THE S. JCT. OF US-177/SH-7 (RW FOR: 22688 (04)) $5,150 DIV. $5,150 MURRAY 7 22688(07) COBRGE 0.21 MI. FY 2012 UTILITIES CO BR.: REPLACE EXISTING LOW-WATER CROSSING OVER LOWRANCE CR., 3.9 MI. S. AND 0.4 MI. E. OF THE S. JCT. OF US-177/SH-7 (UT FOR: 22688 (04)) $5,150 DIV. $5,150 MURRAY 7 25418(04) CO RD 0.00 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE COUNTY ROAD(EW-175) UNDER RR & OVER DRY SANDY CREEK APPROX. 2.0 MILE SOUTH OF DAVIS $5,873,060 DIV. $5,873,060 MURRAY 7 25418(06) CO RD 0.00 MI. FY 2012 RIGHT OF WAY COUNTY ROAD(EW-175) UNDER RR & OVER DRY SANDY CREEK APPROX. 2.0 MILE SOUTH OF DAVIS (RW FOR 25418(04)) $1,030,000 DIV. $1,030,000 MURRAY 7 25418(07) CO RD 0.00 MI. FY 2012 UTILITIES COUNTY ROAD(EW-175) UNDER RR & OVER DRY SANDY CREEK APPROX. 2.0 MILE SOUTH OF DAVIS (UT FOR 25418(04)) $515,000 DIV. $515,000 MURRAY 7 28422(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES BRIDGE AND APPROACHES (EW-170) OVER MILL CREEK, 0.5 MILES SOUTH AND AND 1.0 MILE WEST OF HICKORY $82,400 DIV. $412,000 MURRAY 7 28422(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-170) OVER MILL CREEK, 0.5 MILES SOUTH AND AND 1.0 MILE WEST OF HICKORY PE FOR 28422(04) $46,350 DIV. $46,350 MURRAY 7 28422(06) COBRGE 0.25 MI. FY 2012 RIGHT OF WAY BRIDGE AND APPROACHES (EW-170) OVER MILL CREEK, 0.5 MILES SOUTH AND AND 1.0 MILE WEST OF HICKORY ROW FOR 28422(04) $5,150 DIV. $5,150 Friday, July 8, 2011 Page 17 of 63 5 YEAR CIRB WORK PLAN MURRAY 7 28422(07) COBRGE 0.25 MI. FY 2012 UTILITIES BRIDGE AND APPROACHES (EW-170) OVER MILL CREEK, 0.5 MILES SOUTH AND AND 1.0 MILE WEST OF HICKORY UT FOR 28422(04) $10,300 DIV. $10,300 MURRAY 7 28427(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-167) OVER ROCK CREEK, 1.5 MILES SOUTH AND 1.7 MILES EAST OF OAK GROVE PE FOR 28427(04) $46,350 DIV. $46,350 MURRAY 7 28440(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW178) OVER BRANCH CREEK, 2.5 MILES NORTH AND 0.6 MILES WEST OF DRAKE PE FOR 28440(04) $51,500 DIV. $51,500 MUSKOGEE 1 20506(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES COUNTY BRIDGE ON EW-95 OVER CLOUD CREEK, 0.7 MILES SOUTH AND 0.7 MILES EAST OF BOYNTON $154,500 DIV. $515,000 MUSKOGEE 1 25419(04) COBRGE 0.50 MI. FY 2012 BRIDGE & APPROACHES CO BR ON EW-83.5 (R.R. RD) OVER GRAND RIVER, 0.5 MI. N. & 0.6 MI. W. OF FORT GIBSON. $5,768,000 DIV. $5,768,000 MUSKOGEE 1 25419(06) COBRGE 0.50 MI. FY 2012 RIGHT OF WAY CO BR ON EW-83.5 (R.R. RD.) OVER GRAND RIVER, 0.5 M. N. & 0.6 MI. W. OF FORT GIBSON. (RW FOR 25419(04)) $25,750 DIV. $25,750 MUSKOGEE 1 25419(07) COBRGE 0.50 MI. FY 2012 UTILITIES CO BR ON EW-83.5 (R.R. RD.) OVER GRAND RIVER, 0.5 MI. N. & 0.6 MI. W. OF FORT GIBSON. (UT FOR 25419(04)) $77,250 DIV. $77,250 MUSKOGEE 1 25420(05) COBRGE 0.50 MI. FY 2012 PRELIMINARY ENGINEERING CO RD(EW-87) OVER PECAN CREEK APPROX. 0.5 MILE SOUTH & 3.0 MILE EAST OF TAFT (PE FOR 25420(04)) $103,000 DIV. $103,000 MUSKOGEE 1 25420(06) COBRGE 0.50 MI. FY 2012 RIGHT OF WAY CO RD(EW-87) OVER PECAN CREEK APPROX. 0.5 MILE SOUTH & 3.0 MILE EAST OF TAFT (RW FOR 25420(04)) $51,500 DIV. $51,500 MUSKOGEE 1 25420(07) COBRGE 0.50 MI. FY 2012 UTILITIES CO RD(EW-87) OVER PECAN CREEK APPROX. 0.5 MILE SOUTH & 3.0 MILE EAST OF TAFT (UT FOR 25420(04)) $51,500 DIV. $51,500 MUSKOGEE 1 27425(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER SOUTH FORK ON EW 110 4.5 MI NORTH & 2.5 MI EAST OF PORUM $257,500 DIV. $1,030,000 NOBLE 4 22352(04) COBRGE 0.21 MI. FY 2012 BRIDGE & APPROACHES BRIDGES AND APPR. OVER EAST WARREN CR., 0.7 MI. E. & 0.8 MI. N. LUCIEN. $91,593 DIV. $457,968 NOBLE 4 23651(04) COBRGE 0.12 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO. RD. NS-318, OVER RED ROCK CR., 3.0 MI. W. AND 0.3 MI. S. OF CERES $103,000 DIV. $515,000 NOBLE 4 25421(04) CO RD 6.00 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD(NS-327)(RED ROCK ROAD) BEG APPROX 6.0 MILE WEST OF US-64/US-177 JCT & EXT NORTH APPROX 6.0 MILE TO EW-44 (5254C) $3,090,000 DIV. $4,120,000 NOBLE 4 25421(07) CO RD 0.00 MI. FY 2012 UTILITIES CO RD(NS-327) BETWEEN SH-15 & US-64 (5254C) (UT FOR 25421(04)(05)) $10,300 DIV. $10,300 NOBLE 4 25421(08) CO RD 0.00 MI. FY 2012 RIGHT OF WAY CO RD(NS-327) BETWEEN SH-15 & US-64 (5254C) (RW FOR 25421(04)(05)) $10,300 DIV. $10,300 NOBLE 4 25422(07) CO RD 0.00 MI. FY 2012 RIGHT OF WAY (04)CORD(NS-312) BEG APPROX 4.5 MI N OF US-412 & EXT N APPROX 5 MI TO SH-15 (PHASE 1); RW FOR 25422(04) $10,300 DIV. $10,300 NOBLE 4 25422(08) CO RD 0.00 MI. FY 2012 UTILITIES (04)CORD(NS-312) BEG APPROX 4.5 MI N OF US-412 & EXT N APPROX 5 MI TO SH-15 (PHASE 1); UT FOR 25422(04) $10,300 DIV. $10,300 NOBLE 4 27720(06) COBRGE 0.10 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE & APPROACHES ON CO RD EW-35 OVER GRASSY CREEK 0.1 MI WEST & 2 MI SOUTH OF I-35/SH-15 JCT PE FOR 27720(04) CIRB FUNDS $51,500 DIV. $51,500 Friday, July 8, 2011 Page 18 of 63 5 YEAR CIRB WORK PLAN NOBLE 4 28362(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES ON EW-47 OVER COW CREEK, 2.2 MILES EAST, 3.0 MILES NORTH AND 0.7 MILES EAST OF JCT US-64/US-77 PE FOR 28362(04) CIRB FUNDS $51,500 DIV. $51,500 NOWATA 8 25423(04) COBRGE 0.00 MI. FY 2012 BRIDGE & APPROACHES CO RD(EW-15) OVER CALIFORNIA CREEK APPROX. 1.5 MILE WEST & 1.0 MILE NORTH OF DELAWARE. (REPLACE LOW WATER CROSSING) $1,007,340 DIV. $1,007,340 NOWATA 8 27814(05) COBRGE FY 2012 PRELIMINARY ENGINEERING CO BR OVER CURL CREEK ON NS 406 APPX 8.0 MILES WEST OF NOWATA PE FOR (04) $61,800 DIV. $61,800 NOWATA 8 27815(05) COBRGE FY 2012 PRELIMINARY ENGINEERING CO BR OVER PURGATORY CREEK ON NS 406 APPX 8.5 MILE SOUTHWEST OF NOWATA PE FOR (04) $51,500 DIV. $51,500 NOWATA 8 27815(06) COBRGE FY 2012 RIGHT OF WAY CO BR OVER PURGATORY CREEK ON NS 406 APPX 8.5 MILE SOUTHWEST OF NOWATA RW FOR (04) $10,300 DIV. $10,300 NOWATA 8 27815(07) COBRGE FY 2012 UTILITIES CO BR OVER PURGATORY CREEK ON NS 406 APPX 8.5 MILE SOUTHWEST OF NOWATA UTILITY FOR (04) $31,930 DIV. $31,930 NOWATA 8 27816(04) COBRGE FY 2012 BRIDGE & APPROACHES CO BR OVER UNNAMED CREEK (LWX) ON NS 406 $1,030,000 DIV. $1,030,000 NOWATA 8 27816(06) COBRGE FY 2012 RIGHT OF WAY CO BR OVER UNNAMED CREEK (LWX) ON NS 406 RW FOR (04) $5,150 DIV. $5,150 NOWATA 8 27816(07) COBRGE FY 2012 UTILITIES CO BR OVER UNNAMED CREEK (LWX) ON NS 406 RW FOR (04) $15,450 DIV. $15,450 NOWATA 8 27817(05) COBRGE FY 2012 PRELIMINARY ENGINEERING CO BR OVER OPOSSUM CREEK ON NS 410 APPX 9.0 MILE NORTHWEST OF NOWATA PE FOR (04) $51,500 DIV. $51,500 NOWATA 8 27818(05) COBRGE FY 2012 PRELIMINARY ENGINEERING CO BR OVER OPOSSUM CREEK ON NS 413 (OLD HWY 169) APPX 7.5 MILE NORTH OF SH- 10. PE FOR (04) $123,600 DIV. $123,600 NOWATA 8 27818(06) COBRGE FY 2012 RIGHT OF WAY CO BR OVER OPOSSUM CREEK ON NS 413 (OLD HWY 169) APPX 7.5 MILE NORTH OF SH- 10. RW FOR (04) $30,900 DIV. $30,900 NOWATA 8 27818(07) COBRGE FY 2012 UTILITIES CO BR OVER OPOSSUM CREEK ON NS 413 (OLD HWY 169) APPX 7.5 MILE NORTH OF SH- 10. UTILITY FOR (04) $56,650 DIV. $56,650 NOWATA 8 27819(04) COBRGE FY 2012 BRIDGE & APPROACHES CO BR OVER OPOSSUM CREEK ON NS 408 APPX 6.0 MILE WEST OF US-169 $566,500 DIV. $777,393 NOWATA 8 27819(06) COBRGE FY 2012 RIGHT OF WAY CO BR OVER OPOSSUM CREEK ON NS 408 APPX 6.0 MILE WEST OF US-169 RW FOR (04) $10,300 DIV. $10,300 NOWATA 8 27819(07) COBRGE FY 2012 UTILITIES CO BR OVER OPOSSUM CREEK ON NS 408 APPX 6.0 MILE WEST OF US-169 UTILITY FOR (04) $10,300 DIV. $10,300 OKFUSKEE 3 23958(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER HILLIBY TRIBUTARY, 2.1 MI. N. AND 2.6 MI. E. OF PADEN $76,220 DIV. $381,100 OKFUSKEE 3 25425(04) CO RD 5.00 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD(EW-96), APPROX. 8.0 MILE NORTH OF PADEN, BEG @ CO RD(NS-362) & EXT EAST TO CO RD(NS-366) (5404C) (WELTY RD.) $3,347,500 DIV. $3,347,500 OKLAHOMA 4 25011(04) COBRGE 0.12 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER CHISHOM CR. ON CO. RD. EW-90 AND 0.2 MI. E. OF NS-307 $164,800 DIV. $622,779 Friday, July 8, 2011 Page 19 of 63 5 YEAR CIRB WORK PLAN OKLAHOMA 4 25442(06) CO RD 0.00 MI. FY 2012 RIGHT OF WAY HARRAH RD(NS-328) BEG @ JCT SE 29TH ST/SH-270 & EXT SOUTH APPROX 1.5 MILE (RW FOR 25442(04)) $206,000 DIV. $206,000 OKLAHOMA 4 25442(07) CO RD 0.00 MI. FY 2012 UTILITIES HARRAH RD(NS-328) BEG @ JCT SE 29TH ST/SH-270 & EXT SOUTH APPROX 1.5 MILE (UT FOR 25442(04)) $241,000 DIV. $241,000 OKLAHOMA 4 28576(04) CO RD 2.00 MI. FY 2012 PRELIMINARY ENGINEERING PRELIMINARY ENGINEERING CHARTER OAK RD. $51,500 DIV. $51,500 OKLAHOMA 4 28581(04) CO RD 1.00 MI. FY 2012 PRELIMINARY ENGINEERING PE & GEO TECH ON NW 150TH.8 MI E OF TRIPLE X $51,500 DIV. $51,500 OKMULGEE 1 15205(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES CO BR @ A TRIB OF MONTEZUMA CR, 1.2 MI NORTH & 2.5 MI WEST OF HENRYETTA $772,500 DIV. $978,500 OKMULGEE 1 15205(07) COBRGE 0.25 MI. FY 2012 UTILITIES CO BR @ A TRIB OF MONTEZUMA CR, 1.2 MI NORTH & 2.5 MI WEST OF HENRYETTA (UT FOR 15205(04)) $41,200 DIV. $41,200 OKMULGEE 1 22181(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR.: AND APPR. OVER NEGRO CR., 3.2 MI. N. & 1.1 MI. W. OF US-75/SH-56 JCT., IN OKMULGEE $515,000 DIV. $515,000 OKMULGEE 1 22182(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES CO. BR.: AND APPR. OVER UNNAMED CR., 3.1 MI. N. & 1.2 MI. W. OF US-75/SH-56 JCT. IN OKMULGEE $463,500 DIV. $463,500 OKMULGEE 1 23055(04) COBRGE 0.21 MI. FY 2012 BRIDGE & APPROACHES CO. BR.: AND APPR. OVER UNNAMED CR., 2.0 MI. N. AND 3.6 MI. W. OF I-40/SH-75 JCT., IN HENRYETTA $257,500 DIV. $580,920 OKMULGEE 1 25642(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER SNAKE CR., 4.0 MI. W. & 0.5 MI. N. OF SH-16/SH-52 JCT. $154,500 DIV. $515,000 OKMULGEE 1 27879(06) COBRGE 0.50 MI. FY 2012 RIGHT OF WAY CO. BR. AND APPR. OVER SALT CREEK, 1.0 MILE SOUTH AND 3.2 MILES WEST OF BEGGS. (R/W FOR 27879(04)) $51,500 DIV. $51,500 OKMULGEE 1 27879(07) COBRGE 0.50 MI. FY 2012 UTILITIES CO. BR. AND APPR. OVER SALT CREEK, 1.0 MILE SOUTH AND 3.2 MILES WEST OF BEGGS. (UTL FOR 27879(04)) $51,500 DIV. $51,500 OSAGE 8 23929(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER QUAPAW CR. ON OAK ST. APPROX. 0.5 MI. S. OF SH-20 AND 3 MI. W. OF SKIATOOK $1,358,570 DIV. $1,358,570 OTTAWA 8 25092(04) COBRGE 0.76 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER NEOSHO RIVER APPROX. 2.3 MI. E. OF CRAIG C/L (STEPPS FORD BR.) $5,253,000 DIV. $5,253,000 OTTAWA 8 25092(06) COBRGE 0.76 MI. FY 2012 RIGHT OF WAY CO. BR. OVER NEOSHO RIVER APPROX. 2.3 MI. E. OF CRAIG C/L (STEPPS FORD BR.) (RW FOR 25092(04)) $25,750 DIV. $25,750 OTTAWA 8 25092(07) COBRGE 0.76 MI. FY 2012 UTILITIES CO. BR. OVER NEOSHO RIVER APPROX. 2.3 MI. E. OF CRAIG C/L (STEPPS FORD BR.) (UT FOR 25092(04)) $15,450 DIV. $15,450 OTTAWA 8 28682(04) COBRGE FY 2012 BRIDGE & APPROACHES CO BR OVER ON NS 450 UNNAMED TRIB TO HORSE CREEK APPX 0.3 MI NORTH OF AFTON $501,610 DIV. $501,610 OTTAWA 8 28682(05) COBRGE FY 2012 PRELIMINARY ENGINEERING CO BR OVER ON NS 450 UNNAMED TRIB TO HORSE CREEK APPX 0.3 MI NORTH OF AFTON (PE FOR 28682(04) $51,500 DIV. $51,500 OTTAWA 8 28682(06) COBRGE FY 2012 RIGHT OF WAY CO BR OVER ON NS 450 UNNAMED TRIB TO HORSE CREEK APPX 0.3 MI NORTH OF AFTON (RW FOR 28682(04)) $10,300 DIV. $10,300 Friday, July 8, 2011 Page 20 of 63 5 YEAR CIRB WORK PLAN OTTAWA 8 28682(07) COBRGE FY 2012 UTILITIES CO BR OVER ON NS 450 UNNAMED TRIB TO HORSE CREEK APPX 0.3 MI NORTH OF AFTON (UTILS FOR 28682(04)) $40,000 DIV. $40,000 PAWNEE 8 25444(06) COBRGE 0.00 MI. FY 2012 RIGHT OF WAY BELFORD BRIDGE(EW-35) OVER ARKANSAS RIVER APPROX. 6.5 MILE WEST OF RALSTON (5902C) (RW FOR 25444(04)) $85,347 DIV. $85,347 PAWNEE 8 25444(07) COBRGE 0.00 MI. FY 2012 UTILITIES BELFORD BRIDGE(EW-35) OVER ARKANSAS RIVER APPROX. 6.5 MILE WEST OF RALSTON (5902C) (UT FOR 25444(04)) $19,570 DIV. $19,570 PAYNE 4 22169(04) COBRGE 0.50 MI. FY 2012 BRIDGE & APPROACHES COUNTRY CLUB LN.(NS-330) OVER STILLWATER CREEK APPROX 4.0 MILE WEST & 0.5 MILE NORTH OF JCT SH-51/US-177. PHASE 1 $1,751,000 DIV. $1,751,000 PAYNE 4 22169(09) CO RD 1.50 MI. FY 2012 GRADE, DRAIN & SURFACE COUNTRY CLUB LN.(NS-330) BEG @ NORTH END OF BRIDGE & EXT NORTH APPROX 1.5 MILE. PHASE 2 $3,090,000 DIV. $3,090,000 PAYNE 4 23656(04) COBRGE 0.10 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO. BR. OVER COUNCIL CR., 3.0 MI. W. AND 1.8 MI. S. OF SH-18/SH-51 JCT. $164,800 DIV. $395,924 PAYNE 4 25445(05) CO RD 0.00 MI. FY 2012 PRELIMINARY ENGINEERING NORFOLK RD(NS-353) BEG @ SH-33 & EXT NORTH 3.0 MILE TO FAIRLAWN RD(EW-68) (6046C) (PE FOR 25445(04)) $123,600 DIV. $123,600 PAYNE 4 27804(06) COBRGE 0.20 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE & APPROACHES ON EW-67 OVER STILLWATER CREEK 0.3 MI WEST OF MEHAN PE FOR 27804(04) $51,500 DIV. $51,500 PAYNE 4 28577(04) CO RD 2.00 MI. FY 2012 PRELIMINARY ENGINEERING PRELIMINARY ENGINEERING LAKEVIEW & MAJOR $51,500 DIV. $51,500 PAYNE 4 28582(05) CO RD 1.00 MI. FY 2012 PRELIMINARY ENGINEERING 19TH & NORFOLK PRELIMINARY ENGINEERING $51,500 DIV. $51,500 PAYNE 4 28711(05) COBRGE 0.50 MI. FY 2012 PRELIMINARY ENGINEERING 3.4 MILES SOUTH OF RIPLEY PE FOR 28711(04) $50,000 DIV. $50,000 PITTSBURG 2 22949(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR.: AND APPR. OVER UNNAMED CR. APPROX 1.0 MI. S. AND 3.0 E.OF SCIPIO $226,600 DIV. $535,600 PITTSBURG 2 22949(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO. BR.: AND APPR. OVER UNNAMED CR. APPROX 1.0 MI. S. AND 3.0 E.OF SCIPIO R/W FOR 2294904 $5,150 DIV. $5,150 PITTSBURG 2 22949(07) COBRGE 0.20 MI. FY 2012 UTILITIES CO. BR.: AND APPR. OVER UNNAMED CR. APPROX 1.0 MI. S. AND 3.0 E.OF SCIPIO UT FOR 2294904 $5,150 DIV. $5,150 PITTSBURG 2 23479(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER UNNNAMED CREEK APPROX. 0.8 MILE SOUTH OF KREBS $226,600 DIV. $535,600 PITTSBURG 2 23479(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO. BR. OVER UNNNAMED CREEK APPROX. 0.8 MILE SOUTH OF KREBS R/W FOR 2347904 $5,150 DIV. $5,150 PITTSBURG 2 23479(07) COBRGE 0.20 MI. FY 2012 UTILITIES CO. BR. OVER UNNNAMED CREEK APPROX. 0.8 MILE SOUTH OF KREBS UT FOR 2347904 $5,150 DIV. $5,150 PITTSBURG 2 23482(05) COBRGE 0.10 MI. FY 2012 GRADE, DRAIN & SURFACE CAUSEWAY OVER LAKE EUFAULA APPROX. 2 MI EAST OF CROWDER, EAST 0.75 MI (PHASE I) (ROADWAY) (6110C); WITHDRAWN 9-1-10 $1,030,000 DIV. $1,030,000 PITTSBURG 2 23491(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO BR OVER BRUSHY CREEK APPROX 1.0 MILE SOUTH & 1.0 MILE EAST OF BLANCO (6144C) (RW FOR 23491(04)) $15,836 DIV. $15,836 Friday, July 8, 2011 Page 21 of 63 5 YEAR CIRB WORK PLAN PITTSBURG 2 23491(07) COBRGE 0.20 MI. FY 2012 UTILITIES CO BR OVER BRUSHY CREEK APPROX 1.0 MILE SOUTH & 1.0 MILE EAST OF BLANCO (6144C) (UT FOR 23491(04)) $13,725 DIV. $13,725 PONTOTOC 3 25473(04) CO RD 0.50 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO RD(NS-345) OVER 3 BRIDGES BEG @ CO RD(EW-149.5) & EXT NORTH TO SH-3W (6246C) GARR CUT OFF $824,000 DIV. $2,060,000 PONTOTOC 3 27266(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER COTTON CREEK APPROX 0.5 MILE SOUTH & 2.3 MILE EAST OF FRANCIS LOCAL # 182 $334,750 DIV. $833,270 PUSHMATAHA 2 17045(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR: @ TENMILE CREEK, 1.8 MILES NORTH OF JUMBO $206,000 DIV. $721,000 PUSHMATAHA 2 17045(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO BR: @ TENMILE CREEK, 1.8 MILES NORTH OF JUMBO R/W FOR 1704504 $5,150 DIV. $5,150 PUSHMATAHA 2 17045(07) COBRGE 0.20 MI. FY 2012 UTILITIES CO BR: @ TENMILE CREEK, 1.8 MILES NORTH OF JUMBO UT FOR 1704504 $5,150 DIV. $5,150 PUSHMATAHA 2 20395(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES COUNTY BRIDGE OVER CLOUDY CREEK, APPROX. 0.7 MILE NORTH & 0.4 MILE EAST OF CLOUDY $1,030,000 DIV. $1,030,000 PUSHMATAHA 2 25476(05) COBRGE 0.57 MI. FY 2012 PRELIMINARY ENGINEERING CO BR OVER AN UNNAMED CR, 3.1 MI EAST & 1.0 MI SOUTH OF RATTAN PE FOR 25476(04) $43,775 DIV. $43,775 PUSHMATAHA 2 28631(05) CO RD 3.50 MI. FY 2012 PRELIMINARY ENGINEERING RECONSTRUCT NOLLA LOOP ROAD (ROUTE 6481C) FROM SH 144 1.0 MILE EAST OF NASHOBA, SOUTH AND EAST 3.5 MILES PE FOR 2863104 $154,500 DIV. $154,500 PUSHMATAHA 2 28634(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER FRAZIER CREEK ON NS-432, LOCATED 1.0 MILE NORTH OF OLETA PE FOR 2863404 $52,015 DIV. $52,015 PUSHMATAHA 2 28636(05) CO RD 3.00 MI. FY 2012 PRELIMINARY ENGINEERING RECONSTRUCT MILLER ROAD (ROUTE 6438C) BEGINNING 1.0 MILE SOUTH OF MILLER EXTENDING NORTH 3.0 MILES PE FOR 2863604 $103,000 DIV. $103,000 PUSHMATAHA 2 28655(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER UNAMMED CREEK ON CO ROAD 1848D, 4.5 MILES EAST AND 3.0 MILES NORTH OF FINLEY PE FOR 2865504 $45,835 DIV. $45,835 ROGER MILLS 5 25477(04) CO RD 8.00 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO RD FR THE SOUTHWEST CORNER OF HAMMON SOUTHWEST 7.5 MI (4 BRIDGES) $3,836,750 DIV. $3,836,750 ROGER MILLS 5 25477(06) CO RD 8.00 MI. FY 2012 RIGHT OF WAY CO RD FR THE SOUTHWEST CORNER OF HAMMON SOUTHWEST 7.5 MI (4 BRIDGES) ROW FOR 25477(04) $25,750 DIV. $25,750 ROGER MILLS 5 25477(07) CO RD 8.00 MI. FY 2012 UTILITIES CO RD FR THE SOUTHWEST CORNER OF HAMMON SOUTHWEST 7.5 MI (4 BRIDGES) UT FOR 25477(04) $25,750 DIV. $25,750 ROGER MILLS 5 25478(05) CO RD 7.00 MI. FY 2012 PRELIMINARY ENGINEERING CO RD (6514C) FR 2.0 MI EAST OF CHEYENNE EAST 7.0 MI TO 6544C PE FOR 25478(05) $139,050 DIV. $139,050 ROGER MILLS 5 28023(04) COBRGE 0.00 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER CAMP HOLLOW CR. APPROX 3.0 MILE EAST & 2.3 MILE NORTH OF REYDON $72,100 DIV. $360,500 ROGER MILLS 5 28687(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES REPLACE PIPE WITH BRIDGE OVER CAMP HOLLOW CREEK, EW93/N176.5 $108,150 DIV. $396,550 ROGER MILLS 5 28687(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING CO BR OVER CAMP HOLLOW CREEK, EW93/N176.5 PE FOR 28687(04) $36,050 DIV. $36,050 Friday, July 8, 2011 Page 22 of 63 5 YEAR CIRB WORK PLAN ROGERS 8 20642(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES COUNTY BRIDGE OVER SPUNKY CREEK, 1.8 MILES NORTH AND 0.7 MILES EAST OF JCT SH-66/I-44 $232,780 DIV. $591,220 ROGERS 8 25479(06) CO RD 1.42 MI. FY 2012 RIGHT OF WAY CO RD: OVER TWO UNNAMED CREEKS AND ROADWAY 2.5 MI SOUTHWEST OF KEETONVILLE ROAD (ROW FOR 25479(04) $107,256 DIV. $107,256 ROGERS 8 25479(07) CO RD 1.42 MI. FY 2012 UTILITIES CO RD: OVER TWO UNNAMED CREEKS AND ROADWAY 2.5 MI SOUTHWEST OF KEETONVILLE ROAD (UT FOR 25479(04) $16,995 DIV. $16,995 ROGERS 8 25480(05) CO RD 1.59 MI. FY 2012 PRELIMINARY ENGINEERING CO RD: 2 BRIDGES & ROADWAY, (BR# 107 & 108) PE FOR 25480(04) $118,450 DIV. $118,450 ROGERS 8 25480(06) COBRGE 1.59 MI. FY 2012 RIGHT OF WAY CO RD: 2 BRIDGES & ROADWAY, (BR# 107 & 108) ROW FOR 25480(04) $83,214 DIV. $83,214 ROGERS 8 25480(07) COBRGE 1.59 MI. FY 2012 UTILITIES CO RD: 2 BRIDGES & ROADWAY, (BR# 107 & 108) UT FOR 25480(04) $14,420 DIV. $14,420 ROGERS 8 27811(05) COBRGE FY 2012 PRELIMINARY ENGINEERING CO BR OVER DOG CREEK ON EW 410 APPX 1.2 MI EAST OF SH 66 $72,100 DIV. $72,100 SEQUOYAH 1 20738(04) COBRGE 0.13 MI. FY 2012 BRIDGE & APPROACHES COUNTY BRIDGE OVER BIG SKIN BAYOU, 4.2 MILES WEST & 1.2 MILES NORTH OF MULDROW $257,500 DIV. $607,700 SEQUOYAH 1 25434(06) CO RD 8.40 MI. FY 2012 RIGHT OF WAY CO RD. NS4620 (OLD HWY 17) BEG. 1.0 MI. N OF SH-64 EXTEND N 8.4 MI. TO MARBLE CITY (INCLUDES 2 BRIDGES) OVER BRUSHY CREEK ( ROW FOR 2543404) $103,000 DIV. $103,000 SEQUOYAH 1 25434(07) CO RD 8.40 MI. FY 2012 UTILITIES CO RD. NS4620 (OLD HWY 17) BEG. 1.0 MI. N OF SH-64 EXTEND N 8.4 MI. TO MARBLE CITY (INCLUDES 2 BRIDGES) OVER BRUSHY CREEK (UT FOR 2543404) $103,000 DIV. $103,000 STEPHENS 7 26846(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES CO BR ON NS-275: OVER STAGE STAND CR, 7.0 MI WEST & 6.3 MI SOUTH OF THE US-81/SH-7 JCT IN NORTH DUNCAN $127,720 DIV. $638,600 STEPHENS 7 26846(06) COBRGE 0.25 MI. FY 2012 RIGHT OF WAY CO BR ON NS-275: OVER STAGE STAND CR, 7.0 MI WEST & 6.3 MI SOUTH OF THE US-81/SH-7 JCT IN NORTH DUNCAN ROW FOR 26846(04) $5,150 DIV. $5,150 STEPHENS 7 26846(07) COBRGE 0.25 MI. FY 2012 UTILITIES CO BR ON NS-275: OVER STAGE STAND CR, 7.0 MI WEST & 6.3 MI SOUTH OF THE US-81/SH-7 JCT IN NORTH DUNCAN UT FOR 26846(04) $10,300 DIV. $10,300 STEPHENS 7 26847(04) COBRGE 0.30 MI. FY 2012 BRIDGE & APPROACHES CO BR ON NS-277 OVER A TRIBUTARY OF LITTLE BEAVER CR, 1.0 MI NORTH & 6.0 MI WEST OF MARLOW $115,487 DIV. $577,434 STEPHENS 7 27847(05) CO RD 5.00 MI. FY 2012 PRELIMINARY ENGINEERING GRADE, DRAIN, BRIDGE & SURFACE ON EW-187, BEGIN AT NS-277 AND EXTEND EAST 5.0 MILES TO US-81 PE FOR 27847(04) $283,250 DIV. $283,250 TEXAS 6 25483(04) CO RD 5.50 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD: (NS-077) FROM 5.0 MI NORTH OF US-64 NORTH 5.5 MI PHASE I $2,266,000 DIV. $2,266,000 TEXAS 6 25483(06) CO RD 10.50 MI. FY 2012 RIGHT OF WAY CO RD: (7064C) FROM US-64 NORTH 10.5 MI ROW FOR 25483(04) & (08) $20,600 DIV. $20,600 TEXAS 6 25483(07) CO RD 10.50 MI. FY 2012 UTILITIES CO RD: (7064C) FROM US-64 NORTH 10.5 MI UT FOR 25483(04) & (08) $20,600 DIV. $20,600 TEXAS 6 25483(08) CO RD 5.00 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO RD: (7064C) FROM US-64 NORTH 5.0 MI PHASE II $2,575,000 DIV. $2,575,000 Friday, July 8, 2011 Page 23 of 63 5 YEAR CIRB WORK PLAN TEXAS 6 25484(06) COBRGE 0.38 MI. FY 2012 RIGHT OF WAY CO BR OVER HACKBERRY CR, 5.2 MI EAST OF HARDESTY ROW FOR 25484(04) $5,150 DIV. $5,150 TEXAS 6 25484(07) COBRGE 0.38 MI. FY 2012 UTILITIES CO BR OVER HACKBERRY CR, 5.2 MI EAST OF HARDESTY UT FOR 25484(04) $5,150 DIV. $5,150 TEXAS 6 28640(05) CO RD 3.50 MI. FY 2012 PRELIMINARY ENGINEERING RESURFACE ON NS-76. BEGIN AT EW-28.5 AND EXTEND 3.5 MILES NORTH PE FOR 28640(04) $30,900 DIV. $30,900 TILLMAN 5 23236(04) COBRGE 0.02 MI. FY 2012 BRIDGE & APPROACHES CO. BR.: OVER BLUE CR., 3.1 MI SOUTH & 2.3 MI EAST OF GRANDFIELD ON NS-243 $108,150 DIV. $396,550 TILLMAN 5 25485(04) CO RD 5.50 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD 7112C FROM 7120C 5.5 MI TO US-183 $3,746,934 DIV. $3,746,934 TILLMAN 5 25486(04) COBRGE 0.76 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER HORSE & JACK CREEKS, 7 & 8 MI WEST OF THE COTTON C/L ON 7108C $1,256,600 DIV. $1,256,600 TILLMAN 5 25486(07) COBRGE 0.76 MI. FY 2012 UTILITIES CO BR OVER HORSE & JACK CREEKS, 7 & 8 MI WEST OF THE COTTON C/L ON 7108C UT FOR 25486(04) $10,300 DIV. $10,300 TILLMAN 5 26558(04) CO RD 0.00 MI. FY 2012 GRADE, DRAIN & SURFACE CORD(EW-180) BEG @ US-183 & EXT EAST APPROX 1.25 MILE TO CORD(NS-223); CORD(NS-223) BEG @ CORD(EW-180) & EXT SOUTH APPROX 3.0 MILE TO EW-183. $340,430 DIV. $1,702,151 TILLMAN 5 28689(05) CO RD 10.00 MI. FY 2012 PRELIMINARY ENGINEERING CO RD 71-08C, BEGIN 5.4 MI E. OF MANITOU EXTEND EAST 10.0 MI. PE FOR 28689(04) $77,250 DIV. $77,250 TULSA 8 25487(04) CO RD 1.20 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO RD: DIP CREEK ROAD, BETWEEN 61ST SOUTH & COYOTE TRAIL (INCLUDES BRIDGE) $2,030,130 DIV. $2,030,130 TULSA 8 25487(06) CO RD 1.20 MI. FY 2012 RIGHT OF WAY CO RD: DIP CREEK ROAD, BETWEEN 61ST SOUTH & COYOTE TRAIL (INCLUDES BRIDGE) ROW FOR 25487(04) $25,750 DIV. $25,750 TULSA 8 25487(07) CO RD 1.20 MI. FY 2012 UTILITIES CO RD: DIP CREEK ROAD, BETWEEN 61ST SOUTH & COYOTE TRAIL (INCLUDES BRIDGE) UT FOR 25487(04) $115,360 DIV. $115,360 WAGONER 1 22156(04) COBRGE 0.50 MI. FY 2012 BRIDGE & APPROACHES CO BR: OVER SPUNKY CR, 0.1 MI SOUTH & 3.0 MI WEST OF FAIR OAKS (S. OF US-412 NEAR ROGER C/L) $1,030,000 DIV. $1,030,000 WAGONER 1 25488(06) CO RD 8.00 MI. FY 2012 RIGHT OF WAY CO RD 7342C FR 5.75 MI WEST OF US-69, EXT 8.0 MI NORTH FROM SH-51 (ELEVATOR ROAD) ROW FOR 25488(04) $309,000 DIV. $309,000 WAGONER 1 25489(05) CO RD 2.00 MI. FY 2012 PRELIMINARY ENGINEERING CO RD 7308C: E 161ST, BEGIN AT S 257TH EAST( NS 411) EXTEND TO SH-72 (INCLUDES CEDAR CR BR) PE FOR 25489(04) $309,000 DIV. $309,000 WASHINGTON 8 25490(06) CO RD 3.00 MI. FY 2012 RIGHT OF WAY CO RD FROM US-75 @ THE NORTH EDGE OF DEWEY, EXT 1.0 MI EAST & 2.0 MI SOUTH ROW FOR 25490(04) $300,204 DIV. $300,204 WASHINGTON 8 25490(07) CO RD 3.00 MI. FY 2012 UTILITIES CO RD FROM US-75 @ THE NORTH EDGE OF DEWEY, EXT 1.0 MI EAST & 2.0 MI SOUTH ROW FOR 25490(04) $32,960 DIV. $32,960 WASHITA 5 25491(04) CO RD 0.00 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD FROM SH-152 NORTH 2.0 MI TO US-183 & 0.7 MI ALONG 14TH ST. TO US-183: ALL IN CORDELL $2,455,327 DIV. $2,455,327 WASHITA 5 25492(04) COBRGE 1.52 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER 4 CREEKS ON 7506C, WEST OF BESSIE PHASE I $4,018,030 DIV. $4,018,030 Friday, July 8, 2011 Page 24 of 63 5 YEAR CIRB WORK PLAN WASHITA 5 26626(06) CO RD 5.00 MI. FY 2012 PRELIMINARY ENGINEERING CO RD: FROM SH-54 IN COLONY, ON NS-242, NORTH TO EW-110 (PE FOR 26626(04) $25,750 DIV. $25,750 WASHITA 5 28040(04) COBRGE 0.00 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER UNNAMED CREEK APPROX 4.7 MILE SOUTH & 12 MILE WEST OF DILL CITY $144,200 DIV. $576,800 WASHITA 5 28688(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING CO BR OVER BOGGY CREEK EW-118N230.5 PE FOR 28688(04) $30,900 DIV. $30,900 WASHITA 5 28690(05) CO RD 11.00 MI. FY 2012 PRELIMINARY ENGINEERING CO.RD. GRADE,DRAIN,SURFACE MC.75-06C BEGIN SH-44 EXT.E.11MI.TO US-183 PE FOR 28690(04) $133,900 DIV. $133,900 WOODS 6 23046(04) COBRGE 0.02 MI. FY 2012 BRIDGE & APPROACHES CO. BR.: OVER LITTLE EAGLE CHIEF CR., 1.6 MI. N. AND .8 MI. E. OF HOPETON, ON EW-21 $248,230 DIV. $454,230 WOODS 6 24196(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER UNNAMED CR., 7.0 MI. W. AND 6.5 MI. S. OF US-64/US-281S JCT. ON NS-237 $103,000 DIV. $515,000 WOODS 6 25475(04) CO RD 6.00 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO RD: EW 025 FROM US-281 EAST 6.0 MI TO DACOMA $3,090,000 DIV. $3,090,000 WOODS 6 25475(06) CO RD 6.00 MI. FY 2012 RIGHT OF WAY CO RD: EW 025 FROM US-281 EAST 6.0 MI & WEST 5.0 MI ROW FOR 25475(04) $10,300 DIV. $10,300 WOODS 6 25475(07) CO RD 6.00 MI. FY 2012 UTILITIES CO RD: EW 025 FROM US-281 EAST 6.0 MI & WEST 5.0 MI UT FOR 25475(04) $10,300 DIV. $10,300 WOODS 6 25493(05) COBRGE 0.38 MI. FY 2012 PRELIMINARY ENGINEERING CO BR OVER SALT FORK RV, 5.0 MI NORTH, 7.0 MI WEST & 0.8 MI SOUTH OF THE US-281/SH-11 JCT PE FOR 25493(04) $92,700 DIV. $92,700 WOODS 6 28347(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES ON NS-241 OVER LITTLE EAGLE CHIEF CREEK, 3.0 MILES WEST AND 2.1 MILES SOUTH OF JCT US-64/US-281S PE FOR 28347(04) CIRB FUND $48,410 DIV. $48,410 WOODS 6 28458(05) COBRGE 1.00 MI. FY 2012 PRELIMINARY ENGINEERING CO RD AND 2 BRIDGES ON NS-230 BETWEEN EW-12 AND EW-13 PE FOR 28458(04) $136,990 DIV. $136,990 WOODWARD 6 25700(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER DEEP DR., 4.0 MI. S. & 10.5 MI. E. OF MUTUAL OKLAHOMA ON EW-58 $245,257 DIV. $515,000 WOODWARD 6 26802(06) CO RD 4.00 MI. FY 2012 RESURFACE CO RD: NS-203 FROM 2.8 MI WEST & 3.0 MI NORTH OF SHARON EXTEND NORTH 5.0 MI $515,000 DIV. $1,545,000 WOODWARD 6 27406(06) CO RD 6.50 MI. FY 2012 RIGHT OF WAY RESURFACE & WIDEN CO RD (QUINLAN RD) & REPLACE CO BR BEGIN US-412/NS-221 NORTHEAST TO NS-223 THEN NORTH 2.5 MI TO EW-35 (PHASE 1) RW FOR 27406(04) $10,300 DIV. $10,300 WOODWARD 6 27406(07) CO RD 6.50 MI. FY 2012 UTILITIES RESURFACE & WIDEN CO RD (QUINLAN RD) & REPLACE CO BR BEGIN US-412/NS-221 NORTHEAST TO NS-223 THEN NORTH 2.5 MI TO EW-35 (PHASE 1) UT FOR 27406(04) $10,300 DIV. $10,300 Project Count: 472 $217,455,283 $264,785,835 Friday, July 8, 2011 Page 25 of 63 FFY 2013 5 YEAR CIRB WORK PLAN FISCAL YEAR 2013 CIRB$ Total$ ADAIR 1 24831(04) COBRGE 0.50 MI. FY 2013 BRIDGE REHABILITATION CO. BR. OVER ILLINOIS RIVER, 4.0 MI. S. AND 0.8 MI. E.OF NW C/L $2,120,000 DIV. $2,120,000 ADAIR 1 28652(05) COBRGE FY 2013 PRELIMINARY ENGINEERING LYONS SWITCH COMMUNITY (PE FOR 2865204) $67,000 DIV. $67,000 ALFALFA 6 24832(08) CO RD 8.00 MI. FY 2013 GRADE,DRAINING,BRIDGE & SURFACE CO. RD. ON NS-255 FROM EW-25 EXT. N. 2.0 MI. TO EW-23 THEN EXT. E. 6.0 MI. TO US-64 (PH II) $3,392,000 DIV. $3,392,000 ALFALFA 6 28343(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES IDGE AND APPROACHES ON EW-034 OVER EAGLE CHIEF CREEK, 1.0 MILES NORTH AND 0.5 MILES EAST OF ALINE $106,000 DIV. $530,000 ALFALFA 6 28441(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING COUNTY BRIDGE ON EW-09 OVER BIG SANDY CREEK, 3.9 MILES EAST AND 1.0 MILES SOUTH OF BYRON PE FOR 28441(04) CIRB FUNDS $49,820 DIV. $49,820 ATOKA 2 27370(04) COBRGE 0.20 MI. FY 2013 BRIDGE & APPROACHES CO BR OVER UNNAMED CREEK APPROX 0.2 MILE SOUTH & 1.2 MILE WEST OF TUSHKA $86,920 DIV. $434,600 ATOKA 2 27370(06) COBRGE 0.20 MI. FY 2013 RIGHT OF WAY CO BR OVER UNNAMED CREEK APPROX 0.2 MILE SOUTH & 1.2 MILE WEST OF TUSHKA RW FOR 2737004 $5,300 DIV. $5,300 ATOKA 2 27370(07) COBRGE 0.20 MI. FY 2013 UTILITIES CO BR OVER UNNAMED CREEK APPROX 0.2 MILE SOUTH & 1.2 MILE WEST OF TUSHKA UT FOR 2737004 $5,300 DIV. $5,300 BEAVER 6 24837(04) COBRGE 0.66 MI. FY 2013 BRIDGE & APPROACHES CO. BR. OVER WILLOW CR., EW-15, 4.0 MI. E. & 6.0 MI. N. & 1.6 MI. E. OF BOYD $1,166,000 DIV. $1,166,000 BEAVER 6 24838(06) COBRGE 1.89 MI. FY 2013 RIGHT OF WAY CO. BR. OVER DUGOUT CR., 0.7 MI. S. & 6.4 MI. W. OF BEAVER (RW FOR 24838(04)) $10,600 DIV. $10,600 BEAVER 6 24838(07) COBRGE 1.89 MI. FY 2013 UTILITIES CO. BR. OVER DUGOUT CR., 0.7 MI. S. & 6.4 MI. W. OF BEAVER (UT FOR 24838(04)) $10,600 DIV. $10,600 BEAVER 6 28344(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING IDGE AND APPROACHES ON EW-019 OVER CAMP CREEK, 8.0 MILES NORTH AND 7.6 MILES EAST OF ELMWOOD PE FOR 28344(04) CIRB FUNDS $68,900 DIV. $68,900 BEAVER 6 28349(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES COUNTY BRIDGE ON NS-141 OVER CLEAR CREEK, 2.0 MILES NORTH AND 2.0 MILES EAST OF ELMWOOD $106,000 DIV. $530,000 BECKHAM 5 26657(04) COBRGE 0.10 MI. FY 2013 BRIDGE & APPROACHES CO BR APPROX 6.0 MILE NORTH & 2.1 MILE EAST OF SAYRE. $80,560 DIV. $402,800 BECKHAM 5 28700(05) COBRGE 0.03 MI. FY 2013 PRELIMINARY ENGINEERING CO BR. OVER BUFFALO CREEK 12.5 MI.N.&2.7 MI.E. OF ERICK PE FOR 28700(04) $31,800 DIV. $31,800 BLAINE 5 28692(04) CO RD 4.00 MI. FY 2013 WIDEN & RESURFACE CO.RD. MC-06-40C BEGINNING AT US 270 EXTENDING SOUTH 4.0 MI. $1,812,600 DIV. $1,812,600 BLAINE 5 28692(05) CO RD 4.00 MI. FY 2013 PRELIMINARY ENGINEERING CO.RD. MC-06-40C BEGINNING AT US 270 EXTENDING SOUTH 4.0 MI. PE. FOR 28692(04) $95,400 DIV. $95,400 BLAINE 5 28694(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES COBR. REPLACE BRIDGE OVER 9 MILE CREEK,6 MI. S. AND 0.4 EAST OF CANTON. $80,560 DIV. $402,800 BLAINE 5 28703(05) CO RD 3.00 MI. FY 2013 PRELIMINARY ENGINEERING GRADE DRAIN,SURFACE MAJOR COLLECTOR 06-41C AT SH-51 EXT.S 3.0MI. TO 06-10C PE FOR 28703(04) $63,600 DIV. $63,600 Friday, July 8, 2011 Page 26 of 63 5 YEAR CIRB WORK PLAN BRYAN 2 22488(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES CO. BR.: AND APPR. OVER ISLAND BAYOU, APPROX. 3.2 MI N. OF YUBA $318,000 DIV. $689,000 BRYAN 2 22488(06) COBRGE 0.25 MI. FY 2013 RIGHT OF WAY CO. BR.: AND APPR. OVER ISLAND BAYOU, APPROX. 3.2 MI N. OF YUBA R/W FOR 2248804 $5,300 DIV. $5,300 BRYAN 2 22488(07) COBRGE 0.25 MI. FY 2013 UTILITIES CO. BR.: AND APPR. OVER ISLAND BAYOU, APPROX. 3.2 MI N. OF YUBA UT FOR 2248804 $5,300 DIV. $5,300 BRYAN 2 24800(04) COBRGE 0.95 MI. FY 2013 BRIDGE & APPROACHES CO BR OVER THE RED RIVER, S.E. OF HENDRIX (CARPENTERS BLUFF BR) $6,360,000 DIV. $6,360,000 CADDO 7 24802(04) CO RD 2.00 MI. FY 2013 GRADE, DRAIN & SURFACE CO RD (EW-131) BEG AT US-281 & EXTEND WEST APPROXIMATELY 5.8 MILES $4,814,520 DIV. $5,344,520 CADDO 7 24803(06) COBRGE 1.00 MI. FY 2013 RIGHT OF WAY CO BR OVER THE LITTLE WASHITA RIVER WEST OF CYRIL ON NS-267 BEG @ SH-19 & EXT APPROX 1.0 MILE SOUTH(TWO BRIDGES) (RW FOR 24803(04)) $31,800 DIV. $31,800 CADDO 7 24803(07) COBRGE 1.00 MI. FY 2013 UTILITIES CO BR OVER THE LITTLE WASHITA RIVER WEST OF CYRIL ON NS-267 BEG @ SH-19 & EXT APPROX 1.0 MILE SOUTH(2 BRIDGES) (UT FOR 24803(04)) $106,000 DIV. $106,000 CANADIAN 4 24804(04) CO RD 4.00 MI. FY 2013 GRADE,DRAINING,BRIDGE & SURFACE CO RD FROM US-81 IN OKARCHE WEST 4.0 MI (EW-89) $4,240,000 DIV. $4,240,000 CANADIAN 4 26646(04) CO RD 2.00 MI. FY 2013 GRADE, DRAIN & SURFACE CO RD(NS-274) BEG @ EW-91, APPROX 6.5 MILE NORTH OF CALUMET, & EXT NORTH 2.0 MILE TO EW-89(KINGFISHER C/L) $275,600 DIV. $1,378,000 CANADIAN 4 26967(06) COBRGE 0.23 MI. FY 2013 PRELIMINARY ENGINEERING CO BR ON NS-289 OVER TRIB TO PURCELL CREEK APPROX 6.0 MILE WEST & 1.8 MILE SOUTH OF YUKON PE FOR 26967(04) $45,580 DIV. $45,580 CARTER 7 27435(04) COBRGE 0.20 MI. FY 2013 BRIDGE & APPROACHES CO RD(EW-190) OVER WALNUT CREEK APPROX 0.3 MILE WEST OF SH-76 & 2.0 MILE NORTH OF HEALDTON (LOW WATER XING) $127,200 DIV. $636,000 CARTER 7 27435(06) COBRGE 0.20 MI. FY 2013 RIGHT OF WAY CO RD(EW-190) OVER WALNUT CREEK APPROX 0.3 MILE WEST OF SH-76 & 2.0 MILE NORTH OF HEALDTON (LOW WATER XING) ROW FOR 27435(04) $5,300 DIV. $5,300 CARTER 7 27435(07) COBRGE 0.20 MI. FY 2013 UTILITIES CO RD(EW-190) OVER WALNUT CREEK APPROX 0.3 MILE WEST OF SH-76 & 2.0 MILE NORTH OF HEALDTON (LOW WATER XING) UT FOR 27435(04) $10,600 DIV. $10,600 CARTER 7 28388(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-199) OVER TRIB. TO HICKORY CREEK, 1.3 MILES SOUTH AND 0.8 MILES WEST OF JCT I-35/US-70 PE FOR 28388(04) $53,000 DIV. $53,000 CHEROKEE 1 23430(06) COBRGE 0.43 MI. FY 2013 RIGHT OF WAY CO. BR. OVER BARRON FORK CREEK, 0.8 MI SOUTH OF WELLING (RW FOR 224304) $53,000 DIV. $53,000 CHEROKEE 1 23430(07) COBRGE 0.43 MI. FY 2013 UTILITIES CO. BR. OVER BARRON FORK CREEK, 0.8 MI SOUTH OF WELLING (UT FOR 224304) $53,000 DIV. $53,000 CHEROKEE 1 24824(04) CO RD 1.00 MI. FY 2013 GRADE,DRAINING,BRIDGE & SURFACE CO RD:NS4410 FROM 3.8 MI S &1.0 MI. W. OF HULBERT, EXT. NORTH APPRX. 1.0 MI OVER RATTLESNAKE CREEK TRIB. $2,000,000 DIV. $2,000,000 CHEROKEE 1 27722(04) COBRGE 0.10 MI. FY 2013 BRIDGE & APPROACHES CO BR ON NS445 OVER MAYNARD BAYOU 5 MI SOUTH & 5.5 MI WEST OF TAHLEQUAH $265,000 DIV. $530,000 CHOCTAW 2 21651(04) COBRGE 0.20 MI. FY 2013 BRIDGE & APPROACHES CO. BR.: OVER CARNEY CREEK, APPROX. 5.0 MI. EAST OF GRANT $225,780 DIV. $490,780 Friday, July 8, 2011 Page 27 of 63 5 YEAR CIRB WORK PLAN CHOCTAW 2 21651(06) COBRGE 0.20 MI. FY 2013 RIGHT OF WAY CO. BR.: OVER CARNEY CREEK, APPROX. 5.0 MI. EAST OF GRANT R/W FOR 2165104 $5,300 DIV. $5,300 CHOCTAW 2 21651(07) COBRGE 0.20 MI. FY 2013 UTILITIES CO. BR.: OVER CARNEY CREEK, APPROX. 5.0 MI. EAST OF GRANT UT FOR 2165104 $5,300 DIV. $5,300 CHOCTAW 2 21782(04) COBRGE 0.20 MI. FY 2013 BRIDGE & APPROACHES CO. BR.: OVER CROWDER CREEK, APPROX. 2.5 MI N. & 2.6 MI. E. OF SOPER $371,000 DIV. $742,000 CHOCTAW 2 21782(06) COBRGE 0.20 MI. FY 2013 RIGHT OF WAY CO. BR.: OVER CROWDER CREEK, APPROX. 2.5 MI N. & 2.6 MI. E. OF SOPER R/W FOR 2178204 $5,300 DIV. $5,300 CHOCTAW 2 21782(07) COBRGE 0.20 MI. FY 2013 UTILITIES CO. BR.: OVER CROWDER CREEK, APPROX. 2.5 MI N. & 2.6 MI. E. OF SOPER UT FOR 2178204 $5,300 DIV. $5,300 CHOCTAW 2 24820(04) COBRGE 1.04 MI. FY 2013 BRIDGE & APPROACHES CO BR OVER CLEAR BOGGY CR, 1.9 MI EAST & 4.3 MI NORTH OF BOSWELL $2,332,000 DIV. $2,332,000 CHOCTAW 2 24821(04) COBRGE 1.14 MI. FY 2013 BRIDGE & APPROACHES CO BR OVER MUDDY BOGGY CR, 5.0 MI NORTH OF US-70 $5,724,000 DIV. $5,724,000 COAL 3 24943(06) CO RD 4.75 MI. FY 2013 RIGHT OF WAY CO RD & BR: FROM SH-3, 1.0 MI WEST OF TUPELO, SOUTH 4.75 MI ROW FOR 24943(04) $53,000 DIV. $53,000 COAL 3 24943(07) CO RD 4.75 MI. FY 2013 UTILITIES CO RD & BR: FROM SH-3, 1.0 MI WEST OF TUPELO, SOUTH 4.75 MI UT FOR 24943(04) $53,000 DIV. $53,000 COMANCHE 7 28373(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES BRIDGE AND APPROACHES (EW-170) OVER BEAVER CREEK, 3.0 MILES SOUTH AND 2.7 MILES EAST OF JCT SH-7/SH-65 (LOW WATER XING) $168,752 DIV. $843,760 COMANCHE 7 28373(06) COBRGE 0.25 MI. FY 2013 RIGHT OF WAY BRIDGE AND APPROACHES (EW-170) OVER BEAVER CREEK, 3.0 MILES SOUTH AND 2.7 MILES EAST OF JCT SH-7/SH-65 (LOW WATER XING) ROW FOR 28373(04) $5,300 DIV. $5,300 COMANCHE 7 28373(07) COBRGE 0.25 MI. FY 2013 UTILITIES BRIDGE AND APPROACHES (EW-170) OVER BEAVER CREEK, 3.0 MILES SOUTH AND 2.7 MILES EAST OF JCT SH-7/SH-65 (LOW WATER XING) UT FOR 28373(04) $10,600 DIV. $10,600 COTTON 7 24859(06) COBRGE 6.00 MI. FY 2013 RIGHT OF WAY CO RD(NS-270) BEG APPROX 3.5 MILE EAST & 3.0 MILE SOUTH OF JCT SH-65/SH-5 IN TEMPLE & EXT NORTH APPROX 6.0 MILE (RW FOR 24859(04)) $106,000 DIV. $106,000 COTTON 7 24859(07) COBRGE 6.00 MI. FY 2013 UTILITIES CO RD(NS-270) BEG APPROX 3.5 MILE EAST & 3.0 MILE SOUTH OF JCT SH-65/SH-5 IN TEMPLE & EXT NORTH APPROX 6.0 MILE (UT FOR 24859(04)) $265,000 DIV. $265,000 COTTON 7 28410(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES BRIDGE AND APPROACHES (EW-185) OVER WEST CACHE CREEK TRIB., 2.0 MILES SOUTH AND 1.4 MILES WEST OF JCT SH-5/I-44 $78,440 DIV. $392,200 COTTON 7 28410(06) COBRGE 0.25 MI. FY 2013 RIGHT OF WAY BRIDGE AND APPROACHES (EW-185) OVER WEST CACHE CREEK TRIB., 2.0 MILES SOUTH AND 1.4 MILES WEST OF JCT SH-5/I-44 ROW FOR 28410(04) $5,300 DIV. $5,300 COTTON 7 28410(07) COBRGE 0.25 MI. FY 2013 UTILITIES BRIDGE AND APPROACHES (EW-185) OVER WEST CACHE CREEK TRIB., 2.0 MILES SOUTH AND 1.4 MILES WEST OF JCT SH-5/I-44 UT FOR 28410(04) $10,600 DIV. $10,600 CRAIG 8 28526(04) COBRGE FY 2013 BRIDGE & APPROACHES CO BR ON NS448 OVER COW CREEK APPX 4.0 MI EAST OF WELCH $168,258 DIV. $378,950 CRAIG 8 28530(06) COBRGE FY 2013 RIGHT OF WAY CO BR ON NS 429 OVER BIG CREEK APPX 2.5 MILE SOUTH OF KANSAS SL (RW FOR 28530(04)) $23,850 DIV. $23,850 Friday, July 8, 2011 Page 28 of 63 5 YEAR CIRB WORK PLAN CRAIG 8 28530(07) COBRGE FY 2013 UTILITIES CO BR ON NS 429 OVER BIG CREEK APPX 2.5 MILE SOUTH OF KANSAS SL UT FOR 2853(04)) $23,850 DIV. $23,850 CREEK 8 22350(08) CO RD 1.00 MI. FY 2013 GRADE, DRAIN & SURFACE CO. RD: WEST 81ST STREET SOUTH, FROM FRANKOMA ROAD WEST TO SH-97 $6,385,440 DIV. $6,385,440 DELAWARE 8 28589(04) COBRGE FY 2013 BRIDGE & APPROACHES CO. BR ON EW456 OVER BEATY CREEK 7 MI SE OF JAY $240,962 DIV. $688,812 DEWEY 5 28452(04) CO RD 0.00 MI. FY 2013 GRADE, DRAIN & SURFACE GRADE DRAIN SURFACE 2208C FROM 2238C EAST 5.5 MI TO US-183 $287,525 DIV. $1,347,525 DEWEY 5 28695(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES COBR. REPLACE CO. BRIDGE OVER LONE CREEK,1.5MI. S. AND 3.8 MI. E OF WEBB. $80,560 DIV. $402,800 DEWEY 5 28699(05) CO RD 8.00 MI. FY 2013 PRELIMINARY ENGINEERING GRADE,DRAIN,SURFACE CO-RD 22-02C MAJOR COLLECT.FROM US-60&US281 E.8MI. PE FOR 28699(04) $127,200 DIV. $127,200 ELLIS 6 28456(06) CO RD 6.50 MI. FY 2013 RIGHT OF WAY CO RD ON NS-190, BEGIN AT SH-60 AND EXTEND NORTH 6.5 MILES RW FOR 28456(04 $10,600 DIV. $10,600 ELLIS 6 28456(07) CO RD 6.50 MI. FY 2013 UTILITIES CO RD ON NS-190, BEGIN AT SH-60 AND EXTEND NORTH 6.5 MILES UT FOR 28456(04 $10,600 DIV. $10,600 ELLIS 6 28457(05) CO RD 7.50 MI. FY 2013 PRELIMINARY ENGINEERING CO RD ON EW-37, BEGINAT US-283 AND EXTEND EAST 7.5 MILES TO SH-46 D2 PE FOR 28457(04) $159,000 DIV. $159,000 GARFIELD 4 24868(06) CO RD 11.00 MI. FY 2013 RIGHT OF WAY CO. RD. EW-40 FROM NS-294 TO 305 (RW FOR 24868(04)(08)) $10,600 DIV. $10,600 GARFIELD 4 24868(07) CO RD 11.00 MI. FY 2013 UTILITIES CO. RD. EW-40 FROM NS-294 TO 305 (RW FOR 24868(04)(08)) $10,000 DIV. $10,000 GARFIELD 4 27233(04) COBRGE 0.15 MI. FY 2013 BRIDGE & APPROACHES CB ON EW-57 8 MI SOUTH & 1.2 MI EAST OF COVINGTON $106,000 DIV. $530,000 GARFIELD 4 28374(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES ON EW 34 OVER RED ROCK CREEK, 5.0 MILES SOUTH AND 3.3 MILES EAST OF HUNTER PE FOR 28374(04) CIRB FUNDS $49,820 DIV. $49,820 GARFIELD 4 28423(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING BRIDGE ON EW-54 OVER TURKEY CREEK, 2.6 MILES NORTH AND 5.6 MILES WEST OF BISON PE FOR 28423(04) CIRB FUNDS $49,820 DIV. $49,820 GRADY 7 24945(04) CO RD 4.00 MI. FY 2013 GRADE, DRAIN & SURFACE CO RD FROM 0.5 MI NORTH OF I-44 NORTH TO SH-37 (MC-2686C) (SARA ROAD) $5,883,000 DIV. $5,883,000 GRADY 7 27856(05) CO RD FY 2013 PRELIMINARY ENGINEERING GRADE, DRAIN, BRIDGE & SURFACE ON EW-142, BEGIN AT US-81 EXT EAST 1.0 MILE, NS-284 AT EW-141 EXT S 1.5 MI, THEN E 1.0 MI ON EW-142.5 PE FOR 27856(04) $291,500 DIV. $291,500 GRADY 7 28442(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-137) OVER TRIB. TO WEST BITTER CREEK, 0.4 MILES WEST AND 1.0 MILE SOUTH OF JCT US-62/SH-39 PE FOR 28442(04) $53,000 DIV. $53,000 GRANT 4 27281(04) COBRGE 0.17 MI. FY 2013 BRIDGE & APPROACHES CO RD(EW-12) OVER AN UNNAMED CREEK APPROX 0.5 MI WEST OF SAND CREEK $106,000 DIV. $530,000 GRANT 4 28413(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING COUNTY BRIDGE ON NS-296 OVER UNNAMED CREEK, 2.0 MILES EAST AND 7.0 MILES NOTH OF MEDFORD PE FOR 28413(04) CIRB FUNDS $49,820 DIV. $49,820 Friday, July 8, 2011 Page 29 of 63 5 YEAR CIRB WORK PLAN GRANT 4 28418(06) COBRGE 0.25 MI. FY 2013 RIGHT OF WAY COUNTY BRIDGE ON EW-09 OVER SAND CREEK, 5.0 MILES NORTH AND 0.4 MILES EAST OF JCT SH-11/SH-132 RW FOR 28418(04) $5,300 DIV. $5,300 GRANT 4 28418(07) COBRGE 0.25 MI. FY 2013 UTILITIES COUNTY BRIDGE ON EW-09 OVER SAND CREEK, 5.0 MILES NORTH AND 0.4 MILES EAST OF JCT SH-11/SH-132 UT FOR 28418(04) $5,300 DIV. $5,300 GRANT 4 28419(06) CO RD 4.00 MI. FY 2013 PRELIMINARY ENGINEERING COUNTY ROAD EW-09 BEG AT SH-132 AND EXT E 6.0 MILES TO WAKITA, EW-08 BEG 4.0 MILES E OF SH-132 AND EXT E 4.0 MILES PE FOR 28419(04)(05) $148,400 DIV. $148,400 GREER 5 28697(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES CO BR. REPLACE BRIDGE OVER UNNAMED CREEK 2MI.WEST AND 0.9MI N.OF ALTUS LAKE DAM. $80,560 DIV. $402,800 HARMON 5 28701(05) COBRGE 0.03 MI. FY 2013 PRELIMINARY ENGINEERING CO BR OVER UNNAMED CREEK 1.1 MI S. AND 1.3 MI E. OF VINSON PE FOR 28701(04) $31,800 DIV. $31,800 HASKELL 1 21381(04) COBRGE 0.20 MI. FY 2013 BRIDGE & APPROACHES CO BR: OVER TALOKA CREEK, NORTH OF STIGLER ON NS444 AT EW 120.2 $265,000 DIV. $574,520 HASKELL 1 24967(06) CO RD 4.00 MI. FY 2013 RIGHT OF WAY CO RD NS 447 ,BEGINNING APPROX. 3.5 MI EAST OF STIGLER AT SH. 9 AND EXTEND 4.0 MI NORTH TO GARLAND (TAMAHA RD PHASE 1) ROW FOR 24967(04) $31,800 DIV. $31,800 HASKELL 1 24967(07) CO RD 4.00 MI. FY 2013 UTILITIES CO RD NS 447 ,BEGINNING APPROX. 3.5 MI EAST OF STIGLER AT SH. 9 AND EXTEND 4.0 MI NORTH TO GARLAND (TAMAHA RD PHASE 1) UT FOR 24967(04) $31,800 DIV. $31,800 HASKELL 1 28411(04) CO RD 2.80 MI. FY 2013 GRADE,DRAINING,BRIDGE & SURFACE CO. RD. EW1270 WEST LONA VALLEY RD. BEG. 2.0 MI W. & 4.0 MI N. OF KINTA,EXT 2.8 MI. EAST TO SH-2 (OVER UNNAMED CREEK) $1,770,200 DIV. $1,770,200 HASKELL 1 28499(06) CO RD 6.50 MI. FY 2013 RIGHT OF WAY CO RD NS 4580 & EW 1175 BEGINNING 3.0 MI EAST OF KEOTA AT SH 9 EXTEND NORTH 3.5 MI THEN 3.0 MI EAST. (STAR ROAD) ROW FOR 28499(04) $21,200 DIV. $21,200 HASKELL 1 28499(07) CO RD 6.50 MI. FY 2013 UTILITIES CO RD NS 4580 & EW 1175 BEGINNING 3.0 MI EAST OF KEOTA AT SH 9 EXTEND NORTH 3.5 MI THEN 3.0 MI EAST. (STAR ROAD) UT FOR 28499(04) $21,200 DIV. $21,200 HUGHES 3 24968(04) CO RD 8.00 MI. FY 2013 GRADE,DRAINING,BRIDGE & SURFACE CO RD FROM 3.0 MI SOUTH & 4.0 MI EAST OF THE SH-75/SH-9 JCT EXTEND EAST 3.0 MI (INLUDES GREASY CR) CARSON RD $3,710,000 DIV. $3,710,000 HUGHES 3 24968(06) CO RD 6.75 MI. FY 2013 RIGHT OF WAY CO RD FROM 3.0 MI SOUTH & 4.0 MI EAST OF THE SH-75/SH-9 JCT EXTEND EAST 6.75 MI (ROW FOR 24968(04) CARSON RD. $227,900 DIV. $227,900 HUGHES 3 24968(07) CO RD 6.75 MI. FY 2013 UTILITIES CO RD FROM 3.0 MI SOUTH & 4.0 MI EAST OF THE SH-75/SH-9 JCT EXTEND EAST 6.75 MI (UT FOR 24968(04) CARSON RD. $113,950 DIV. $113,950 JACKSON 5 28021(04) COBRGE 0.00 MI. FY 2013 BRIDGE & APPROACHES CO BR OVER BITTER CREEK APPROX 5.5 MILE NORTH & 2.0 MILE WEST OF ALTUS $80,560 DIV. $402,800 JEFFERSON 7 28375(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES BRIDGE AND APPROACHES (EW-207) OVER FROG CREEK, 0.5 MILES SOUTH AND 2.1 MILES EAST OF RYAN $76,320 DIV. $381,600 JEFFERSON 7 28375(06) COBRGE 0.25 MI. FY 2013 RIGHT OF WAY BRIDGE AND APPROACHES (EW-207) OVER FROG CREEK, 0.5 MILES SOUTH AND 2.1 MILES EAST OF RYAN ROW FOR 28375(04) $5,300 DIV. $5,300 JEFFERSON 7 28375(07) COBRGE 0.25 MI. FY 2013 UTILITIES BRIDGE AND APPROACHES (EW-207) OVER FROG CREEK, 0.5 MILES SOUTH AND 2.1 MILES EAST OF RYAN UT FOR 28375(04) $10,600 DIV. $10,600 JEFFERSON 7 28378(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES BRIDGE AND APPROACHES (EW-191) OVER UNNAMED CREEK, 10.7 MILES EAST OF ADDINGTON $65,720 DIV. $328,600 Friday, July 8, 2011 Page 30 of 63 5 YEAR CIRB WORK PLAN JEFFERSON 7 28378(06) COBRGE 0.25 MI. FY 2013 RIGHT OF WAY BRIDGE AND APPROACHES (EW-191) OVER UNNAMED CREEK, 10.7 MILES EAST OF ADDINGTON ROW FOR 28378(04) $5,300 DIV. $5,300 JEFFERSON 7 28378(07) COBRGE 0.25 MI. FY 2013 UTILITIES BRIDGE AND APPROACHES (EW-191) OVER UNNAMED CREEK, 10.7 MILES EAST OF ADDINGTON UT FOR 28378(04) $10,600 DIV. $10,600 JEFFERSON 7 28443(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (NS-296) OVER MUD CREEK, 7.2 MILES WEST AND 4.9 MILES SOUTH OF CORNISH PE FOR 28443(04) $53,000 DIV. $53,000 JOHNSTON 3 28574(06) COBRGE 0.50 MI. FY 2013 RIGHT OF WAY BRIDGE AND APPROACHES OVER THE WASHITA RIVER, GREASY BEND BRIDGE (R/W FOR 2857404) $53,000 DIV. $53,000 KAY 4 28431(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING COUNTY BRIDGE ON EW-13 OVER BOIS D'ARC CREEK, 2.9 MILES WEST AND 1.0 MILES NORTH OF KILDARE CN 71 PE FOR 28431(04) CIRB FUNDS $53,000 DIV. $53,000 KAY 4 28433(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES COUNTY BRIDGE ON EW-18 OVER BOIS D'ARC CREEK, 4.0 MILES SOUTH AND 3.5 MILES WEST OF KILDARE CN 103 $106,000 DIV. $530,000 KINGFISHER 4 22821(06) CO RD 2.00 MI. FY 2013 GRADE, DRAIN & SURFACE CO. RD.: (NS-274) APPROX 8.0 MI W. & 5.0 MI N. OF OKARCHE @ CO RD(EW-84) EXT APPROX 2.0 MI N. TO SH-33 $1,060,000 DIV. $1,060,000 KINGFISHER 4 28361(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES BRIDGE AND APPROACHES ON EW-66 OVER TURKEY CREEK, 4.0 SOUTH AND 2.0 MILES WEST OF JCT SH-51/US-81 $106,000 DIV. $530,000 KINGFISHER 4 28437(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING COUNTY BRIDGE ON EW 60 OVER TURKEY CREEK, 2.2 MILES WEST AND 2.0 MILES NORTH OF JCT US-81/SH-51 PE FOR 28437(04) CIRB FUNDS $53,000 DIV. $53,000 KIOWA 5 28022(04) COBRGE 0.00 MI. FY 2013 BRIDGE & APPROACHES CO BR OVER RAINY MOUNTAIN CREEK APPROX 3.0 MILE WEST & 6.9 MILE SOUTH OF GOTEBO $80,560 DIV. $402,800 LATIMER 2 25095(04) CO RD 4.00 MI. FY 2013 GRADE,DRAINING,BRIDGE & SURFACE CO. RD.(EW-159) BEG APPROX. 4.0 MILE WEST OF SH-2 & EXT EAST 4.0 MILE $2,862,000 DIV. $2,862,000 LATIMER 2 28613(04) COBRGE 0.35 MI. FY 2013 BRIDGE & APPROACHES BRIDGE AND APPROACHES OVER WEST FORK CREEK ON EW-158, LOCATED 5.6 MILE WEST AND 0.3 MILE WEST OF YANUSH $63,600 DIV. $318,000 LATIMER 2 28613(06) COBRGE 0.35 MI. FY 2013 RIGHT OF WAY BRIDGE AND APPROACHES OVER WEST FORK CREEK ON EW-158, LOCATED 5.6 MILE WEST AND 0.3 MILE WEST OF YANUSH (RW FOR 2861304) $5,300 DIV. $5,300 LATIMER 2 28613(07) COBRGE 0.35 MI. FY 2013 UTILITIES BRIDGE AND APPROACHES OVER WEST FORK CREEK ON EW-158, LOCATED 5.6 MILE WEST AND 0.3 MILE WEST OF YANUSH (UT FOR 2861304) $5,300 DIV. $5,300 LEFLORE 2 27371(04) COBRGE 0.20 MI. FY 2013 BRIDGE & APPROACHES CO BR OVER FOURCHE MALINE CREEK APPROX 2.0 MILE NORTH OF LEFLORE $318,000 DIV. $826,800 LEFLORE 2 27372(04) COBRGE 0.20 MI. FY 2013 BRIDGE & APPROACHES CO BR OVER RED OAK CREEK APPROX 2.7 MILE NORTH OF LEFLORE $265,000 DIV. $773,800 LINCOLN 3 25088(05) CO RD 6.00 MI. FY 2013 PRELIMINARY ENGINEERING CO RD: FR US-62 4.0 MI EAST OF MEEKER EXT NORTH 6.0 MI PE FOR 25088(04) $106,000 DIV. $106,000 LINCOLN 3 25088(06) CO RD 6.00 MI. FY 2013 RIGHT OF WAY CO RD: FR US-62 4.0 MI EAST OF MEEKER EXT NORTH 6.0 MI ROW FOR 25088(04) $53,000 DIV. $53,000 LINCOLN 3 25088(07) CO RD 6.00 MI. FY 2013 UTILITIES CO RD: FR US-62 4.0 MI EAST OF MEEKER EXT NORTH 6.0 MI UT FOR 25088(04) $53,000 DIV. $53,000 Friday, July 8, 2011 Page 31 of 63 5 YEAR CIRB WORK PLAN LOGAN 4 25090(06) COBRGE 0.38 MI. FY 2013 RIGHT OF WAY CO BR OVER SKELETON CR, 2.0 MI WEST & 1.3 MI SOUTH OF SH-51/SH-74E ROW FOR 25090(04) $5,300 DIV. $5,300 LOGAN 4 25090(07) COBRGE 0.38 MI. FY 2013 UTILITIES CO BR OVER SKELETON CR, 2.0 MI WEST & 1.3 MI SOUTH OF SH-51/SH-74E UT FOR 25090(04) $5,300 DIV. $5,300 LOGAN 4 26645(04) CO RD 0.00 MI. FY 2013 RESURFACE CO RD(EW-87)(CHARTER OAK RD) BEG @ NS-309(KELLY AVE) EXT EAST TO NS-310 (BROADWAY BLVD) $94,185 DIV. $470,924 LOGAN 4 27519(04) COBRGE 0.20 MI. FY 2013 BRIDGE & APPROACHES BRIDGE & APPROACHES ON CO RD EW-081 OVER AN UNNAMED CREEK 2.9 MI WEST OF MERIDIAN $159,000 DIV. $344,427 LOGAN 4 28715(05) CO RD 5.00 MI. FY 2013 PRELIMINARY ENGINEERING PHASE 1 MIDWEST BLVD FROM WATERLOO NORTH 4 MILES TO EW-85 THEN WEST 1 MILE TO NS-314(AIR DEPOT/ PINE ROAD) PE FOR 28715(04) $106,000 DIV. $106,000 LOVE 7 25447(06) CO RD 0.00 MI. FY 2013 RIGHT OF WAY CO RD: FROM SH-76 EAST 6.0 MI (3 BRIDGES0 (4304C) ROW FOR 25447(04) $159,000 DIV. $159,000 LOVE 7 25447(07) CO RD 0.00 MI. FY 2013 UTILITIES CO RD: FROM SH-76 EAST 6.0 MI (3 BRIDGES0 (4304C) UT FOR 25447(04) $265,000 DIV. $265,000 MAJOR 6 27393(04) COBRGE 0.18 MI. FY 2013 BRIDGE & APPROACHES CO BR ON CO RD D-0454 OVER GRIEVER CREEK 3.5 MI EAST & 0.5 MI SOUTH OF SHERMAN $106,000 DIV. $530,000 MAJOR 6 28346(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES ON NS-256 OVER EAGLE CHIEF CREEK, 1.5 MILES NORTH OF CLEO SPRINGS PE FOR 28346(04) CIRB FUNDS $58,300 DIV. $58,300 MARSHALL 2 25105(04) CO RD 4.00 MI. FY 2013 GRADE, DRAIN & SURFACE CO RD(EW-200)(LINN RD) BEG APPROX 5.0 MILE EAST OF SH-99 & EXT EAST & SOUTH APPROX 4.8 MILE(PHASE I) $3,826,006 DIV. $3,826,006 MARSHALL 2 25105(05) CO RD 5.00 MI. FY 2013 GRADE & DRAIN CO. RD(EW-200)(LINN RD) BEG @ SH-99 & EXTEND EAST APPROX 5.0 MILES (PHASE II) $3,826,006 DIV. $3,826,006 MARSHALL 2 28618(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 2.5 MILES WEST AND 5.4 MILES SOUTH OF MADILL $198,750 DIV. $622,750 MARSHALL 2 28618(06) COBRGE 0.25 MI. FY 2013 RIGHT OF WAY BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 2.5 MILES WEST AND 5.4 MILES SOUTH OF MADILL RW FOR 2861804 $5,300 DIV. $5,300 MARSHALL 2 28618(07) COBRGE 0.25 MI. FY 2013 UTILITIES BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 2.5 MILES WEST AND 5.4 MILES SOUTH OF MADILL UT FOR 2861804 $5,300 DIV. $5,300 MARSHALL 2 28619(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 1.0 MILE NORTH OF TYLER $198,750 DIV. $622,750 MARSHALL 2 28619(06) COBRGE 0.25 MI. FY 2013 RIGHT OF WAY BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 1.0 MILE NORTH OF TYLER RW FOR 2861904 $5,300 DIV. $5,300 MARSHALL 2 28619(07) COBRGE 0.25 MI. FY 2013 UTILITIES BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 1.0 MILE NORTH OF TYLER UT FOR 2861904 $5,300 DIV. $5,300 MAYES 8 25416(04) COBRGE 0.00 MI. FY 2013 BRIDGE & APPROACHES COUNTY ROAD(EW-50) OVER PRYOR CREEK APPROX 1.0 MILE WEST OF US-69 $873,440 DIV. $873,440 MAYES 8 27813(04) COBRGE FY 2013 BRIDGE & APPROACHES CO BR ON EW 600 OVER MURPHY CREEK APPX 5.8 MILE EAST OF US412 AND US69 $182,320 DIV. $449,440 Friday, July 8, 2011 Page 32 of 63 5 YEAR CIRB WORK PLAN MCCLAIN 3 21139(04) COBRGE 0.20 MI. FY 2013 BRIDGE & APPROACHES COUNTY BRIDGE OVER WALNUT CREEK, 4.6 MILES NORTH AND 2.0 MILES EAST OF SH-59/SH-39 JCT $297,739 DIV. $297,739 MCCURTAIN 2 22056(04) COBRGE 0.20 MI. FY 2013 BRIDGE & APPROACHES CO BR OVER BENNINGFIELD CREEK, APPROX. 0.5 MI SOUTH & 1.5 MI WEST OF NORTH POLE $116,600 DIV. $434,600 MCCURTAIN 2 25469(06) COBRGE 1.70 MI. FY 2013 RIGHT OF WAY CO BR OVER LITTLE RIVER CR, 1.6 MI NORTH & 0.5 MI EAST OF GARVIN (4530C) ROW FOR 25469(04) $30,019 DIV. $30,019 MCCURTAIN 2 25469(07) COBRGE 1.70 MI. FY 2013 UTILITIES CO BR OVER LITTLE RIVER CR, 1.6 MI NORTH & 0.5 MI EAST OF GARVIN (4530C) UT FOR 25469(04) $31,800 DIV. $31,800 MCCURTAIN 2 25470(06) COBRGE 0.30 MI. FY 2013 RIGHT OF WAY CO BR OVER GLOVER, GOLDEN & HOLLY CREEKS, 3.6 MI NORTH OF IDABEL ROW FOR 25470(04) $3,423 DIV. $3,423 MCCURTAIN 2 25470(07) COBRGE 0.30 MI. FY 2013 UTILITIES CO BR OVER GLOVER, GOLDEN & HOLLY CREEKS, 3.6 MI NORTH OF IDABEL UT FOR 25470(04) $3,885 DIV. $3,885 MCINTOSH 1 25103(04) CO RD 3.80 MI. FY 2013 GRADE,DRAINING,BRIDGE & SURFACE CO. RD(EW103) BEG @ OLD US-69(NS421) & EXT EAST 2.0 MI., NORTH 1.0 MI. (NS423), EAST 0.2MI.(EW102), NORTH 0.6MI,(NS4232). $2,120,000 DIV. $2,120,000 MURRAY 7 27855(05) CO RD 6.00 MI. FY 2013 PRELIMINARY ENGINEERING GRADE, DRAIN, BRIDGE AND SURFACE ON EW-169. BEGIN AT US-177 AND EXTEND EAST 6.0 MILES PE FOR 27855(04) $291,500 DIV. $291,500 MURRAY 7 28427(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES BRIDGE AND APPROACHES (EW-167) OVER ROCK CREEK, 1.5 MILES SOUTH AND 1.7 MILES EAST OF OAK GROVE $106,000 DIV. $530,000 MURRAY 7 28427(06) COBRGE 0.25 MI. FY 2013 RIGHT OF WAY BRIDGE AND APPROACHES (EW-167) OVER ROCK CREEK, 1.5 MILES SOUTH AND 1.7 MILES EAST OF OAK GROVE ROW FOR 28427(04) $5,300 DIV. $5,300 MURRAY 7 28427(07) COBRGE 0.25 MI. FY 2013 UTILITIES BRIDGE AND APPROACHES (EW-167) OVER ROCK CREEK, 1.5 MILES SOUTH AND 1.7 MILES EAST OF OAK GROVE UT FOR 28427(04) $10,600 DIV. $10,600 MUSKOGEE 1 25420(04) COBRGE 0.50 MI. FY 2013 BRIDGE & APPROACHES CO RD(EW-87) OVER PECAN CREEK APPROX. 0.5 MILE SOUTH & 3.0 MILE EAST OF TAFT $1,060,000 DIV. $1,060,000 NOBLE 4 25422(04) CO RD 6.00 MI. FY 2013 GRADE, DRAIN & SURFACE CO RD(NS-312) BEG APPROX 4.5 MILE NORTH OF US-412 & EXT NORTH APPROX 5.0 MILE TO
Object Description
Description
Title | cirb_fy2012-2016_workplan |
OkDocs Class# | T1300.3 C578c 2011/16 |
Digital Format | PDF, Adobe Reader required |
ODL electronic copy | Downloaded from agency website: http://www.okladot.state.ok.us/cirb/pdfs/cirb_fy2012-2016_workplan.pdf |
Rights and Permissions | This Oklahoma state government publication is provided for educational purposes under U.S. copyright law. Other usage requires permission of copyright holders. |
Language | English |
Full text | FY-2012 through FY-2016 Construction Work Plan Oklahoma Department of Transportation in Cooperation with the County Advisory Board CIRB County Improvements for Roads and Bridges BUDGETARY PROJECTIONS 1 Budgetary Projections House Bill 1176 Applicable Provisions With the passage of House Bill 1176 in the summer of 2006, a new section of law was codified in the Oklahoma Statutes as Section 507 of Title 69. This law effectively creates the County Improvements for Roads and Bridges (CIRB) program and reads as follows: A. There is hereby created in the State Treasury a revolving fund to be known as the “County Improvements for Roads and Bridges Fund”. The fund shall be a continuing fund, not subject to fiscal year limitations, and shall consist of all appropriations and transfers made by the Legislature and the apportionments made pursuant to subsection L of Section 1104 of Title 47 of the Oklahoma Statutes. All monies accruing to the credit of said fund are hereby appropriated and may be budgeted and expended beginning with the fiscal year ending June 30, 2008, and each fiscal year thereafter pursuant to subsection B of this section. Expenditures from said fund shall be made upon warrants issued by the State Treasurer against claims filed as prescribed by law with the Director of State Finance for approval and payment. B. The funds apportioned pursuant to subsection L of Section 1104 of Title 47 of the Oklahoma Statutes shall be in equal amounts to the various Transportation Commission districts. The funds shall be used for the sole purpose of construction or reconstruction of county roads or bridges on the county highway system that are of the highest priority as defined by the Transportation Commission. Counties may accumulate annual funding for a period of up to five (5) years for a specific project, with such funding to be held by the Transportation Commission to the credit of the county project. The Transportation Commission shall promulgate rules for the administration of the process and the development of criteria for determining the level of priority for projects and include such projects in a five-year construction plan that will be updated annually. Projects in the five-year construction plan shall be contracted as provided by law and awarded by the Transportation Commission. C. The fund shall be invested in whatever instruments are authorized by law for investments by the State Treasurer and the interest earned by any investment of monies from the fund shall be credited to the fund which shall earn the same, if there is any unexpended balance of such fund to which to credit the interest. The interest credited herein shall be expended pursuant to this section. Key Provisions of the CIRB Program 15 percent of the Motor Vehicle Tax is directed to the newly created County Improvements for Roads and Bridges (CIRB) which is administered by the Department. Previously, this portion of the taxes and fees went to the General Revenue Fund. The apportionment for the County Improvements for Roads and Bridges (CIRB) will be phased in at a rate of 5 percent per year. When fully implemented the estimated annual amount provided to county roads is estimated to be $85.6 million (see attached graph). The funds are directed to be equally distributed by the Department’s eight (8) Transportation Commission Districts and administered by the Department through the utilization of a Transportation Commission approved five-year construction work plan for projects on the county road system. The five-year CIRB plan is developed through careful coordination with the County Commissioners along with the assistance provided by their respective Circuit Engineering Districts. Projects included in the CIRB plan consist of the highest priority, most critical projects as identified and validated by the cooperative project recommendation, selection and approval process. SELECTION & BALANCING PROCESS Selection and Balancing Process The balancing and management of the CIRB Construction Work Plan is progressed in accordance with the roles and responsibilities generally defined in the following outline: County Commissioners The development of the CIRB Construction Work Plan begins with the identification of potential projects by the County Commissioners and is guided by their knowledge of the transportation needs and priorities in their respective Districts. They and their staff work to maintain an understanding of the condition of the roads and bridges in their areas of responsibility and typically consider the following general project selection characteristics as applicable and listed in no particular order: Surface condition Bridge condition Geometrics (horizontal and vertical alignment) Average annual daily traffic (AADT) Percentage of truck traffic Accident history Local, regional and sometimes national traffic patterns Capacity The further understanding gained from these considerations is coupled with the definition of a “critical, high priority project” to guide the Commissioner’s recommendations. As a result, recommended CIRB projects are anticipated to be comprised of improvements to the county transportation system that advance the safety and mobility benefits realized by the traveling public and commerce and the extent that the projects will enhance the overall level of service and longevity of these facilities. For example: Given the current condition of Oklahoma’s State and County bridge infrastructure, an easily supported critical, high priority project could consist of a structurally deficient and/or functionally obsolete bridge in excess of 200’ in length and on the county collector system. These facilities number in excess of 140, typically inhibit safe and efficient travel and are also most often load posted. In addition, these bridges are very difficult for the County Commissioners to replace as part of their regular transportation program due to the expense and magnitude of the endeavor. A single bridge of this type constitutes an unfunded, long term problem and, if addressed through conventional funding sources, represents a tremendous drain on a County’s already limited resources. Roadway and/or bridge improvements that represent “county mobility corridors” might also be considered as critical, high priority projects as long as the proposed solution is of sufficient design and is supported by sound engineering judgment. A project of this type could include several contiguous miles of roadway, culvert and bridge improvements and might even span and be recommended by multiple counties. County road intersection improvements at locations that have poor sight triangles, sight distances, or other safety related deficiencies are good candidates. Often these locations are also noted by high traffic volumes and accident occurrences and may be proposed in combination with and as a component of “county mobility corridor” solutions. Circuit Engineering Districts The Circuit Engineering Districts (CEDs) are established by the County Commissioners to provide common engineering and project support services to the member Counties. The CEDs are governed by a Board with a County Commissioner representative from each participating County and each CED also elects a Board Member to a Statewide Circuit Engineering Board. The individual CEDs are not organizationally identical and may be staffed differently dependent on the desires and needs of the member Commissioners. The available resources that may be provided through a CED currently range from engineers to bridge and construction inspectors to management, production and support personnel. A CED may also choose to utilize the services of Consultants to assist with meeting the needs of their members. As related to the recommendation and delivery of CIRB projects, all potential projects are initiated by the County Commissioners and are coordinated with the appropriate Circuit Engineering District for further preparation, consideration, evaluation and screening. Each CED ultimately assists with the compilation of the proposed individual project request forms and directs the development of the recommended list of projects to be considered by the Department for addition to the CIRB Construction Work Plan. Concurrently and to the extent possible, the scope, schedule and budget of projects that previously existed in the Construction Work Plan are re-validated to determine the need for modifications. For projects that exist in the Construction Work Plan and that are being actively progressed, the CEDs assist with the facilitation of any necessary modifications to the scope, schedule and/or budgets of approved projects as more detailed information becomes available during the course of project development. The continuous assessment of these projects is accomplished through drive outs and/or other project team meetings conducted with the complete participation of appropriate Department, County and CED personnel as deemed necessary. The CEDs may also assist with the scheduling, coordination and documentation of these meetings and the larger project development process. Department of Transportation The responsibility for the expenditure of the CIRB funding has been placed with the Department of Transportation and the Transportation Commission has promulgated rules to guide the administration of the program. The simple role of the Department is to work with County Governments and their representatives to insure the long term budgetary integrity of the CIRB Construction Work Plan and the continuity of the projects it encompasses. In summary of the process, the County Commissioners identify and consider potential CIRB projects. The CEDs then assist with the completion of the project request forms and with the preparation of the recommended list of projects. Upon receipt of the CED recommendation and supporting documentation, the Department conducts an independent review of the proposed projects as determined necessary. The individual project evaluations are completed as appropriate drawing on the expertise of a team of Department personnel knowledgeable in the subject matter. When the proposed projects are validated, each requested project phase (Engineering, Right-of-Way, Utility Relocation, Construction) is then budgeted, scheduled and packaged for addition to the CIRB Construction Work Plan. The project additions are balanced to and fiscally constrained by the Transportation Commission District’s boundary and the projected allocation of the available CIRB funding. Based on the information generated by the described process, the Department will compile, prepare and present the CIRB Construction Work Plan for Transportation Commission consideration and approval annually. Ultimately, the Transportation Commission will consider the Department’s evaluation of the proposed CIRB projects and the resulting Construction Work Plan recommendation with a Statewide perspective. When the CIRB Construction Work Plan is approved, the Department coordinates and cooperates with the Counties and the CEDs in the active management of the project development and delivery process. As the projects develop, the Department also facilitates the regular maintenance, modification and adjustment of the Plan as necessary. SUMMARY REPORT FY Category CIRB Federal State Other Tribe Match Tribe Reimb. Total Construction $195,806,481 $40,057,643 $0 $5,416,311 $1,800,000 $1,119,000 $243,137,033 R/W & Utilities $13,370,083 $0 $0 $0 $0 $0 $13,370,083 Engineering $8,608,319 $0 $0 $0 $0 $0 $8,608,319 FY Totals $217,784,883 $40,057,643 $0 $5,416,311 $1,800,000 $1,119,000 $265,115,435 Construction $111,682,844 $19,760,486 $0 $1,441,388 $0 $500,000 $132,884,718 Engineering $2,527,260 $0 $0 $0 $0 $0 $2,527,260 R/W & Utilities $3,109,137 $0 $0 $0 $0 $0 $3,109,137 FY Totals $117,319,241 $19,760,486 $0 $1,441,388 $0 $500,000 $138,521,115 R/W & Utilities $3,819,570 $0 $0 $0 $0 $0 $3,819,570 Engineering $4,236,296 $0 $0 $0 $0 $0 $4,236,296 Construction $88,078,634 $18,200,456 $523,200 $2,050,417 $0 $0 $108,952,706 FY Totals $96,134,500 $18,200,456 $523,200 $2,050,417 $0 $0 $117,008,572 Construction $78,839,239 $18,619,193 $0 $3,000,848 $280,000 $2,000,000 $100,989,280 R/W & Utilities $1,255,000 $0 $0 $0 $0 $0 $1,255,000 Engineering $1,934,695 $0 $0 $0 $0 $0 $1,934,695 FY Totals $82,028,934 $18,619,193 $0 $3,000,848 $280,000 $2,000,000 $104,178,975 Construction $66,976,551 $11,127,660 $0 $32,000 $0 $0 $78,136,211 R/W & Utilities $897,468 $0 $0 $0 $0 $0 $897,468 Engineering $1,550,000 $0 $0 $0 $0 $0 $1,550,000 FY Totals $69,424,019 $11,127,660 $0 $32,000 $0 $0 $80,583,679 $582,691,577 $107,765,438 $523,200 $11,940,964 $2,080,000 $3,619,000 $705,407,776 Note: Preliminary Engineering projects are shown only in this summary and are not included in the then Fiscal Year project listing. Grand Total 2012 2013 2014 2015 2016 CIRB FUNDING SUMMARY CONSTRUCTION WORK PLAN FY 2012 – FY 2016 CONSTRUCTION WORK PLAN ***Projects are ordered by Fiscal Year and arranged alphabetically by County*** FFY 2012 5 YEAR CIRB WORK PLAN FISCAL YEAR 2012 CIRB$ Total$ ADAIR 1 24830(04) COBRGE 0.50 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER EVANSVILLE CR. 2.7 MI. E. AND 0.2 MI. N. OF SH-51 $1,545,000 DIV. $1,545,000 ADAIR 1 24830(06) COBRGE 0.50 MI. FY 2012 RIGHT OF WAY CO. BR. OVER EVANSVILLE CR. 2.7 MI. E. AND 0.2 MI. N. OF SH-51 (RW FOR 24830(04)) $25,750 DIV. $25,750 ADAIR 1 24830(07) COBRGE 0.50 MI. FY 2012 UTILITIES CO. BR. OVER EVANSVILLE CR. 2.7 MI. E. AND 0.2 MI. N. OF SH-51 (UT FOR 24830(04)) $51,500 DIV. $51,500 ADAIR 1 24831(07) COBRGE 0.50 MI. FY 2012 UTILITIES CO. BR. OVER ILLINOIS RIVER, 4.0 MI. S. AND 0.8 MI. E.OF NW C/L (UT FOR 24831(04)) $10,300 DIV. $10,300 ADAIR 1 25640(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER ROCK BRANCH CR., 5.8 MI. N. & 1.1 MI. W. OF CHANCE $309,000 DIV. $515,000 ALFALFA 6 24832(04) CO RD 5.00 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO. RD. ON EW-25 FROM 1.0 MI. W. OF ALFALFA C/L IN WOODS CO. EXT. E. 6.0 MI TO NS-255 (PH I) $4,017,000 DIV. $4,017,000 ALFALFA 6 24832(06) CO RD 5.00 MI. FY 2012 RIGHT OF WAY CO. RD. 7 BRIDGES, 17.0 MI. IN ALFALFA CO. & 1.0 MI. IN WOODS CO. (EW23, NS255,EW-25) (RW FOR 24832(04) $10,300 DIV. $10,300 ALFALFA 6 24832(07) CO RD 5.00 MI. FY 2012 UTILITIES CO. RD. 7 BRIDGES, 17.0 MI. IN ALFALFA CO. & 1. IN WOODS CO. (EW-23,NS255, EW-25) UT FOR 24832(04) $10,300 DIV. $10,300 ALFALFA 6 24832(10) CO RD 8.00 MI. FY 2012 RIGHT OF WAY CO. RD. ON NS-255 FROM EW-25 EXT. N. 2.0 MI. TO EW-23 THEN EXT. E. 6.0 MI. TO US-64 (PH II) RW FOR 24832(08) $10,300 DIV. $10,300 ALFALFA 6 24832(11) CO RD 8.00 MI. FY 2012 UTILITIES CO. RD. ON NS-255 FROM EW-25 EXT. N. 2.0 MI. TO EW-23 THEN EXT. E. 6.0 MI. TO US-64 (PH II) UT FOR 24832(08) $10,300 DIV. $10,300 ALFALFA 6 24833(05) CO RD 10.00 MI. FY 2012 PRELIMINARY ENGINEERING CO. RD. EW-08 FROM BYRON E TO ALFALFA C/L INC 3 BRIDGES (PE FOR 24833(04)(08)) $257,500 DIV. $257,500 ALFALFA 6 25910(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER EAGLE CHIEF CR., 3.2 MI. W. & 1.0 MI. N. OF CARMEN $525,485 DIV. $1,040,485 ALFALFA 6 26958(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES CO BR ON NS-252 OVER LITTLE MULE CREEK 2 MI WEST & 4.2 MI NORTH SH-8/SH-11 JCT $245,257 DIV. $515,000 ALFALFA 6 28343(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING IDGE AND APPROACHES ON EW-034 OVER EAGLE CHIEF CREEK, 1.0 MILES NORTH AND 0.5 MILES EAST OF ALINE PE FOR 28343(04) CIRB FUND $48,410 DIV. $48,410 ALFALFA 6 28351(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES ON NS-264 OVER UNNAMED CREEK, 3.0 MILES EAST OF CHEROKEE PE FOR 28351(04) CIRB FUNDS $48,410 DIV. $48,410 ALFALFA 6 28639(05) CO RD 4.50 MI. FY 2012 PRELIMINARY ENGINEERING RESURFACE EW-35, BEGIN AT WOODS CO LINE (NS-251) AND EXTEND EAST 4.5 MILES TO ALINE PE FOR 28639(04) $37,080 DIV. $37,080 ATOKA 2 22079(04) CO RD 4.00 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO. RD.:4.9 MILES S. OF SH-3, EXT. N 4.0 MI. TO SH 3(PH I) $2,966,194 DIV. $2,966,194 ATOKA 2 22079(05) COBRGE 4.00 MI. FY 2012 PRELIMINARY ENGINEERING CO. RD.: 4.9 MILES S. OF SH 3 EXTENDING N. TO SH 3 (PE FOR 22079(04)) $221,450 DIV. $221,450 ATOKA 2 22079(06) COBRGE 4.00 MI. FY 2012 RIGHT OF WAY CO. RD.: BEGINNING 4.9 MILES S. OF SH 3 EXTENDING N. 4.9 MILES (RW FOR 22079(04)) $123,600 DIV. $123,600 Friday, July 8, 2011 Page 1 of 63 5 YEAR CIRB WORK PLAN ATOKA 2 22079(07) COBRGE 4.00 MI. FY 2012 UTILITIES CO. RD.: BEGINNING 4.9 MILES S. OF SH 3 EXTENDING N. TO SH 3 (UT FOR 22079(04)). $51,500 DIV. $51,500 ATOKA 2 24835(04) COBRGE 1.30 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER N. BOGGY CR., 0.2 MI. E. OF EW-168, NS-393 AND 0.6 MI. E. OF EW-168, NS-393 $1,165,960 DIV. $1,165,960 ATOKA 2 24835(06) COBRGE 1.30 MI. FY 2012 UTILITIES CO. BR. OVER N. BOGGY CR., 0.2 MI. E. OF EW-168, NS-393 AND 0.6 MI. E. OF EW-168, NS-393 (RW FOR 24835(04)) $26,394 DIV. $26,394 ATOKA 2 25859(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER UNNAMED CR., 0.5 MI. N. & 1.2 MI. E. OF REYNOLDS $189,520 DIV. $395,520 ATOKA 2 25861(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER BIRCH CR., 1.0 MI. N. & 1.5 MI. E. OF WARDVILLE $102,176 DIV. $510,880 ATOKA 2 28603(05) COBRGE 0.20 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER BUCK CREEK, 0.6 MILES SOUTH OF CENTERPOINT PE FOR 2860304 $25,750 DIV. $25,750 ATOKA 2 28604(05) COBRGE 0.20 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES ON NS-395.5, OVER DOUBLE SPRING CREEK, 0.5 MILE EAST AND 0.9 SOUTH OF LANE PE FOR 2860404 $25,750 DIV. $25,750 ATOKA 2 28607(05) COBRGE 0.50 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER NORTH BOGGY CREEK ON EW-166 LOCATED 1.0 MILE WEST 2.0 MILES NORTH OF CHOCKIE PE FOR 2860704 $72,100 DIV. $72,100 BEAVER 6 24836(04) COBRGE 0.61 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER BEAVER RV. 4.0 MI. S. OF US-64 $4,635,000 DIV. $4,635,000 BEAVER 6 24836(06) COBRGE 0.61 MI. FY 2012 RIGHT OF WAY CO. BR. OVER BEAVER RV. 4.0 MI. S. OF US-64 (RW FOR 24836(04)) $10,300 DIV. $10,300 BEAVER 6 24836(07) COBRGE 0.61 MI. FY 2012 UTILITIES CO. BR. OVER BEAVER RV. 4.0 MI. S. OF US-64 (RW FOR 24836(04)) $10,300 DIV. $10,300 BEAVER 6 24837(05) COBRGE 0.66 MI. FY 2012 PRELIMINARY ENGINEERING CO. BR. OVER WILLOW CREEK, EW-15, 4.0 MI. E. & 6.0 MI. N. & 1.6 MI. E. OF BOYD (PE FOR 24837(04)) $141,719 DIV. $141,719 BEAVER 6 24837(06) COBRGE 0.66 MI. FY 2012 RIGHT OF WAY CO. BR. OVER WILLOW CR., EW-15, 4.0 MI. E., 6.0 MILE N AND 1.6 MILE E OF BOYD (RW FOR 24837(04)) $10,300 DIV. $10,300 BEAVER 6 24837(07) COBRGE 0.66 MI. FY 2012 UTILITIES CO. BR. OVER WILLOW CR., EW-15, 4.0 MI. E. , 6.0 MILE N AND 1.6 MILE E OF BOYD (UT FOR 24837(04)) $10,300 DIV. $10,300 BEAVER 6 24838(05) COBRGE 1.89 MI. FY 2012 PRELIMINARY ENGINEERING CO. BR. OVER DUGOUT CR., 0.7 MI. S. & 6.4 MI. W. OF BEAVER (PE FOR 24838(04)) $103,000 DIV. $103,000 BEAVER 6 26980(04) COBRGE 0.80 MI. FY 2012 BRIDGE & APPROACHES CO BR: (NS-148) OVER BEAVER RIVER 9 MI EAST & 11.9 NORTH OF ELMWOOD $497,575 DIV. $824,000 BEAVER 6 26981(04) COBRGE 0.30 MI. FY 2012 BRIDGE & APPROACHES CO RD (NS-133) OVER SOUTH FORK OF CLEAR CREEK 6 MI WEST & 0.8 MI SOUTH OF ELMWOOD $230,033 DIV. $515,000 BEAVER 6 28247(05) COBRGE 0.50 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE & APPROACHES OVER KIOWA CREEK, 3.0 MILES NORTH OF SLAPOUT PE FOR 28247(04) CIRB FUNDS $77,250 DIV. $77,250 BEAVER 6 28349(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING COUNTY BRIDGE ON NS-141 OVER CLEAR CREEK, 2.0 MILES NORTH AND 2.0 MILES EAST OF ELMWOOD PE FOR 28349(04) CIRB FUNDS $72,100 DIV. $72,100 Friday, July 8, 2011 Page 2 of 63 5 YEAR CIRB WORK PLAN BECKHAM 5 24840(04) CO RD 7.50 MI. FY 2012 GRADE, DRAIN & SURFACE CO. RD. FROM SH-34, EXT. 4.5 MI. W. THEN 3.0 MI. S. $2,407,625 DIV. $2,407,625 BLAINE 5 24799(04) COBRGE 0.38 MI. FY 2012 BRIDGE & APPROACHES LOW WATER CROSS OVER SALT CR, 7.2 MI SOUTH & 1.0 MI WEST OF SH-8/SH-51 JCT IN OKEENE $907,430 DIV. $907,430 BLAINE 5 26618(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO BR: OVER SALT CR, 2.0 MI EAST & 4.7 MI SOUTH OF THE SH-51/SH-8 IN OKEENE $72,100 DIV. $360,500 BLAINE 5 28694(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING COBR. REPLACE BRIDGE OVER 9 MILE CREEK,6 MI. S. AND 0.4 EAST OF CANTON. PE FOR 28694(04) $30,900 DIV. $30,900 BRYAN 2 20149(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR: OVER NEWBERRY CR, 1.1 MI NORTH OF US-70 & 0.5 MI EAST OF MEAD (ON NS 366) $123,600 DIV. $618,000 BRYAN 2 21654(04) COBRGE 0.30 MI. FY 2012 BRIDGE & APPROACHES CO BR:OVER J-N CREEK, APPROX. 2.3 MI. S. & 0.5 MI. W. OF BLUE $257,500 DIV. $615,940 BRYAN 2 21654(06) COBRGE 0.25 MI. FY 2012 RIGHT OF WAY CO BR: OVER J-N CR., APPROX. 2.3 MI. S. & 0.5 MI. W. OF BLUE R/W FOR 2165404 $5,150 DIV. $5,150 BRYAN 2 21654(07) COBRGE 0.25 MI. FY 2012 UTILITIES CO BR: OVER J-N CR., APPROX. 2.3 MI. S. & 0.5 MI. W. OF BLUE UT FOR 2165404 $5,150 DIV. $5,150 BRYAN 2 24800(06) COBRGE 0.95 MI. FY 2012 RIGHT OF WAY CO BR OVER THE RED RIVER, S.E. OF HENDRIX (CARPENTERS BLUFF BR) (ROW FOR 24800(04) $91,928 DIV. $91,928 BRYAN 2 24800(07) COBRGE 0.95 MI. FY 2012 UTILITIES CO BR OVER THE RED RIVER, S.E. OF HENDRIX (CARPENTERS BLUFF BR) (UT FOR 24800(04) $64,890 DIV. $64,890 BRYAN 2 27889(04) CO RD 2.00 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD(NS-366) BEG APPROX 6.0 MILE SOUTH OF US-70 & EXT SOUTH APPROX 2.0 MILE. $267,800 DIV. $1,297,800 BRYAN 2 27889(06) CO RD 2.00 MI. FY 2012 RIGHT OF WAY CO RD(NS-366) BEG APPROX 6.0 MILE SOUTH OF US-70 & EXT SOUTH APPROX 2.0 MILE. R/W FOR 2788904 $15,450 DIV. $15,450 BRYAN 2 27889(07) CO RD 2.00 MI. FY 2012 UTILITIES CO RD(NS-366) BEG APPROX 6.0 MILE SOUTH OF US-70 & EXT SOUTH APPROX 2.0 MILE. UT FOR 2788904 $25,750 DIV. $25,750 CADDO 7 24802(05) CO RD 2.00 MI. FY 2012 RIGHT OF WAY CO RD (EW-131) BEG AT US-281 & EXTEND WEST APPROXIMATELY 5.8 MILES ROW FOR 24802(04) $412,000 DIV. $412,000 CADDO 7 24802(06) CO RD 2.00 MI. FY 2012 UTILITIES CO RD (EW-131) BEG AT US-281 & EXTEND WEST APPROXIMATELY 5.8 MILES UT FOR 24802(04) $463,500 DIV. $463,500 CADDO 7 24803(05) COBRGE 1.00 MI. FY 2012 PRELIMINARY ENGINEERING CO BR OVER THE LITTLE WASHITA RIVER WEST OF CYRIL ON NS-267 BEG @ SH-19 & EXT APPROX 1.0 MILE SOUTH(2 BRIDGES) (PE FOR 24803(04)) $257,500 DIV. $257,500 CADDO 7 26867(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR: ON NS-261, OVER CEDAR CR, 6.0 MI SOUTH OF BINGER $83,842 DIV. $419,210 CADDO 7 26867(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO BR: ON NS-261, OVER CEDAR CR, 6.0 MI SOUTH OF BINGER ROW FOR 26867(04) $5,150 DIV. $5,150 CADDO 7 26867(07) COBRGE 0.20 MI. FY 2012 UTILITIES CO BR: ON NS-261, OVER CEDAR CR, 6.0 MI SOUTH OF BINGER UT FOR 26867(04) $5,150 DIV. $5,150 Friday, July 8, 2011 Page 3 of 63 5 YEAR CIRB WORK PLAN CADDO 7 27424(04) CO RD 1.70 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD(EW-131) BEG APPROX 3.2 MILE EAST OF JCT OF SH-146/SH-9 & EXT EAST APPROX 1.7 MILE $1,002,370 DIV. $1,414,370 CADDO 7 28389(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER WASHITA RIVER, 1.5 MILES WEST OF ANADARKO PE FOR 28389(04) $77,250 DIV. $77,250 CADDO 7 28409(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES BRIDGE AND APPROACHES (EW-110) OVER SUGAR CREEK, 2.7 MILES WEST AND 3.5 MILES SOUTH OF JCT US-281/SH-37 IN HINTON $115,360 DIV. $576,800 CADDO 7 28409(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-110) OVER SUGAR CREEK, 2.7 MILES WEST AND 3.5 MILES SOUTH OF JCT US-281/SH-37 IN HINTON PE FOR 28409(04) $46,350 DIV. $46,350 CADDO 7 28409(06) COBRGE 0.25 MI. FY 2012 RIGHT OF WAY BRIDGE AND APPROACHES (EW-110) OVER SUGAR CREEK, 2.7 MILES WEST AND 3.5 MILES SOUTH OF JCT US-281/SH-37 IN HINTON ROW FOR 28409(04) $5,150 DIV. $5,150 CADDO 7 28409(07) COBRGE 0.25 MI. FY 2012 UTILITIES BRIDGE AND APPROACHES (EW-110) OVER SUGAR CREEK, 2.7 MILES WEST AND 3.5 MILES SOUTH OF JCT US-281/SH-37 IN HINTON UT FOR 28409(04) $10,300 DIV. $10,300 CADDO 7 28425(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-114) OVER SUGAR CREEK, 0.2 MILES EAST OF LOOKEBA PE FOR 28425(04) $51,500 DIV. $51,500 CANADIAN 4 24804(06) CO RD 4.00 MI. FY 2012 RIGHT OF WAY CO RD FROM US-81 IN OKARCHE WEST 4.0 MI (EW-89) ROW FOR 24804(04) $6,695 DIV. $6,695 CANADIAN 4 24804(07) CO RD 4.00 MI. FY 2012 UTILITIES CO RD FROM US-81 IN OKARCHE WEST 4.0 MI (EW-89) UT FOR 24804(04) $6,695 DIV. $6,695 CANADIAN 4 26646(06) CO RD 2.00 MI. FY 2012 PRELIMINARY ENGINEERING CO RD(NS-274) BEG @ EW-91, APPROX 6.5 MILE NORTH OF CALUMET, & EXT NORTH 2.0 MILE TO EW-89(KINGFISHER C/L) PE FOR 2664604 CIRB FUNDS $74,160 DIV. $74,160 CANADIAN 4 26965(04) COBRGE 0.23 MI. FY 2012 BRIDGE & APPROACHES CO BR ON EW-105 OVER UNNAMED CREEK 1.1 MI EAST OF CADDO CO LINE $103,000 DIV. $515,000 CANADIAN 4 26966(04) COBRGE 0.23 MI. FY 2012 BRIDGE & APPROACHES CO BR ON EW-96 OVER A TRID TO UNCLE JOHNS CREEK 1.3 MI NORTH & 11.5 MI WEST OF PIEDMONT $98,880 DIV. $494,400 CARTER 7 24806(04) CO RD 0.50 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD WITHIN THE CITY OF LONE GROVE (MC-1068C) $780,664 DIV. $1,038,164 CARTER 7 24819(06) CO RD 3.30 MI. FY 2012 RIGHT OF WAY CO RD FROM I-35 @ THE LOVE C/L, NORTH & WEST TO THE DOLESE QUARRY INCLUDES HICKORY CR BR (MC-1032C) (ROW FOR 24819(04) $309,000 DIV. $309,000 CARTER 7 24819(07) CO RD 3.30 MI. FY 2012 UTILITIES CO RD FROM I-35 @ THE LOVE C/L, NORTH & WEST TO THE DOLESE QUARRY INCLUDES HICKORY CR BR (MC-1032C) (UT FOR 24819(04) $257,500 DIV. $257,500 CARTER 7 26848(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES CO BR ON EW-200 OVER WALNUT BAYOU CR, 4.0 MI SOUTH & 5.6 MI EAST OF THE US-70/SH-76 JCT (REPLACE LOW WATER CROSSING) $206,000 DIV. $1,043,312 CARTER 7 26848(06) COBRGE 0.25 MI. FY 2012 RIGHT OF WAY CO BR ON EW-200 OVER WALNUT BAYOU CR, 4.0 MI SOUTH & 5.6 MI EAST OF THE US-70/SH-76 JCT (REPLACE LOW WATER CROSSING) ROW FOR 26848(04) $10,300 DIV. $10,300 CARTER 7 26849(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR ON EW-200 OVER A TRIBUTARY OF WALNUT BAYOU CR, 4.0 MI SOUTH & 4.6 MI EAST OF THE US-70/SH-76 JCT (LOW WATER CROSSING) $107,120 DIV. $535,600 CARTER 7 28377(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (NS-319) OVER CADDO CREEK, 1.2 MILES EAST AND 1.8 MILES SOUTH OF MILO PE FOR 28377(04) $59,659 DIV. $59,659 Friday, July 8, 2011 Page 4 of 63 5 YEAR CIRB WORK PLAN CARTER 7 28379(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-3143) OVER TRIB TO BEAR CREEK, 0.2 MILES NORTH OF POOLEVILLE PE FOR 28379(04) $33,718 DIV. $33,718 CHEROKEE 1 22151(04) COBRGE 0.48 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO. BR. OVER THE ILLINOIS RIVER, 0.2 MI S.E. OF SH-10 (COMBS BR) $2,832,500 DIV. $2,832,500 CHEROKEE 1 22151(06) COBRGE 0.48 MI. FY 2012 RIGHT OF WAY CO. BR. OVER THE ILLINOIS RIVER, 0.2 MI S.E. OF SH-10 (COMBS BR) ROW FOR 22151(04) $25,750 DIV. $25,750 CHEROKEE 1 22151(07) COBRGE 0.48 MI. FY 2012 UTILITIES CO. BR. OVER THE ILLINOIS RIVER, 0.2 MI S.E. OF SH-10 (COMBS BR) UT FOR 22151(04) $25,750 DIV. $25,750 CHEROKEE 1 23430(08) COBRGE 0.43 MI. FY 2012 PRELIMINARY ENGINEERING CO. BR. OVER BARRON FORK CREEK, 0.8 MI SOUTH OF WELLING (PE FOR: 23430(04)) CIRB $77,250 DIV. $77,250 CHEROKEE 1 24824(06) CO RD 1.00 MI. FY 2012 RIGHT OF WAY CO RD: NS4410 FROM 3.8 MI S & 1.0 MI W. OF HULBERT, EXT. NORTH APPRX.1.0 MI OVER RATTLESNAKE CREEK TRIB. ( ROW FOR 24824(04)) $77,250 DIV. $77,250 CHEROKEE 1 24824(07) CO RD 1.00 MI. FY 2012 UTILITIES CO RD: NS4410 FROM 3.8 MI S & 1.0 MI W. OF HULBERT, EXT. NORTH APPRX.1.0 MI OVER RATTLESNAKE CREEK TRIB. (UT FOR 24824(04)) $77,250 DIV. $77,250 CHEROKEE 1 27350(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER PARKHILL CREEK ON FORESTRY RD 4 MI SOUTH & 0.5 MI EAST OF TAHLEQUAH $257,500 DIV. $515,000 CHOCTAW 2 21652(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES CO BR: OVER SALT CREEK, APPROX. 1.2 MI. N. & 1.9 MI. E OF HUGO $360,500 DIV. $721,000 CHOCTAW 2 21652(06) COBRGE 0.25 MI. FY 2012 RIGHT OF WAY CO BR: OVER SALT CREEK, APPROX. 1.2 MI. N. & 1.9 MI. E OF HUGO R/W FOR 2165204 $5,150 DIV. $5,150 CHOCTAW 2 21652(07) COBRGE 0.25 MI. FY 2012 UTILITIES CO BR: OVER SALT CREEK, APPROX. 1.2 MI. N. & 1.9 MI. E OF HUGO UT FOR 2165204 $5,150 DIV. $5,150 CHOCTAW 2 21653(04) COBRGE 0.30 MI. FY 2012 BRIDGE & APPROACHES COUNTY BRIDGE AND APPROACHES OVER BOKCHITO CREEK APPROX. 0.5 MILES SOUTH AND 1.4 MILES EAST OF SOPER $115,690 DIV. $578,448 CHOCTAW 2 24820(06) COBRGE 1.04 MI. FY 2012 RIGHT OF WAY CO BR OVER CLEAR BOGGY CR, 1.9 MI EAST & 4.3 MI NORTH OF BOSWELL ROW FOR 24820(04) $11,897 DIV. $11,897 CHOCTAW 2 24820(07) COBRGE 1.04 MI. FY 2012 UTILITIES CO BR OVER CLEAR BOGGY CR, 1.9 MI EAST & 4.3 MI NORTH OF BOSWELL UT FOR 24820(04) $16,223 DIV. $16,223 CHOCTAW 2 24821(06) COBRGE 1.14 MI. FY 2012 RIGHT OF WAY CO BR OVER MUDDY BOGGY CR, 5.0 MI NORTH OF US-70 ROW FOR 24821(04) $17,510 DIV. $17,510 CHOCTAW 2 24821(07) COBRGE 1.14 MI. FY 2012 UTILITIES CO BR OVER MUDDY BOGGY CR, 5.0 MI NORTH OF US-70 UT FOR 24821(04) $20,600 DIV. $20,600 CHOCTAW 2 28677(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 2.0 MILES NORTH OF FORT TOWSON $10,300 DIV. $216,300 CHOCTAW 2 28677(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 2.0 MILES NORTH OF FORT TOWSON $30,900 DIV. $30,900 CIMARRON 6 24823(04) CO RD 6.00 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD FROM US-287 WEST 6.0 MI @ THE TEXAS S/L (MC-1332C) $2,472,000 DIV. $2,472,000 Friday, July 8, 2011 Page 5 of 63 5 YEAR CIRB WORK PLAN CIMARRON 6 24823(06) CO RD 6.00 MI. FY 2012 RIGHT OF WAY CO RD FROM US-287 WEST 6.0 MI @ THE TEXAS S/L (MC-1332C) ROW FOR 24823(04) $10,300 DIV. $10,300 CIMARRON 6 24823(07) CO RD 6.00 MI. FY 2012 UTILITIES CO RD FROM US-287 WEST 6.0 MI @ THE TEXAS S/L (MC-1332C) UT FOR 24823(04) $10,300 DIV. $10,300 CIMARRON 6 24825(05) CO RD 11.50 MI. FY 2012 PRELIMINARY ENGINEERING CO RD: FROM SH-64 AT FELT, NORTH 11.5 MI. (MC-1342C) P.E. FOR 24825(04) $206,000 DIV. $206,000 CIMARRON 6 28322(05) CO RD 2.80 MI. FY 2012 PRELIMINARY ENGINEERING COUNTY ROAD NS-28 FROM EW-23 EXTEND NORTH 2.8 MILES TO US-56 IN BOISE CITY PE FOR 28322(04) CIRB FUNDS $30,900 DIV. $30,900 COAL 3 24942(04) COBRGE 0.50 MI. FY 2012 BRIDGE & APPROACHES CO BR @ A LOW WATER CROSSING, 1.0 MI SOUTH & 2.0 MI EAST OF LEHIGH $1,390,500 DIV. $1,390,500 COAL 3 24942(06) COBRGE 0.50 MI. FY 2012 RIGHT OF WAY CO BR @ A LOW WATER CROSSING, 1.0 MI SOUTH & 2.0 MI EAST OF LEHIGH ROW FOR 24942(04) $15,450 DIV. $15,450 COAL 3 24942(07) COBRGE 0.50 MI. FY 2012 UTILITIES CO BR @ A LOW WATER CROSSING, 1.0 MI SOUTH & 2.0 MI EAST OF LEHIGH UT FOR 24942(04) $20,600 DIV. $20,600 COMANCHE 7 21614(04) CO RD 6.00 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD: LEE BLVD.-FROM NS-244 EAST 6.0 MI $4,998,590 DIV. $5,790,660 COMANCHE 7 21614(06) CO RD 6.00 MI. FY 2012 RIGHT OF WAY CO RD: LEE BLVD.-FROM NS-246 EAST 6.0 MI (ROW FOR: 21614 (04)) $412,000 DIV. $412,000 COMANCHE 7 21614(07) CO RD 6.00 MI. FY 2012 UTILITIES CO RD: LEE BLVD. FROM NS-246 EAST 6.0 MI (UT FOR: 21614 (04)) $412,000 DIV. $412,000 COMANCHE 7 26850(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER WHISKEY CR, 2.0 MI NORTH & 4.7 MI EAST OF THE SH-17/US-277 JCT $79,104 DIV. $395,520 COMANCHE 7 26850(06) COBRGE 0.15 MI. FY 2012 RIGHT OF WAY CO BR OVER WHISKEY CR, 2.0 MI NORTH & 4.7 MI EAST OF THE SH-17/US-277 JCT ROW FOR 26850(04) $5,150 DIV. $5,150 COMANCHE 7 28373(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-170) OVER BEAVER CREEK, 3.0 MILES SOUTH AND 2.7 MILES EAST OF JCT SH-7/SH-65 (LOW WATER XING) PE FOR 28373(04) $56,897 DIV. $56,897 COMANCHE 7 28426(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-168) OVER TRIB. TO EAST CACHE CREEK, 1.0 MILE SOUTH AND 0.4 MILES EAST OF JCT I-44/SH-7 PE FOR 28426(04) $51,500 DIV. $51,500 COTTON 7 24858(04) COBRGE 2.00 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER CACHE CR., 2.1 MI. N. OF SH-53/SH-5 $1,776,750 DIV. $1,776,750 COTTON 7 27436(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO RD(NS-253) OVER A TRIB OF WEST CACHE CR. APPROX 1.0 MILE WEST & 0.2 MILE NORTH OF JCT US-277/SH-5 WEST. $70,452 DIV. $352,260 COTTON 7 27436(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO RD(NS-253) OVER A TRIB OF WEST CACHE CR. APPROX 1.0 MILE WEST & 0.2 MILE NORTH OF JCT US-277/SH-5 WEST. (RW FOR 27436(04)) $5,150 DIV. $5,150 COTTON 7 27436(07) COBRGE 0.20 MI. FY 2012 UTILITIES CO RD(NS-253) OVER A TRIB OF WEST CACHE CR. APPROX 1.0 MILE WEST & 0.2 MILE NORTH OF JCT US-277/SH-5 WEST. (UT FOR 27436(04)) $10,300 DIV. $10,300 COTTON 7 27486(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO RD(NS-257) OVER BIRD CREEK APPROX 3.0 MILE EAST & 1.7 MILE SOUTH OF JCT US-277/US-70 $65,920 DIV. $329,600 Friday, July 8, 2011 Page 6 of 63 5 YEAR CIRB WORK PLAN COTTON 7 27486(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO RD(NS-257) OVER BIRD CREEK APPROX 3.0 MILE EAST & 1.7 MILE SOUTH OF JCT US-277/US-70 ROW FOR 27486(04) $10,300 DIV. $10,300 COTTON 7 28372(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-179) OVER BEAVER CREEK, 4.0 MILES NORTH AND 2.8 MILES EAST OF JCT SH-53/SH-65 PE FOR 28372(04) $51,500 DIV. $51,500 CRAIG 8 24860(06) COBRGE 0.38 MI. FY 2012 RIGHT OF WAY CO. BR. OVER BIG CR., 2.0 MI. NE OF SH-10 (RW FOR 24860(04)) $20,600 DIV. $20,600 CRAIG 8 24860(07) COBRGE 0.38 MI. FY 2012 UTILITIES CO. BR. OVER BIG CR., 2.0 MI. NE OF SH-10 (UT FOR 24860(04)) $36,050 DIV. $36,050 CRAIG 8 28525(04) COBRGE FY 2012 BRIDGE & APPROACHES OTA OVERPASS $163,496 DIV. $2,489,304 CRAIG 8 28529(05) COBRGE FY 2012 PRELIMINARY ENGINEERING CO BR ON EW 240 OVER ELM CREEK APPX 2.0 MI NORTH OF VINITA (PE FOR 28529(04)) $92,700 DIV. $92,700 CRAIG 8 28530(05) COBRGE FY 2012 PRELIMINARY ENGINEERING CO BR ON NS 429 OVER BIG CREEK APPX 2.5 MILE SOUTH OF KANSAS SL (PE FOR 28530(04)) $66,950 DIV. $66,950 CREEK 8 22350(10) CO RD 1.00 MI. FY 2012 RIGHT OF WAY CO. RD: WEST 81ST STREET SOUTH, FROM FRANKOMA ROAD WEST TO SH-97 ROW FOR 22350(08) $247,200 DIV. $247,200 CREEK 8 22350(11) CO RD 1.00 MI. FY 2012 UTILITIES CO. RD: WEST 81ST STREET SOUTH, FROM FRANKOMA ROAD WEST TO SH-97 UT FOR 22350(08) $206,000 DIV. $206,000 CUSTER 5 24670(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER DEER CR. 1.4 MIS. E. AND 4.0 MIS N. OF CUSTER CITY, ON EW-89 $108,150 DIV. $540,750 CUSTER 5 24863(04) CO RD 4.80 MI. FY 2012 BRIDGE & APPROACHES CO. RD. US-183 AT ARAPAHO EXT. 4.8 MI. E. TO INTERSECT. OF MAJOR COLLECTORS $2,800,570 DIV. $2,800,570 CUSTER 5 24863(06) CO RD 4.80 MI. FY 2012 UTILITIES CO. RD. US-183 AT ARAPAHO EXT. 4.8 MI. E. TO INTERSECT. OF MAJOR COLLECTORS (UT FOR 24863(04)) $154,500 DIV. $154,500 CUSTER 5 24863(07) CO RD 4.80 MI. FY 2012 RIGHT OF WAY CO. RD. US-183 AT ARAPAHO EXT. 4.8 MI. E. TO INTERSECT. OF MAJOR COLLECTORS (RW FOR 24863(04)) $30,900 DIV. $30,900 CUSTER 5 28473(04) CO RD 0.00 MI. FY 2012 GRADE, DRAIN & SURFACE MAJOR COLLECTOR 2074C FROM EW101 & AIRPORT RD EAST & NORTH TO EW100 $164,800 DIV. $679,800 DELAWARE 8 20622(05) COBRGE 0.60 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER SPAVINAW CREEK $1,662,420 DIV. $1,662,420 DELAWARE 8 24864(04) COBRGE 0.38 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER FLY CR., 2.0 MIS. NW OF BERNICE $708,640 DIV. $708,640 DELAWARE 8 24864(06) COBRGE 0.38 MI. FY 2012 RIGHT OF WAY CO. BR. OVER FLY CR., 2.0 MIS. NW OF BERNICE RW FOR 24864(04) $44,290 DIV. $44,290 DELAWARE 8 24864(07) COBRGE 0.38 MI. FY 2012 UTILITIES CO. BR. OVER FLY CR., 2.0 MIS. NW OF BERNICE UT FOR 24864(04) $14,420 DIV. $14,420 DELAWARE 8 25901(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER UNNMAED CR., 1.0 MI. N. & 3.0 MI. E. OF THE SH-10/SH-25 JCT. $233,810 DIV. $583,701 Friday, July 8, 2011 Page 7 of 63 5 YEAR CIRB WORK PLAN DELAWARE 8 27820(05) COBRGE FY 2012 PRELIMINARY ENGINEERING CO BR OVER HONEY CREEK ON NS 467 PE FOR (04) $61,800 DIV. $61,800 DEWEY 5 24865(04) COBRGE 0.38 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER LONE CREEK, 3.2 MI. E. OF WEBB $1,002,705 DIV. $1,002,705 DEWEY 5 26653(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO BR APPROX 0.6 MILE WEST & 0.5 MILE NORTH OF SEILING. $72,100 DIV. $360,500 DEWEY 5 28695(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING COBR. REPLACE CO. BRIDGE OVER LONE CREEK,1.5MI. S. AND 3.8 MI. E OF WEBB. PE FOR 28695(04) $30,900 DIV. $30,900 ELLIS 6 24339(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO RD(EW-56) OVER LONG CREEK APPROX 5.0 MILE SOUTH & 6.3 MILE WEST OF SHATTUCK $355,350 DIV. $561,350 ELLIS 6 24866(04) COBRGE 1.00 MI. FY 2012 BRIDGE & APPROACHES CO. BR.(NS-190) OVER WOLF CREEK, APPROX. 1.5 MILES NORTH OF FARGO $2,884,000 DIV. $2,884,000 ELLIS 6 24866(06) COBRGE 1.00 MI. FY 2012 RIGHT OF WAY CO. BR. OVER WOLF CREEK (RW FOR 24866(04)) $10,300 DIV. $10,300 ELLIS 6 24866(07) COBRGE 1.00 MI. FY 2012 UTILITIES CO. BR. OVER WOLF CREEK (UT FOR 24866(04)) $10,300 DIV. $10,300 ELLIS 6 26248(04) CO RD 4.50 MI. FY 2012 RESURFACE CO. RD. 5.0 MI. S. OF FARGO, EXT. N. 4.5 MI. TO 7TH ST. IN FARGO $618,000 DIV. $1,648,000 GARFIELD 4 23739(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER CLEAR CR., 1 MI. S. AND 5.4 MI. W. OF LAHOMA, EW-44 $103,000 DIV. $515,000 GARFIELD 4 24867(04) COBRGE 2.50 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO. RD. NS-293 APPROX. 6.5 MI. W. OF DOUGLAS BEG @ EW-52.5, EXT. N. TO EW-50 (PHASE I) $1,545,000 DIV. $1,545,000 GARFIELD 4 24867(07) COBRGE 5.00 MI. FY 2012 GRADE, DRAIN & SURFACE CO. RD. NS-293 FROM EW-50 TO 45 (PHASE II) $2,266,000 DIV. $2,266,000 GARFIELD 4 24868(05) CO RD 11.00 MI. FY 2012 PRELIMINARY ENGINEERING CO. RD. EW-40 FROM NS-294 TO 305 (PE FOR 24868(04)(08)) $206,000 DIV. $206,000 GARFIELD 4 28421(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING COUNTY BRIDGE ON EW-54 OVER OTTER CREEK, 5.0 MILES SOUTH AND 2.4 WEST OF COVINGTON PE FOR 28421(04) CIRB FUNDS $48,410 DIV. $48,410 GARFIELD 4 28429(05) CO RD 3.00 MI. FY 2012 PRELIMINARY ENGINEERING COUNTY ROAD NS-285, STARTING 8.0 MI SOUTH AND 2.0 MI OF JCT US-81/US-412, (EW-51) EXTENDING NORTH 3.0 MILES PE FOR 28429(04) CIRB FUND $30,900 DIV. $30,900 GARVIN 3 24869(06) CO RD 5.00 MI. FY 2012 RIGHT OF WAY CO. RD. SH-19 AND NS-334, EXTEND N. TO EW-148 (RW FOR 24869(04)) $54,075 DIV. $54,075 GARVIN 3 24869(07) CO RD 5.00 MI. FY 2012 UTILITIES CO. RD. SH-19 AND NS-334, EXTEND N. TO EW-148 (UT FOR 24869(04)) $237,930 DIV. $237,930 GRADY 7 24945(06) CO RD 4.00 MI. FY 2012 RIGHT OF WAY CO RD FROM 0.5 MI NORTH OF I-44 NORTH TO SH-37 (MC-2686C) (SARA ROAD) ROW FOR 24945(04) $412,000 DIV. $412,000 GRADY 7 24945(07) CO RD 4.00 MI. FY 2012 UTILITIES CO RD FROM 0.5 MI NORTH OF I-44 NORTH TO SH-37 (MC-2686C) (SARA ROAD) UT FOR 24945(04) $309,000 DIV. $309,000 Friday, July 8, 2011 Page 8 of 63 5 YEAR CIRB WORK PLAN GRADY 7 26851(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER SALT CR, 1.7 MI NORTH & 2.0 MI EAST OF POCASSET $97,850 DIV. $489,250 GRADY 7 28341(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (NS-292) OVER EAST BITTER CREEK, 5.0 MILES EAST AND 3.3 MILES SOUTH OF AMBER PE FOR 28341(04) $46,350 DIV. $46,350 GRADY 7 28345(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-126) OVER A TRIBUTARY TO SALT CREEK, 8.5 MILES SOUTH AND 1.3 MILES EAST OF JCT US-81/SH-37 PE FOR 28245(04) $46,350 DIV. $46,350 GRANT 4 23655(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES COUNTY BRIDGE OVER SAND CREEK,4.0 MILES SOUTH AND 1.6 MILES EAST OF THE SH-11/SH-132 JCT. $103,000 DIV. $597,400 GRANT 4 24946(04) CO RD 5.00 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO RD EW-20, 3.3 MI. E. OF JEFFERSON AT NS-296, EXT. E. 5.0 MI. TO NS-301 (PHASE I) 5 BRS $4,017,000 DIV. $4,017,000 GRANT 4 24946(07) CO RD 11.00 MI. FY 2012 RIGHT OF WAY CO RD EW-20, 3.3 MI. E. OF JEFFERSON @ NS-196, EXT. E. 5.0 MI. TO NS-301 (PHASE I) RW FOR 24946(04) $10,300 DIV. $10,300 GRANT 4 24946(08) CO RD 11.00 MI. FY 2012 UTILITIES CO RD EW-20, 3.3 MI. E. OF JEFFERSON @ NS-196, EXT. E. 5.0 MI. TO NS-301 (PHASE I) UT FOR 24946(04) $10,300 DIV. $10,300 GRANT 4 25586(04) COBRGE 0.15 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER DEER CR., 2.3 MI. N. & 0.1 MI. E. OF DEER CREEK. $123,600 DIV. $545,900 GRANT 4 28360(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES ON NS-280 OVER SAND CREEK, 1.0 MILES EAST AND 2.9 MILES SOUTH OF JCT SH-11/SH-132 PE FOR 28360(04) CIRB FUNDS $48,410 DIV. $48,410 GRANT 4 28412(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING COUNTY BRIDGE ON EW-016 OVER POLECAT CREEK, 2.0 MILES SOUTH AND 5.2 MILES EAST OF JCT SH-11/US-81 PE FOR 28412(04) CIRB FUNDS $48,410 DIV. $48,410 GRANT 4 28418(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING COUNTY BRIDGE ON EW-09 OVER SAND CREEK, 5.0 MILES NORTH AND 0.4 MILES EAST OF JCT SH-11/SH-132 PE FOR 28418(04) $61,800 DIV. $61,800 GREER 5 24947(04) COBRGE 0.38 MI. FY 2012 BRIDGE & APPROACHES LOW WATER CROSSING OVER SALT FORK OF THE RED RIVER $2,420,500 DIV. $2,420,500 GREER 5 24947(06) COBRGE 0.38 MI. FY 2012 RIGHT OF WAY CO BR OVER SALT FORK OF THE RED RIVER RW FOR 24947(04) $10,558 DIV. $10,558 GREER 5 24947(07) COBRGE 0.38 MI. FY 2012 UTILITIES CO BR OVER SALT FORK OF THE RED RIVER UT. FOR 24947(04) $10,300 DIV. $10,300 GREER 5 24948(04) COBRGE 0.76 MI. FY 2012 BRIDGE & APPROACHES CO BR: OVER 2 UNNAMED CREEKS, 2.0 MI SOUTH OF GRANITE $643,750 DIV. $643,750 GREER 5 24948(07) COBRGE 0.76 MI. FY 2012 UTILITIES CO BR: OVER 2 UNNAMED CREEKS, 2.0 MI SOUTH OF GRANITE UT FOR 24948(04) $5,150 DIV. $5,150 GREER 5 26718(04) COBRGE 0.00 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER UNNAMED CREEK APPROX 9.0 MILE SOUTH & 0.4 MILE EAST OF GRANITE $72,100 DIV. $360,500 HARMON 5 24949(04) COBRGE 0.38 MI. FY 2012 BRIDGE & APPROACHES CO BR: OVER THE RED RIVER, 8.0 MI SOUTH & 3.0 MI WEST OF HOLLIS $2,717,269 DIV. $5,961,769 HARMON 5 24950(04) CO RD 1.30 MI. FY 2012 INTERSECT MODIF CO RD AT THE INTERSECTION OF EW 160 & NS 170, 1.0 MI WEST & 1.0 NORTH OF HOLLIS $852,840 DIV. $852,840 Friday, July 8, 2011 Page 9 of 63 5 YEAR CIRB WORK PLAN HARMON 5 28020(04) COBRGE 0.00 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER TURKEY CREEK APPROX 6.3 MILE NORTH & 1.1 MILE EAST OF GOULD $108,150 DIV. $396,550 HARPER 6 24964(05) COBRGE 0.38 MI. FY 2012 PRELIMINARY ENGINEERING CO BR: OVER BUFFALO CR, 0.5 MI WEST & 0.9 MI NORTH OF BUFFALO P.E FOR 24964(04) $92,700 DIV. $92,700 HARPER 6 25913(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO. BR OVER KIOWA CR., 4.8 MI. W. & 1.8 MI. N. OF LAVERNE $265,857 DIV. $741,600 HARPER 6 25914(04) CO RD 0.10 MI. FY 2012 RESURFACE CO RD: FROM EW-22/US-183, WEST 1.0 MI. TO NS-175, EXT NORTH 2.0 MI ON NS-175 TO EW-20, THEN EXT 1.0 MI EAST TO US-183 ON EW-20 $927,000 DIV. $1,442,000 HARPER 6 25915(04) CO RD 0.10 MI. FY 2012 RESURFACE CO RD: RESURFACE ON EW-21 FROM THE C/L EAST 5.0 MI TO NS-175 $927,000 DIV. $1,442,000 HASKELL 1 24965(04) COBRGE 1.50 MI. FY 2012 BRIDGE REHABILITATION CO. BR. ON NS-455 OVER SANS BOIS CR., AT KERR RESERVOIR, 2.5 MI. N. OF SH-9 AT KEOTA $1,648,000 DIV. $1,648,000 HASKELL 1 24966(04) COBRGE 0.47 MI. FY 2012 BRIDGE & APPROACHES CO BR ON NS-448 OVER SANS BOIS CR, 3.5 MI SOUTH & 4.5 MI EAST OF STIGLER $1,751,000 DIV. $1,751,000 HASKELL 1 24966(06) COBRGE 0.47 MI. FY 2012 RIGHT OF WAY CO BR ON NS-448 OVER SANS BOIS CR, 3.5 MI SOUTH & 4.5 MI EAST OF STIGLER ROW FOR 24966(04) $10,300 DIV. $10,300 HASKELL 1 24966(07) COBRGE 0.47 MI. FY 2012 UTILITIES CO BR ON NS-448 OVER SANS BOIS CR, 3.5 MI SOUTH & 4.5 MI EAST OF STIGLER UT FOR 24966(04) $10,300 DIV. $10,300 HASKELL 1 24967(05) CO RD 4.00 MI. FY 2012 PRELIMINARY ENGINEERING CO RD NS 447 ,BEGINNING APPROX. 3.5 MI EAST OF STIGLER AT SH. 9 AND EXTEND 4.0 MI NORTH TO GARLAND (TAMAHA RD PHASE 1) P.E. FOR 24967(04) $280,160 DIV. $280,160 HASKELL 1 25334(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER UNNAMED CR., 3.6 MI. S. AND 3.0 MI. W. OF SH-9/SH-2 JCT. IN WHITEFIELD. (DEL FR 10-10, ADD TO 04-11; FUNDING ISSUES) $78,280 DIV. $391,400 HASKELL 1 28411(06) CO RD 2.80 MI. FY 2012 RIGHT OF WAY CO. RD. EW1270 WEST LONA VALLEY RD. BEG. 2.0 MI W. & 4.0 MI N. OF KINTA,EXT 2.8 MI. EAST TO SH-2 (OVER UNNAMED CREEK) (R/W FOR 2841104) $66,950 DIV. $66,950 HASKELL 1 28411(07) CO RD 2.80 MI. FY 2012 UTILITIES CO. RD. EW1270 WEST LONA VALLEY RD. BEG. 2.0 MI W. & 4.0 MI N. OF KINTA,EXT 2.8 MI. EAST TO SH-2 (OVER UNNAMED CREEK) (UT FOR 2841104) $66,950 DIV. $66,950 HASKELL 1 28451(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR ON EW1220 OVER TRIB. OF OTTER CK 0.7 MI SOUTH & 0.7 MI WEST OF KEOTA $257,500 DIV. $683,920 HASKELL 1 28499(05) CO RD 6.50 MI. FY 2012 PRELIMINARY ENGINEERING CO RD NS 4580 & EW 1175 BEGINNING 3.0 MI EAST OF KEOTA AT SH 9 EXTEND NORTH 3.5 MI THEN 3.0 MI EAST. (STAR ROAD) PE FOR 28499(04) $206,000 DIV. $206,000 HUGHES 3 27797(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER CANEY BOGGY CREEK APPROX 7.3 MILE SOUTH & 3.5 MILE WEST OF STUART $530,450 DIV. $735,110 JACKSON 5 24970(04) COBRGE 1.14 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO BR OVER 3 UNNAMED CREEKS ALONG MC 3386C, FROM SH-5 NORTH TO US-62 $2,729,500 DIV. $2,729,500 JACKSON 5 26627(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO BR: OVER AN UNNAMED CR, 5.0 MI SOUTH & 4.6 MI EAST IF ALTUS ON EW-169 $82,400 DIV. $412,000 JACKSON 5 26627(06) COBRGE 0.10 MI. FY 2012 RIGHT OF WAY CO BR: OVER AN UNNAMED CR, 5.0 MI SOUTH & 4.6 MI EAST IF ALTUS ON EW-169 (ROW FOR 26627(04)) $5,150 DIV. $5,150 Friday, July 8, 2011 Page 10 of 63 5 YEAR CIRB WORK PLAN JACKSON 5 28021(08) COBRGE 0.00 MI. FY 2012 PRELIMINARY ENGINEERING CO BR OVER BITTER CREEK APPROX 5.5 MILE NORTH & 2.0 MILE WEST OF ALTUS (PE FOR 28021(04)) $24,786 DIV. $24,786 JACKSON 5 28723(04) COBRGE 9.00 MI. FY 2012 GRADE, DRAIN & SURFACE GRADE, DRAIN AND SURFACE ON NS-210 FROM HWY 5 NORTH TO HWY 62 FOR 9 MI. $2,729,500 DIV. $2,729,500 JEFFERSON 7 24971(04) CO RD 5.00 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD FROM 4.0 MI NORTH & 4.0 MI WEST OF RYAN, EXT NORTH TO US-70 $3,695,640 DIV. $3,695,640 JEFFERSON 7 27474(04) COBRGE 0.30 MI. FY 2012 BRIDGE & APPROACHES CO RD(EW-190 OVER MUD & COTTONWOOD CREEK APPROX 6.0 MILE NORTH & 0.7 MILE WEST OF JCT US-70/SH-89 IN RINGLING $172,216 DIV. $861,080 JEFFERSON 7 27474(06) COBRGE 0.30 MI. FY 2012 RIGHT OF WAY CO RD(EW-190 OVER MUD & COTTONWOOD CREEK APPROX 6.0 MILE NORTH & 0.7 MILE WEST OF JCT US-70/SH-89 IN RINGLING (RW FOR 27474(04)) $5,150 DIV. $5,150 JEFFERSON 7 27474(07) COBRGE 0.30 MI. FY 2012 UTILITIES CO RD(EW-190 OVER MUD & COTTONWOOD CREEK APPROX 6.0 MILE NORTH & 0.7 MILE WEST OF JCT US-70/SH-89 IN RINGLING (UT FOR 27474(04)) $10,300 DIV. $10,300 JEFFERSON 7 28375(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-207) OVER FROG CREEK, 0.5 MILES SOUTH AND 2.1 MILES EAST OF RYAN PE FOR 28375(04) $42,654 DIV. $42,654 JOHNSTON 3 22995(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR.: AND APPR. OVER TRIB. TO SANDY CR., 2.4 MI. N. AND 0.3 MI. W. OF COLEMAN $10,300 DIV. $172,871 KAY 4 22953(04) CO RD 3.00 MI. FY 2012 RESURFACE CO RD(NS-331)(WAVERLY RD) BEG @ EW-20.5 & EXT NORTH APPROX 1.6 MILE TO EW-18(HUBBARD RD); EXT EAST ON EW-18(HUBBARD RD) APPROX 0.1 MILE.(PHASE 1) $1,895,200 DIV. $2,925,200 KAY 4 22953(06) CO RD 3.00 MI. FY 2012 RIGHT OF WAY CO. RD.: ON NS-331 FROM EW-19.5 NORTH 1.5 MI TO EW-18, THEN EAST ON EW-18 2.1 MI. TO US-77. (NW OF PONCA CITY) ROW FOR 22953(04) $103,000 DIV. $103,000 KAY 4 22953(07) CO RD 3.60 MI. FY 2012 UTILITIES CO. RD.: ON NS-331 FROM EW-19.5 NORTH 1.5 MI TO EW-18, THEN EAST ON EW-18 2.1 MI. TO US-77. (NW OF PONCA CITY) UT FOR 22953(04) $126,587 DIV. $126,587 KAY 4 22953(09) CO RD 3.00 MI. FY 2012 RESURFACE CO RD EW-18(HUBBARD RD) BEG APPROX 0.1 MILE EAST OF NS-331(WAVERLY RD) & EXT EAST APPROX 1.9 MILE TO US-77. $4,120,000 DIV. $4,120,000 KAY 4 25084(06) COBRGE 0.38 MI. FY 2012 RIGHT OF WAY CO BR OVER DEER CR, 5.6 MI WEST & 4.3 MI SOUTH OF THE SH11/I-35 JCT ROW FOR 25084(04) $3,322 DIV. $3,322 KAY 4 28433(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING COUNTY BRIDGE ON EW-18 OVER BOIS D'ARC CREEK, 4.0 MILES SOUTH AND 3.5 MILES WEST OF KILDARE CN 103 PE FOR 28433(04) $46,350 DIV. $46,350 KAY 4 28434(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING COUNTY BRIDGE ON EW-03 OVER BEAVER CREEK, 0.2 MILES SOUTH AND 0.2 MILES WEST OF HARDY PE FOR 28434(04) CIRB ENG/BIA CONST $57,680 DIV. $57,680 KINGFISHER 4 25086(04) COBRGE 1.60 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO BR OVER UNCLE JOHN CR, 2.5 MI SOUTH & 0.6 MI EAST OF US-81/SH-33 $2,060,000 DIV. $2,060,000 KINGFISHER 4 25086(06) COBRGE 1.60 MI. FY 2012 RIGHT OF WAY CO BR OVER UNCLE JOHN CR, 2.5 MI SOUTH & 0.6 MI EAST OF US-81/SH-33 ROW FOR 25086(04) $66,435 DIV. $66,435 KINGFISHER 4 25086(07) COBRGE 1.60 MI. FY 2012 UTILITIES CO BR OVER UNCLE JOHN CR, 2.5 MI SOUTH & 0.6 MI EAST OF US-81/SH-33 UT FOR 25086(04) $166,088 DIV. $166,088 KINGFISHER 4 27391(04) COBRGE 0.18 MI. FY 2012 BRIDGE & APPROACHES CO BR ON NS-294 (REEDING RD) OVER CAMPBELL CREEK 4.9 MI WEST & 0.1 MI NORTH OF CASHION $206,000 DIV. $1,030,000 Friday, July 8, 2011 Page 11 of 63 5 YEAR CIRB WORK PLAN KINGFISHER 4 28361(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES ON EW-66 OVER TURKEY CREEK, 4.0 SOUTH AND 2.0 MILES WEST OF JCT SH-51/US-81 PE FOR 28361(04) CIRB FUNDS $48,410 DIV. $48,410 KINGFISHER 4 28435(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING COUNTY BRIDGE ON EW-84 OVER DEAD INDIAN CREEK, 4.0 MILES WEST, 5.0 MILES NORTH AND 0.5 MILES EAST OF OKARCHE PE FOR 28434(04) CIRB FUNDS $48,410 DIV. $48,410 KIOWA 5 25094(04) CO RD 0.00 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO. RD.(EW-160) BEG AT US-183 & EXT WEST APPROX. 4.0 MILE TO CO. RD(NS-220) $2,662,550 DIV. $2,662,550 KIOWA 5 25094(07) CO RD 0.00 MI. FY 2012 UTILITIES CO. RD.(EW-160) BEG AT US-183 & EXT WEST APPROX. 4.0 MILE TO CO. RD(NS-220) (UT FOR 25094(04)) $10,300 DIV. $10,300 KIOWA 5 26972(04) COBRGE 0.01 MI. FY 2012 BRIDGE & APPROACHES REPLACE LOW WATER CROSSING W/BRIDGE OVER EAST OTTER CREEK 3 MI NORTH & 0.1 MI WEST OF US-62/US-183 $15,450 DIV. $77,250 KIOWA 5 26972(06) COBRGE 0.01 MI. FY 2012 RIGHT OF WAY REPLACE LOW WATER CROSSING W/BRIDGE OVER EAST OTTER CREEK 3 MI NORTH & 0.1 MI WEST OF US-62/US-183 (ROW FOR 26972(04)) $5,150 DIV. $5,150 KIOWA 5 26972(07) COBRGE 0.01 MI. FY 2012 UTILITIES REPLACE LOW WATER CROSSING W/BRIDGE OVER EAST OTTER CREEK 3 MI NORTH & 0.1 MI WEST OF US-62/US-183 (UT FOR 26972(04)) $5,150 DIV. $5,150 LATIMER 2 25095(05) CO RD 4.00 MI. FY 2012 PRELIMINARY ENGINEERING CO. RD.(EW-159) BEG APPROX. 4.0 MILE WEST OF SH-2 & EXT EAST 4.0 MILE (PE FOR 2095(04)) $166,088 DIV. $166,088 LATIMER 2 25095(06) CO RD 4.00 MI. FY 2012 RIGHT OF WAY CO. RD.(EW-159) BEG APPROX. 4.0 MILE WEST OF SH-2 & EXT EAST 4.0 MILE (RW FOR 2095(04)) $37,389 DIV. $37,389 LATIMER 2 25095(07) CO RD 4.00 MI. FY 2012 UTILITIES CO. RD.(EW-159) BEG APPROX. 4.0 MILE WEST OF SH-2 & EXT EAST 4.0 MILE (UT FOR 2095(04)) $309,000 DIV. $309,000 LATIMER 2 26298(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER CROOKED CR., 1.1 MI. S. & 1.8 MI. E. OF SH-63 $103,000 DIV. $309,000 LATIMER 2 26298(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO. BR. OVER CROOKED CR., 1.1 MI. S. & 1.8 MI. E. OF SH-63 R/W FOR 2629804 $5,150 DIV. $5,150 LATIMER 2 26298(07) COBRGE 0.20 MI. FY 2012 UTILITIES CO. BR. OVER CROOKED CR., 1.1 MI. S. & 1.8 MI. E. OF SH-63 UT FOR 2629804 $5,150 DIV. $5,150 LATIMER 2 28609(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES FOURCHE MALINE CREEK ON NS-345.5, 3.1 MILES WEST AND 0.6 MILE SOUTH OF PANOLA $43,775 DIV. $43,775 LATIMER 2 28610(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER TRIBUTARY TO FOURCHE MALINE CREEK ON NS-435.5, 3.1 MILES WEST AND 0.4 MILE SOUTH OF PANOLA (PE FOR 2861004) $39,655 DIV. $39,655 LATIMER 2 28611(05) CO RD 4.00 MI. FY 2012 PRELIMINARY ENGINEERING RECONSTRUCT CRAVENS ROAD (EW-146) FROM 4.0 MILES SOUTH OF RED OAK AT JCT OF SH 82 EXTEND WEST 4.0 MILES (PE FOR 2861104) $103,000 DIV. $103,000 LATIMER 2 28612(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER BEAVER CREEK, LOCATED 1.2 MILES EAST OF CHILLI (PE FOR 286104) $30,900 DIV. $30,900 LATIMER 2 28613(05) COBRGE 0.35 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER WEST FORK CREEK ON EW-158, LOCATED 5.6 MILE WEST AND 0.3 MILE WEST OF YANUSH (PE FOR 2861304) $36,050 DIV. $36,050 LATIMER 2 28614(04) CO RD 1.00 MI. FY 2012 WIDEN & RESURFACE RECONSTRUCT CRAVENS ROAD (EW-146) FROM 4.0 MILES SOUTH AND 9.0 MILES WEST OF RED OAK EXTENDING EAST 1.0 MILES $103,000 DIV. $618,000 Friday, July 8, 2011 Page 12 of 63 5 YEAR CIRB WORK PLAN LATIMER 2 28614(05) CO RD 1.00 MI. FY 2012 PRELIMINARY ENGINEERING RECONSTRUCT CRAVENS ROAD (EW-146) FROM 4.0 MILES SOUTH AND 9.0 MILES WEST OF RED OAK EXTENDING EAST 1.0 MILES (PE FOR 2861404) $39,140 DIV. $39,140 LATIMER 2 28614(06) CO RD 1.00 MI. FY 2012 RIGHT OF WAY RECONSTRUCT CRAVENS ROAD (EW-146) FROM 4.0 MILES SOUTH AND 9.0 MILES WEST OF RED OAK EXTENDING EAST 1.0 MILES (RW FOR 2861404) $5,150 DIV. $5,150 LATIMER 2 28614(07) CO RD 1.00 MI. FY 2012 UTILITIES RECONSTRUCT CRAVENS ROAD (EW-146) FROM 4.0 MILES SOUTH AND 9.0 MILES WEST OF RED OAK EXTENDING EAST 1.0 MILES (UT FOR 2861404) $10,300 DIV. $10,300 LATIMER 2 28615(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER LITTLE BUFFALO CREEK ON NS-439, LOCATED 5.5 MILES EAST AND 1.4 MILES NORTH OF YANUSH (PE FOR 2861504) $25,750 DIV. $25,750 LEFLORE 2 22885(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR.: AND APPR. OVER BLACK FORK CR., APPROX 0.5 MI. E. OF HODGENS $1,648,000 DIV. $1,648,000 LEFLORE 2 22885(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO. BR.: AND APPR. OVER BLACK FORK CR., APPROX 0.5 MI. E. OF HODGENS (RW FOR 22885(04)) $19,997 DIV. $19,997 LEFLORE 2 25096(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES CO. RD(EW-142) OVER CASTON CREEK APPROX. 0.7 MILE WEST & 0.5 MILE SOUTH OF JCT OF US-270/US-59 $1,854,000 DIV. $1,854,000 LEFLORE 2 25096(06) COBRGE 0.25 MI. FY 2012 RIGHT OF WAY CO. RD(EW-142) OVER CASTON CREEK APPROX. 0.7 MILE WEST & 0.5 MILE SOUTH OF JCT OF US-270/US-59 (RW FOR 25096(04)) $10,300 DIV. $10,300 LEFLORE 2 25096(07) COBRGE 0.25 MI. FY 2012 UTILITIES CO. RD(EW-142) OVER CASTON CREEK APPROX. 0.7 MILE WEST & 0.5 MILE SOUTH OF JCT OF US-270/US-59 (UT FOR 25096(04)) $10,300 DIV. $10,300 LEFLORE 2 25097(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES CO. RD(NS-457.5) OVER BRAZIL CREEK APPROX. 4.0 MILE SOUTH OF SH-31. $1,442,000 DIV. $1,442,000 LEFLORE 2 25097(06) COBRGE 0.25 MI. FY 2012 RIGHT OF WAY CO. RD(NS-457.5) OVER BRAZIL CREEK APPROX. 4.0 MILE SOUTH OF SH-31. (RW FOR 25097(04)) $10,300 DIV. $10,300 LEFLORE 2 25097(07) COBRGE 0.25 MI. FY 2012 UTILITIES CO. RD(NS-457.5) OVER BRAZIL CREEK APPROX. 4.0 MILE SOUTH OF SH-31. (UT FOR 25097(04)) $10,300 DIV. $10,300 LEFLORE 2 25101(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES CO. RD(NS-480) OVER THE POTEAU RIVER APPROX. 1.0 MILE NORTH OF LOVING $1,545,000 DIV. $1,545,000 LEFLORE 2 25101(06) COBRGE 0.00 MI. FY 2012 RIGHT OF WAY CO. RD(NS-480) OVER THE POTEAU RIVER APPROX. 1.0 MILE NORTH OF LOVING (RW FOR 25101(04)) $22,660 DIV. $22,660 LEFLORE 2 25101(07) COBRGE 0.00 MI. FY 2012 UTILITIES CO. RD(NS-480) OVER THE POTEAU RIVER APPROX. 1.0 MILE NORTH OF LOVING (UT FOR 25101(04)) $30,900 DIV. $30,900 LEFLORE 2 26896(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER TRIB OF BUZZARD CREEK APPROX 2.5 MILE EAST & 0.9 MILE SOUTH OF TALIHINA. $36,050 DIV. $36,050 LEFLORE 2 26903(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER BUZZARD CREEK APPROX 3.0 MILE EAST & 0.9 MILE SOUTH OF TALAHINA $463,500 DIV. $463,500 LEFLORE 2 26904(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER UNNAMED CREEK APPROX 3.0 MILE SOUTH & 1.3 MILE WEST OF POCOLA $51,500 DIV. $298,700 LEFLORE 2 26905(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER UNNAMED CREEK APPROX 4.0 MILE SOUTH & 1.7 MILE WEST OF POCOLA $72,100 DIV. $319,300 Friday, July 8, 2011 Page 13 of 63 5 YEAR CIRB WORK PLAN LEFLORE 2 26905(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO BR OVER UNNAMED CREEK APPROX 4.0 MILE SOUTH & 1.7 MILE WEST OF POCOLA (RW FOR 26905(04)) $5,150 DIV. $5,150 LEFLORE 2 26905(07) COBRGE 0.20 MI. FY 2012 UTILITIES CO BR OVER UNNAMED CREEK APPROX 4.0 MILE SOUTH & 1.7 MILE WEST OF POCOLA (UT FOR 26905(04)) $10,300 DIV. $10,300 LEFLORE 2 28616(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER BIG CREEK, LOCATED 0.6 MILES WEST OF HICKS PE FOR 2861604 $30,900 DIV. $30,900 LEFLORE 2 28617(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 2.2 MILES NORTH AND 0.8 MILE WEST OF HICKS PE FOR 2861704 $25,750 DIV. $25,750 LINCOLN 3 25087(04) CO RD 5.50 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO RD FR 3.8 MI SOUTH & 2.0 MI EAST OF CARNEY, EXT EAST & SOUTH TO SH-18 $3,986,100 DIV. $3,986,100 LOGAN 4 23017(04) COBRGE 0.12 MI. FY 2012 BRIDGE & APPROACHES CO. BR.: AND APPR OVER OTTER CR., 3 MI. S. AND 1.4 MI. E. OF SH-74/SH-51 $248,601 DIV. $745,802 LOGAN 4 25089(04) CO RD 5.00 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD: FR 1.5 MI WEST OF I-35 ON WATERLOO ROAD NORTH ON COLTRANE 5.0 MI PHASE I $2,120,000 DIV. $2,120,000 LOGAN 4 25089(05) CO RD 5.00 MI. FY 2012 PRELIMINARY ENGINEERING CO RD: FR 1.5 MI WEST OF I-35 ON WATERLOO ROAD NORTH ON COLTRANE 5.0 MI ( PE FOR 25089(04) $87,584 DIV. $87,584 LOGAN 4 25089(06) CO RD 5.00 MI. FY 2012 RIGHT OF WAY CO RD: FR 1.5 MI WEST OF I-35 ON WATERLOO ROAD NORTH ON COLTRANE 5.0 MI ( ROW FOR 25089(04) $772,500 DIV. $772,500 LOGAN 4 25089(07) CO RD 5.00 MI. FY 2012 UTILITIES CO RD: FR 1.5 MI WEST OF I-35 ON WATERLOO ROAD NORTH ON COLTRANE 5.0 MI ( UT FOR 25089(04) $1,030,000 DIV. $1,030,000 LOGAN 4 25090(05) COBRGE 0.38 MI. FY 2012 PRELIMINARY ENGINEERING CO BR OVER SKELETON CR, 2.0 MI WEST & 1.3 MI SOUTH OF SH-51/SH-74E PE FOR 25090(04) $92,700 DIV. $92,700 LOGAN 4 28686(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING CO BR ON EW-69 OVER SKELETON CREEK, 7.0 SOUTH AND 5.3 EAST OF JCT SH-51/SH-74 PE FOR 28686(04) $51,500 DIV. $51,500 LOGAN 4 28726(05) CO RD 3.00 MI. FY 2012 PRELIMINARY ENGINEERING CHARTER OAK PE FOR 28726(04) $36,050 DIV. $36,050 LOVE 7 25091(04) CO RD 4.50 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO RD: FR I-35 WEST 4.5 MI ON MC4304, INCLUDES BR OVER SOUTH BRANCH HICKORY CR & AN UNNAMED CR $4,294,070 DIV. $4,294,070 LOVE 7 25091(06) CO RD 4.50 MI. FY 2012 RIGHT OF WAY CO RD: FR I-35 WEST 4.5 MI ON MC4304, INCLUDES BR OVER SOUTH BRANCH HICKORY CR & AN UNNAMED CR (ROW FOR 25091(04) $128,750 DIV. $128,750 LOVE 7 25091(07) CO RD 4.50 MI. FY 2012 UTILITIES CO RD: FR I-35 WEST 4.5 MI ON MC4304, INCLUDES BR OVER SOUTH BRANCH HICKORY CR & AN UNNAMED CR (UT FOR 25091(04) $257,500 DIV. $257,500 MAJOR 6 24615(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO RD(EW-48) OVER WEST BRANCH BARNEY CREEK APPROX 7.0 MILE SOUTH & 6.25 MILE EAST OF BOUSE JUNCTION, JCT OF US-412/US-281. $245,257 DIV. $515,000 MAJOR 6 25104(04) CO RD 6.00 MI. FY 2012 RESURFACE CO RD(EW-54) BEG 3.0 MILES EAST OF SH-58 & EXT EAST 6.0 MILE PHASE I $2,472,000 DIV. $2,472,000 MAJOR 6 25104(06) CO RD 9.00 MI. FY 2012 RIGHT OF WAY CO RD(EW-54) BEG @ SH-58 & EXT EAST 9.0 MILE (RW FOR 25104(04)(08)) $10,300 DIV. $10,300 Friday, July 8, 2011 Page 14 of 63 5 YEAR CIRB WORK PLAN MAJOR 6 25104(07) CO RD 9.00 MI. FY 2012 UTILITIES CO RD(EW-54) BEG @ SH-58 & EXT EAST 9.0 MILE (UT FOR 25104(04)(08)) $10,300 DIV. $10,300 MAJOR 6 25104(08) CO RD 3.00 MI. FY 2012 RESURFACE CO RD(EW-54) BEG @ SH-58 & EXT EAST 3.0 MILE PHASE II $1,030,000 DIV. $1,030,000 MAJOR 6 25831(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER EAGLE CR., 2.2 MI. N. OF CLEO SPRINGS OKLAHOMA. $375,950 DIV. $736,450 MAJOR 6 28353(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES ON NS-228 OVER CUDDY CREEK, 3.0 MILES WEST AND 5.1 MILES NORTH OF JCT US-412/US-281 PE FOR 28353(04) CIRB FUNDS $42,230 DIV. $42,230 MARSHALL 2 21097(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES COUNTY BRIDGE OVER CANEY CREEK, 1.7 MILES SOUTH AND 0.4 MILES WEST OF KINGSTON $309,000 DIV. $664,968 MARSHALL 2 21097(06) COBRGE 0.25 MI. FY 2012 RIGHT OF WAY COUNTY BRIDGE OVER CANEY CREEK, 1.7 MILES SOUTH AND 0.4 MILES WEST OF KINGSTON R/W FOR 2109704 $5,150 DIV. $5,150 MARSHALL 2 21097(07) COBRGE 0.25 MI. FY 2012 UTILITIES COUNTY BRIDGE OVER CANEY CREEK, 1.7 MILES SOUTH AND 0.4 MILES WEST OF KINGSTON UT FOR 2109704 $5,150 DIV. $5,150 MARSHALL 2 25105(07) CO RD 0.00 MI. FY 2012 RIGHT OF WAY (04)CORD(EW-200)(LINN RD) BEG 5 MI E OF SH-99 & EXT E & S 4.8 MI.(PHASE I) (05)CORD(LINN RD) BEG @ SH-99 & EXT E 5 MI (PHSE II)(RW FOR 25105(04)(05)) $11,781 DIV. $11,781 MARSHALL 2 25105(08) CO RD 0.00 MI. FY 2012 UTILITIES (04)CORD(EW-200)(LINN RD) BEG 5 MI E OF SH-99 & EXT E & S 3.9 MI.(PHASE I) (05)CORD(LINN RD) BEG @ SH-99 & EXT E 5 MI (PHSE II)(UT FOR 25105(04)(05)) $15,457 DIV. $15,457 MARSHALL 2 28618(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 2.5 MILES WEST AND 5.4 MILES SOUTH OF MADILL PE FOR 2861804 $41,200 DIV. $41,200 MARSHALL 2 28619(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 1.0 MILE NORTH OF TYLER PE FOR 2861904 $51,500 DIV. $51,500 MARSHALL 2 28620(05) CO RD 4.00 MI. FY 2012 PRELIMINARY ENGINEERING RECONSTRUCT SHAY CUT OFF ROAD (EW-212) FROM SH 99 ENTEND EAST 4.0 MILES PE FOR 2862004 $103,000 DIV. $103,000 MARSHALL 2 28622(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER UNNAMED CREEK ON NS-348, LOCATED 2.5 MILES WEST AND 3.6 MILES SOUTH OF MADILL PE FOR 2862204 $36,050 DIV. $36,050 MARSHALL 2 28623(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER UNNAMED CREEK ON EW-203, LOCATED 4.0 MILES WEST AND 1.5 MILE SOUTH OF MADILL PE FOR 2862304 $36,050 DIV. $36,050 MAYES 8 06549(04) CO RD 2.00 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD NS 432 BEGINNING AT SH 69A AND EXTENDING NORTH 2 MILES TO EW 51. $2,915,930 DIV. $2,915,930 MAYES 8 06549(06) CO RD 2.00 MI. FY 2012 RIGHT OF WAY CO. RD. NS 432, BEG. AT SH 69A AND EXTENDING NORTH 2 MILES TO EW 51 RW FOR 06549(04) $15,450 DIV. $15,450 MAYES 8 06549(07) CO RD 2.00 MI. FY 2012 UTILITIES CO. RD. NS 432, BEG. AT SH 69A AND EXTENDING NORTH 2 MILES TO EW 51 UT FOR 06549(04) $108,150 DIV. $108,150 MAYES 8 25416(06) COBRGE 0.00 MI. FY 2012 RIGHT OF WAY COUNTY ROAD(EW-50) OVER PRYOR CREEK APPROX 1.0 MILE WEST OF US-69 (RW FOR 25416(04)) $8,219 DIV. $8,219 MAYES 8 25416(07) COBRGE 0.00 MI. FY 2012 UTILITIES COUNTY ROAD(EW-50) OVER PRYOR CREEK APPROX 1.0 MILE WEST OF US-69 (UT FOR 25416(04)) $12,066 DIV. $12,066 Friday, July 8, 2011 Page 15 of 63 5 YEAR CIRB WORK PLAN MAYES 8 25417(04) CO RD 0.00 MI. FY 2012 GRADE, DRAIN & SURFACE CHIMNEY ROCK RD(EW-50) BEG @ SH-82 & EXT EAST 2.0 MILE $3,493,760 DIV. $4,523,760 MAYES 8 28497(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES OLD HWY 33(EW-590) OVER UP RAILROAD APPROX 0.3 MILE WEST OF US-69 $177,160 DIV. $491,310 MCCLAIN 3 25448(05) CO RD 0.00 MI. FY 2012 PRELIMINARY ENGINEERING CO RD: FROM US-77 EAST 3.0 MI (PHASE I) (4450C) P.E. FOR 25448(04) & (08) $298,700 DIV. $298,700 MCCLAIN 3 25448(06) CO RD 0.00 MI. FY 2012 RIGHT OF WAY CO RD: FROM US-77 EAST 3.0 MI (PHASE I) (4450C) ROW FOR 25448(04) & (08) $55,363 DIV. $55,363 MCCLAIN 3 25448(07) CO RD 0.00 MI. FY 2012 UTILITIES CO RD: FROM US-77 EAST 3.0 MI (PHASE I) (4450C) UT FOR 25448(04) & (08) $55,363 DIV. $55,363 MCCLAIN 3 25449(04) CO RD 0.00 MI. FY 2012 BRIDGE & APPROACHES CO RD: 3 LOCATIONS NEAR COLE, CURVE CORRECTIONS $1,158,195 DIV. $1,158,195 MCCLAIN 3 25449(06) CO RD 0.00 MI. FY 2012 RIGHT OF WAY CO RD: 3 LOCATIONS NEAR COLE, CURVE CORRECTIONS ROW FOR 25449(04) $54,075 DIV. $54,075 MCCLAIN 3 25449(07) CO RD 0.00 MI. FY 2012 UTILITIES CO RD: 3 LOCATIONS NEAR COLE, CURVE CORRECTIONS UT FOR 25449(04) $108,150 DIV. $108,150 MCCURTAIN 2 21778(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR.: OVER LUKFATA CREEK APPROX 1.4 MI. S. AND 1.2 MI. W. OF STEEL JUNCTION $103,000 DIV. $721,000 MCCURTAIN 2 25467(06) COBRGE 0.25 MI. FY 2012 RIGHT OF WAY CO BR: OVER LITTLE RIVER & TRIBUTARY, 2.6 MI NORTH OF IDABEL ROW FOR 25467(04) $15,836 DIV. $15,836 MCCURTAIN 2 25467(07) COBRGE 0.25 MI. FY 2012 UTILITIES CO BR: OVER LITTLE RIVER & TRIBUTARY, 2.6 MI NORTH OF IDABEL UT FOR 25467(04) $21,115 DIV. $21,115 MCCURTAIN 2 25468(04) COBRGE 0.40 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER YANUBBEE CR, 2.0 MI SOUTH & 1.5 MI EAST OF BROKEN BOW (4532C) $1,030,000 DIV. $1,030,000 MCCURTAIN 2 25468(06) COBRGE 0.40 MI. FY 2012 RIGHT OF WAY CO BR OVER YANUBBEE CR, 2.0 MI SOUTH & 1.5 MI EAST OF BROKEN BOW (4532C) ROW FOR 25468(04) $11,713 DIV. $11,713 MCCURTAIN 2 25468(07) COBRGE 0.40 MI. FY 2012 UTILITIES CO BR OVER YANUBBEE CR, 2.0 MI SOUTH & 1.5 MI EAST OF BROKEN BOW (4532C) UT FOR 25468(04) $10,815 DIV. $10,815 MCCURTAIN 2 25469(05) COBRGE 1.70 MI. FY 2012 PRELIMINARY ENGINEERING CO BR OVER LITTLE RIVER CR, 1.6 MI NORTH & 0.5 MI EAST OF GARVIN (4530C) PE FOR 25469(04) $93,009 DIV. $93,009 MCCURTAIN 2 25470(05) COBRGE 0.30 MI. FY 2012 PRELIMINARY ENGINEERING CO BR OVER GLOVER, GOLDEN & HOLLY CREEKS, 3.6 MI NORTH OF IDABEL PE FOR 25470(04) $42,230 DIV. $42,230 MCCURTAIN 2 25827(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER WATERHOLE CR., 0.5 MI. S. OF IRON STOB CORNER $283,250 DIV. $592,250 MCCURTAIN 2 25827(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO. BR. OVER WATERHOLE CR., 0.5 MI. S. OF IRON STOB CORNER R/W FOR 2582704 $5,150 DIV. $5,150 MCCURTAIN 2 25827(07) COBRGE 0.20 MI. FY 2012 UTILITIES CO. BR. OVER WATERHOLE CR., 0.5 MI. S. OF IRON STOB CORNER UT FOR 2582704 $5,150 DIV. $5,150 Friday, July 8, 2011 Page 16 of 63 5 YEAR CIRB WORK PLAN MCCURTAIN 2 25828(05) COBRGE 0.20 MI. FY 2012 PRELIMINARY ENGINEERING CO. BR. OVER BIG EAGLE CR., 1.6 MI. N. & 2.1 MI. W. OF SMITHVILLE (PE FOR 25828(04)) $36,050 DIV. $36,050 MCCURTAIN 2 28624(05) CO RD 5.00 MI. FY 2012 PRELIMINARY ENGINEERING RECONSTRUCT IRON STOBB (NS-455) FROM GLOVER EXTENDING SOUTH 4.7 MILES PE FOR 2862404 $82,400 DIV. $82,400 MCCURTAIN 2 28625(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER HOLLY CREEK (ROUTE 4530C), LOCATED 1.5 MILE WEST AND 0.5 MILE SOUTH OF BROKEN BOW PE FOR 2862504 $30,900 DIV. $30,900 MCINTOSH 1 20584(04) COBRGE 0.13 MI. FY 2012 BRIDGE & APPROACHES COUNTY BRIDGE ON NS 398 OVER MILL CREEK, SOUTH OF VERNON $257,500 DIV. $515,000 MCINTOSH 1 22223(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO.BR. OVER TRIB TO MILL CREEK, 1.0 KILE NORTH AND 7.9 MILES EAST OF HANNA $309,000 DIV. $527,360 MCINTOSH 1 23511(04) COBRGE 0.25 MI. FY 2012 BRIDGE REHABILITATION CO. RD(EW-114) OVER DUCHESS APPROX. 0.5 MILE WEST OF PORUM LANDING $3,399,000 DIV. $3,399,000 MCINTOSH 1 23511(07) COBRGE 0.25 MI. FY 2012 UTILITIES CO. RD(EW-114) OVER DUCHESS APPROX. 0.5 MILE WEST OF PORUM LANDING (UT FOR 23511(04)) $1,030 DIV. $1,030 MCINTOSH 1 25102(04) COBRGE 1.00 MI. FY 2012 BRIDGE REHABILITATION CO. BR. ON NS-410 OVER LAKE EUFAULA, 3.0 MI. S. & 0.7 MI E. OF VIVIAN $1,133,000 DIV. $1,133,000 MCINTOSH 1 25103(06) CO RD 3.80 MI. FY 2012 RIGHT OF WAY CO. RD(EW103) BEG @ OLD US-69(NS421) & EXT EAST 2.0 MI., NORTH 1.0 MI. (NS423), EAST 0.2MI.(EW102), NORTH 0.6MI,(NS4232). (RW FOR 25103(04)) $77,250 DIV. $77,250 MCINTOSH 1 25103(07) CO RD 3.80 MI. FY 2012 UTILITIES CO. RD(EW103) BEG @ OLD US-69(NS421) & EXT EAST 2.0 MI., NORTH 1.0 MI. (NS423), EAST 0.2MI.(EW102), NORTH 0.6MI,(NS4232). (UT FOR 25103(04)) $77,250 DIV. $77,250 MURRAY 7 22688(04) COBRGE 0.21 MI. FY 2012 BRIDGE & APPROACHES CO BR.: REPLACE EXISTING LOW-WATER CROSSING OVER LOWRANCE CR., 3.9 MI. S. AND 0.4 MI. E. OF THE S. JCT. OF US-177/SH-7 $72,100 DIV. $360,500 MURRAY 7 22688(06) COBRGE 0.21 MI. FY 2012 RIGHT OF WAY CO BR.: REPLACE EXISTING LOW-WATER CROSSING OVER LOWRANCE CR., 3.9 MI. S. AND 0.4 MI. E. OF THE S. JCT. OF US-177/SH-7 (RW FOR: 22688 (04)) $5,150 DIV. $5,150 MURRAY 7 22688(07) COBRGE 0.21 MI. FY 2012 UTILITIES CO BR.: REPLACE EXISTING LOW-WATER CROSSING OVER LOWRANCE CR., 3.9 MI. S. AND 0.4 MI. E. OF THE S. JCT. OF US-177/SH-7 (UT FOR: 22688 (04)) $5,150 DIV. $5,150 MURRAY 7 25418(04) CO RD 0.00 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE COUNTY ROAD(EW-175) UNDER RR & OVER DRY SANDY CREEK APPROX. 2.0 MILE SOUTH OF DAVIS $5,873,060 DIV. $5,873,060 MURRAY 7 25418(06) CO RD 0.00 MI. FY 2012 RIGHT OF WAY COUNTY ROAD(EW-175) UNDER RR & OVER DRY SANDY CREEK APPROX. 2.0 MILE SOUTH OF DAVIS (RW FOR 25418(04)) $1,030,000 DIV. $1,030,000 MURRAY 7 25418(07) CO RD 0.00 MI. FY 2012 UTILITIES COUNTY ROAD(EW-175) UNDER RR & OVER DRY SANDY CREEK APPROX. 2.0 MILE SOUTH OF DAVIS (UT FOR 25418(04)) $515,000 DIV. $515,000 MURRAY 7 28422(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES BRIDGE AND APPROACHES (EW-170) OVER MILL CREEK, 0.5 MILES SOUTH AND AND 1.0 MILE WEST OF HICKORY $82,400 DIV. $412,000 MURRAY 7 28422(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-170) OVER MILL CREEK, 0.5 MILES SOUTH AND AND 1.0 MILE WEST OF HICKORY PE FOR 28422(04) $46,350 DIV. $46,350 MURRAY 7 28422(06) COBRGE 0.25 MI. FY 2012 RIGHT OF WAY BRIDGE AND APPROACHES (EW-170) OVER MILL CREEK, 0.5 MILES SOUTH AND AND 1.0 MILE WEST OF HICKORY ROW FOR 28422(04) $5,150 DIV. $5,150 Friday, July 8, 2011 Page 17 of 63 5 YEAR CIRB WORK PLAN MURRAY 7 28422(07) COBRGE 0.25 MI. FY 2012 UTILITIES BRIDGE AND APPROACHES (EW-170) OVER MILL CREEK, 0.5 MILES SOUTH AND AND 1.0 MILE WEST OF HICKORY UT FOR 28422(04) $10,300 DIV. $10,300 MURRAY 7 28427(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-167) OVER ROCK CREEK, 1.5 MILES SOUTH AND 1.7 MILES EAST OF OAK GROVE PE FOR 28427(04) $46,350 DIV. $46,350 MURRAY 7 28440(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW178) OVER BRANCH CREEK, 2.5 MILES NORTH AND 0.6 MILES WEST OF DRAKE PE FOR 28440(04) $51,500 DIV. $51,500 MUSKOGEE 1 20506(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES COUNTY BRIDGE ON EW-95 OVER CLOUD CREEK, 0.7 MILES SOUTH AND 0.7 MILES EAST OF BOYNTON $154,500 DIV. $515,000 MUSKOGEE 1 25419(04) COBRGE 0.50 MI. FY 2012 BRIDGE & APPROACHES CO BR ON EW-83.5 (R.R. RD) OVER GRAND RIVER, 0.5 MI. N. & 0.6 MI. W. OF FORT GIBSON. $5,768,000 DIV. $5,768,000 MUSKOGEE 1 25419(06) COBRGE 0.50 MI. FY 2012 RIGHT OF WAY CO BR ON EW-83.5 (R.R. RD.) OVER GRAND RIVER, 0.5 M. N. & 0.6 MI. W. OF FORT GIBSON. (RW FOR 25419(04)) $25,750 DIV. $25,750 MUSKOGEE 1 25419(07) COBRGE 0.50 MI. FY 2012 UTILITIES CO BR ON EW-83.5 (R.R. RD.) OVER GRAND RIVER, 0.5 MI. N. & 0.6 MI. W. OF FORT GIBSON. (UT FOR 25419(04)) $77,250 DIV. $77,250 MUSKOGEE 1 25420(05) COBRGE 0.50 MI. FY 2012 PRELIMINARY ENGINEERING CO RD(EW-87) OVER PECAN CREEK APPROX. 0.5 MILE SOUTH & 3.0 MILE EAST OF TAFT (PE FOR 25420(04)) $103,000 DIV. $103,000 MUSKOGEE 1 25420(06) COBRGE 0.50 MI. FY 2012 RIGHT OF WAY CO RD(EW-87) OVER PECAN CREEK APPROX. 0.5 MILE SOUTH & 3.0 MILE EAST OF TAFT (RW FOR 25420(04)) $51,500 DIV. $51,500 MUSKOGEE 1 25420(07) COBRGE 0.50 MI. FY 2012 UTILITIES CO RD(EW-87) OVER PECAN CREEK APPROX. 0.5 MILE SOUTH & 3.0 MILE EAST OF TAFT (UT FOR 25420(04)) $51,500 DIV. $51,500 MUSKOGEE 1 27425(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER SOUTH FORK ON EW 110 4.5 MI NORTH & 2.5 MI EAST OF PORUM $257,500 DIV. $1,030,000 NOBLE 4 22352(04) COBRGE 0.21 MI. FY 2012 BRIDGE & APPROACHES BRIDGES AND APPR. OVER EAST WARREN CR., 0.7 MI. E. & 0.8 MI. N. LUCIEN. $91,593 DIV. $457,968 NOBLE 4 23651(04) COBRGE 0.12 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO. RD. NS-318, OVER RED ROCK CR., 3.0 MI. W. AND 0.3 MI. S. OF CERES $103,000 DIV. $515,000 NOBLE 4 25421(04) CO RD 6.00 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD(NS-327)(RED ROCK ROAD) BEG APPROX 6.0 MILE WEST OF US-64/US-177 JCT & EXT NORTH APPROX 6.0 MILE TO EW-44 (5254C) $3,090,000 DIV. $4,120,000 NOBLE 4 25421(07) CO RD 0.00 MI. FY 2012 UTILITIES CO RD(NS-327) BETWEEN SH-15 & US-64 (5254C) (UT FOR 25421(04)(05)) $10,300 DIV. $10,300 NOBLE 4 25421(08) CO RD 0.00 MI. FY 2012 RIGHT OF WAY CO RD(NS-327) BETWEEN SH-15 & US-64 (5254C) (RW FOR 25421(04)(05)) $10,300 DIV. $10,300 NOBLE 4 25422(07) CO RD 0.00 MI. FY 2012 RIGHT OF WAY (04)CORD(NS-312) BEG APPROX 4.5 MI N OF US-412 & EXT N APPROX 5 MI TO SH-15 (PHASE 1); RW FOR 25422(04) $10,300 DIV. $10,300 NOBLE 4 25422(08) CO RD 0.00 MI. FY 2012 UTILITIES (04)CORD(NS-312) BEG APPROX 4.5 MI N OF US-412 & EXT N APPROX 5 MI TO SH-15 (PHASE 1); UT FOR 25422(04) $10,300 DIV. $10,300 NOBLE 4 27720(06) COBRGE 0.10 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE & APPROACHES ON CO RD EW-35 OVER GRASSY CREEK 0.1 MI WEST & 2 MI SOUTH OF I-35/SH-15 JCT PE FOR 27720(04) CIRB FUNDS $51,500 DIV. $51,500 Friday, July 8, 2011 Page 18 of 63 5 YEAR CIRB WORK PLAN NOBLE 4 28362(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES ON EW-47 OVER COW CREEK, 2.2 MILES EAST, 3.0 MILES NORTH AND 0.7 MILES EAST OF JCT US-64/US-77 PE FOR 28362(04) CIRB FUNDS $51,500 DIV. $51,500 NOWATA 8 25423(04) COBRGE 0.00 MI. FY 2012 BRIDGE & APPROACHES CO RD(EW-15) OVER CALIFORNIA CREEK APPROX. 1.5 MILE WEST & 1.0 MILE NORTH OF DELAWARE. (REPLACE LOW WATER CROSSING) $1,007,340 DIV. $1,007,340 NOWATA 8 27814(05) COBRGE FY 2012 PRELIMINARY ENGINEERING CO BR OVER CURL CREEK ON NS 406 APPX 8.0 MILES WEST OF NOWATA PE FOR (04) $61,800 DIV. $61,800 NOWATA 8 27815(05) COBRGE FY 2012 PRELIMINARY ENGINEERING CO BR OVER PURGATORY CREEK ON NS 406 APPX 8.5 MILE SOUTHWEST OF NOWATA PE FOR (04) $51,500 DIV. $51,500 NOWATA 8 27815(06) COBRGE FY 2012 RIGHT OF WAY CO BR OVER PURGATORY CREEK ON NS 406 APPX 8.5 MILE SOUTHWEST OF NOWATA RW FOR (04) $10,300 DIV. $10,300 NOWATA 8 27815(07) COBRGE FY 2012 UTILITIES CO BR OVER PURGATORY CREEK ON NS 406 APPX 8.5 MILE SOUTHWEST OF NOWATA UTILITY FOR (04) $31,930 DIV. $31,930 NOWATA 8 27816(04) COBRGE FY 2012 BRIDGE & APPROACHES CO BR OVER UNNAMED CREEK (LWX) ON NS 406 $1,030,000 DIV. $1,030,000 NOWATA 8 27816(06) COBRGE FY 2012 RIGHT OF WAY CO BR OVER UNNAMED CREEK (LWX) ON NS 406 RW FOR (04) $5,150 DIV. $5,150 NOWATA 8 27816(07) COBRGE FY 2012 UTILITIES CO BR OVER UNNAMED CREEK (LWX) ON NS 406 RW FOR (04) $15,450 DIV. $15,450 NOWATA 8 27817(05) COBRGE FY 2012 PRELIMINARY ENGINEERING CO BR OVER OPOSSUM CREEK ON NS 410 APPX 9.0 MILE NORTHWEST OF NOWATA PE FOR (04) $51,500 DIV. $51,500 NOWATA 8 27818(05) COBRGE FY 2012 PRELIMINARY ENGINEERING CO BR OVER OPOSSUM CREEK ON NS 413 (OLD HWY 169) APPX 7.5 MILE NORTH OF SH- 10. PE FOR (04) $123,600 DIV. $123,600 NOWATA 8 27818(06) COBRGE FY 2012 RIGHT OF WAY CO BR OVER OPOSSUM CREEK ON NS 413 (OLD HWY 169) APPX 7.5 MILE NORTH OF SH- 10. RW FOR (04) $30,900 DIV. $30,900 NOWATA 8 27818(07) COBRGE FY 2012 UTILITIES CO BR OVER OPOSSUM CREEK ON NS 413 (OLD HWY 169) APPX 7.5 MILE NORTH OF SH- 10. UTILITY FOR (04) $56,650 DIV. $56,650 NOWATA 8 27819(04) COBRGE FY 2012 BRIDGE & APPROACHES CO BR OVER OPOSSUM CREEK ON NS 408 APPX 6.0 MILE WEST OF US-169 $566,500 DIV. $777,393 NOWATA 8 27819(06) COBRGE FY 2012 RIGHT OF WAY CO BR OVER OPOSSUM CREEK ON NS 408 APPX 6.0 MILE WEST OF US-169 RW FOR (04) $10,300 DIV. $10,300 NOWATA 8 27819(07) COBRGE FY 2012 UTILITIES CO BR OVER OPOSSUM CREEK ON NS 408 APPX 6.0 MILE WEST OF US-169 UTILITY FOR (04) $10,300 DIV. $10,300 OKFUSKEE 3 23958(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER HILLIBY TRIBUTARY, 2.1 MI. N. AND 2.6 MI. E. OF PADEN $76,220 DIV. $381,100 OKFUSKEE 3 25425(04) CO RD 5.00 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD(EW-96), APPROX. 8.0 MILE NORTH OF PADEN, BEG @ CO RD(NS-362) & EXT EAST TO CO RD(NS-366) (5404C) (WELTY RD.) $3,347,500 DIV. $3,347,500 OKLAHOMA 4 25011(04) COBRGE 0.12 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER CHISHOM CR. ON CO. RD. EW-90 AND 0.2 MI. E. OF NS-307 $164,800 DIV. $622,779 Friday, July 8, 2011 Page 19 of 63 5 YEAR CIRB WORK PLAN OKLAHOMA 4 25442(06) CO RD 0.00 MI. FY 2012 RIGHT OF WAY HARRAH RD(NS-328) BEG @ JCT SE 29TH ST/SH-270 & EXT SOUTH APPROX 1.5 MILE (RW FOR 25442(04)) $206,000 DIV. $206,000 OKLAHOMA 4 25442(07) CO RD 0.00 MI. FY 2012 UTILITIES HARRAH RD(NS-328) BEG @ JCT SE 29TH ST/SH-270 & EXT SOUTH APPROX 1.5 MILE (UT FOR 25442(04)) $241,000 DIV. $241,000 OKLAHOMA 4 28576(04) CO RD 2.00 MI. FY 2012 PRELIMINARY ENGINEERING PRELIMINARY ENGINEERING CHARTER OAK RD. $51,500 DIV. $51,500 OKLAHOMA 4 28581(04) CO RD 1.00 MI. FY 2012 PRELIMINARY ENGINEERING PE & GEO TECH ON NW 150TH.8 MI E OF TRIPLE X $51,500 DIV. $51,500 OKMULGEE 1 15205(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES CO BR @ A TRIB OF MONTEZUMA CR, 1.2 MI NORTH & 2.5 MI WEST OF HENRYETTA $772,500 DIV. $978,500 OKMULGEE 1 15205(07) COBRGE 0.25 MI. FY 2012 UTILITIES CO BR @ A TRIB OF MONTEZUMA CR, 1.2 MI NORTH & 2.5 MI WEST OF HENRYETTA (UT FOR 15205(04)) $41,200 DIV. $41,200 OKMULGEE 1 22181(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR.: AND APPR. OVER NEGRO CR., 3.2 MI. N. & 1.1 MI. W. OF US-75/SH-56 JCT., IN OKMULGEE $515,000 DIV. $515,000 OKMULGEE 1 22182(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES CO. BR.: AND APPR. OVER UNNAMED CR., 3.1 MI. N. & 1.2 MI. W. OF US-75/SH-56 JCT. IN OKMULGEE $463,500 DIV. $463,500 OKMULGEE 1 23055(04) COBRGE 0.21 MI. FY 2012 BRIDGE & APPROACHES CO. BR.: AND APPR. OVER UNNAMED CR., 2.0 MI. N. AND 3.6 MI. W. OF I-40/SH-75 JCT., IN HENRYETTA $257,500 DIV. $580,920 OKMULGEE 1 25642(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER SNAKE CR., 4.0 MI. W. & 0.5 MI. N. OF SH-16/SH-52 JCT. $154,500 DIV. $515,000 OKMULGEE 1 27879(06) COBRGE 0.50 MI. FY 2012 RIGHT OF WAY CO. BR. AND APPR. OVER SALT CREEK, 1.0 MILE SOUTH AND 3.2 MILES WEST OF BEGGS. (R/W FOR 27879(04)) $51,500 DIV. $51,500 OKMULGEE 1 27879(07) COBRGE 0.50 MI. FY 2012 UTILITIES CO. BR. AND APPR. OVER SALT CREEK, 1.0 MILE SOUTH AND 3.2 MILES WEST OF BEGGS. (UTL FOR 27879(04)) $51,500 DIV. $51,500 OSAGE 8 23929(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER QUAPAW CR. ON OAK ST. APPROX. 0.5 MI. S. OF SH-20 AND 3 MI. W. OF SKIATOOK $1,358,570 DIV. $1,358,570 OTTAWA 8 25092(04) COBRGE 0.76 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER NEOSHO RIVER APPROX. 2.3 MI. E. OF CRAIG C/L (STEPPS FORD BR.) $5,253,000 DIV. $5,253,000 OTTAWA 8 25092(06) COBRGE 0.76 MI. FY 2012 RIGHT OF WAY CO. BR. OVER NEOSHO RIVER APPROX. 2.3 MI. E. OF CRAIG C/L (STEPPS FORD BR.) (RW FOR 25092(04)) $25,750 DIV. $25,750 OTTAWA 8 25092(07) COBRGE 0.76 MI. FY 2012 UTILITIES CO. BR. OVER NEOSHO RIVER APPROX. 2.3 MI. E. OF CRAIG C/L (STEPPS FORD BR.) (UT FOR 25092(04)) $15,450 DIV. $15,450 OTTAWA 8 28682(04) COBRGE FY 2012 BRIDGE & APPROACHES CO BR OVER ON NS 450 UNNAMED TRIB TO HORSE CREEK APPX 0.3 MI NORTH OF AFTON $501,610 DIV. $501,610 OTTAWA 8 28682(05) COBRGE FY 2012 PRELIMINARY ENGINEERING CO BR OVER ON NS 450 UNNAMED TRIB TO HORSE CREEK APPX 0.3 MI NORTH OF AFTON (PE FOR 28682(04) $51,500 DIV. $51,500 OTTAWA 8 28682(06) COBRGE FY 2012 RIGHT OF WAY CO BR OVER ON NS 450 UNNAMED TRIB TO HORSE CREEK APPX 0.3 MI NORTH OF AFTON (RW FOR 28682(04)) $10,300 DIV. $10,300 Friday, July 8, 2011 Page 20 of 63 5 YEAR CIRB WORK PLAN OTTAWA 8 28682(07) COBRGE FY 2012 UTILITIES CO BR OVER ON NS 450 UNNAMED TRIB TO HORSE CREEK APPX 0.3 MI NORTH OF AFTON (UTILS FOR 28682(04)) $40,000 DIV. $40,000 PAWNEE 8 25444(06) COBRGE 0.00 MI. FY 2012 RIGHT OF WAY BELFORD BRIDGE(EW-35) OVER ARKANSAS RIVER APPROX. 6.5 MILE WEST OF RALSTON (5902C) (RW FOR 25444(04)) $85,347 DIV. $85,347 PAWNEE 8 25444(07) COBRGE 0.00 MI. FY 2012 UTILITIES BELFORD BRIDGE(EW-35) OVER ARKANSAS RIVER APPROX. 6.5 MILE WEST OF RALSTON (5902C) (UT FOR 25444(04)) $19,570 DIV. $19,570 PAYNE 4 22169(04) COBRGE 0.50 MI. FY 2012 BRIDGE & APPROACHES COUNTRY CLUB LN.(NS-330) OVER STILLWATER CREEK APPROX 4.0 MILE WEST & 0.5 MILE NORTH OF JCT SH-51/US-177. PHASE 1 $1,751,000 DIV. $1,751,000 PAYNE 4 22169(09) CO RD 1.50 MI. FY 2012 GRADE, DRAIN & SURFACE COUNTRY CLUB LN.(NS-330) BEG @ NORTH END OF BRIDGE & EXT NORTH APPROX 1.5 MILE. PHASE 2 $3,090,000 DIV. $3,090,000 PAYNE 4 23656(04) COBRGE 0.10 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO. BR. OVER COUNCIL CR., 3.0 MI. W. AND 1.8 MI. S. OF SH-18/SH-51 JCT. $164,800 DIV. $395,924 PAYNE 4 25445(05) CO RD 0.00 MI. FY 2012 PRELIMINARY ENGINEERING NORFOLK RD(NS-353) BEG @ SH-33 & EXT NORTH 3.0 MILE TO FAIRLAWN RD(EW-68) (6046C) (PE FOR 25445(04)) $123,600 DIV. $123,600 PAYNE 4 27804(06) COBRGE 0.20 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE & APPROACHES ON EW-67 OVER STILLWATER CREEK 0.3 MI WEST OF MEHAN PE FOR 27804(04) $51,500 DIV. $51,500 PAYNE 4 28577(04) CO RD 2.00 MI. FY 2012 PRELIMINARY ENGINEERING PRELIMINARY ENGINEERING LAKEVIEW & MAJOR $51,500 DIV. $51,500 PAYNE 4 28582(05) CO RD 1.00 MI. FY 2012 PRELIMINARY ENGINEERING 19TH & NORFOLK PRELIMINARY ENGINEERING $51,500 DIV. $51,500 PAYNE 4 28711(05) COBRGE 0.50 MI. FY 2012 PRELIMINARY ENGINEERING 3.4 MILES SOUTH OF RIPLEY PE FOR 28711(04) $50,000 DIV. $50,000 PITTSBURG 2 22949(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR.: AND APPR. OVER UNNAMED CR. APPROX 1.0 MI. S. AND 3.0 E.OF SCIPIO $226,600 DIV. $535,600 PITTSBURG 2 22949(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO. BR.: AND APPR. OVER UNNAMED CR. APPROX 1.0 MI. S. AND 3.0 E.OF SCIPIO R/W FOR 2294904 $5,150 DIV. $5,150 PITTSBURG 2 22949(07) COBRGE 0.20 MI. FY 2012 UTILITIES CO. BR.: AND APPR. OVER UNNAMED CR. APPROX 1.0 MI. S. AND 3.0 E.OF SCIPIO UT FOR 2294904 $5,150 DIV. $5,150 PITTSBURG 2 23479(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER UNNNAMED CREEK APPROX. 0.8 MILE SOUTH OF KREBS $226,600 DIV. $535,600 PITTSBURG 2 23479(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO. BR. OVER UNNNAMED CREEK APPROX. 0.8 MILE SOUTH OF KREBS R/W FOR 2347904 $5,150 DIV. $5,150 PITTSBURG 2 23479(07) COBRGE 0.20 MI. FY 2012 UTILITIES CO. BR. OVER UNNNAMED CREEK APPROX. 0.8 MILE SOUTH OF KREBS UT FOR 2347904 $5,150 DIV. $5,150 PITTSBURG 2 23482(05) COBRGE 0.10 MI. FY 2012 GRADE, DRAIN & SURFACE CAUSEWAY OVER LAKE EUFAULA APPROX. 2 MI EAST OF CROWDER, EAST 0.75 MI (PHASE I) (ROADWAY) (6110C); WITHDRAWN 9-1-10 $1,030,000 DIV. $1,030,000 PITTSBURG 2 23491(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO BR OVER BRUSHY CREEK APPROX 1.0 MILE SOUTH & 1.0 MILE EAST OF BLANCO (6144C) (RW FOR 23491(04)) $15,836 DIV. $15,836 Friday, July 8, 2011 Page 21 of 63 5 YEAR CIRB WORK PLAN PITTSBURG 2 23491(07) COBRGE 0.20 MI. FY 2012 UTILITIES CO BR OVER BRUSHY CREEK APPROX 1.0 MILE SOUTH & 1.0 MILE EAST OF BLANCO (6144C) (UT FOR 23491(04)) $13,725 DIV. $13,725 PONTOTOC 3 25473(04) CO RD 0.50 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO RD(NS-345) OVER 3 BRIDGES BEG @ CO RD(EW-149.5) & EXT NORTH TO SH-3W (6246C) GARR CUT OFF $824,000 DIV. $2,060,000 PONTOTOC 3 27266(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER COTTON CREEK APPROX 0.5 MILE SOUTH & 2.3 MILE EAST OF FRANCIS LOCAL # 182 $334,750 DIV. $833,270 PUSHMATAHA 2 17045(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES CO BR: @ TENMILE CREEK, 1.8 MILES NORTH OF JUMBO $206,000 DIV. $721,000 PUSHMATAHA 2 17045(06) COBRGE 0.20 MI. FY 2012 RIGHT OF WAY CO BR: @ TENMILE CREEK, 1.8 MILES NORTH OF JUMBO R/W FOR 1704504 $5,150 DIV. $5,150 PUSHMATAHA 2 17045(07) COBRGE 0.20 MI. FY 2012 UTILITIES CO BR: @ TENMILE CREEK, 1.8 MILES NORTH OF JUMBO UT FOR 1704504 $5,150 DIV. $5,150 PUSHMATAHA 2 20395(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES COUNTY BRIDGE OVER CLOUDY CREEK, APPROX. 0.7 MILE NORTH & 0.4 MILE EAST OF CLOUDY $1,030,000 DIV. $1,030,000 PUSHMATAHA 2 25476(05) COBRGE 0.57 MI. FY 2012 PRELIMINARY ENGINEERING CO BR OVER AN UNNAMED CR, 3.1 MI EAST & 1.0 MI SOUTH OF RATTAN PE FOR 25476(04) $43,775 DIV. $43,775 PUSHMATAHA 2 28631(05) CO RD 3.50 MI. FY 2012 PRELIMINARY ENGINEERING RECONSTRUCT NOLLA LOOP ROAD (ROUTE 6481C) FROM SH 144 1.0 MILE EAST OF NASHOBA, SOUTH AND EAST 3.5 MILES PE FOR 2863104 $154,500 DIV. $154,500 PUSHMATAHA 2 28634(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER FRAZIER CREEK ON NS-432, LOCATED 1.0 MILE NORTH OF OLETA PE FOR 2863404 $52,015 DIV. $52,015 PUSHMATAHA 2 28636(05) CO RD 3.00 MI. FY 2012 PRELIMINARY ENGINEERING RECONSTRUCT MILLER ROAD (ROUTE 6438C) BEGINNING 1.0 MILE SOUTH OF MILLER EXTENDING NORTH 3.0 MILES PE FOR 2863604 $103,000 DIV. $103,000 PUSHMATAHA 2 28655(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES OVER UNAMMED CREEK ON CO ROAD 1848D, 4.5 MILES EAST AND 3.0 MILES NORTH OF FINLEY PE FOR 2865504 $45,835 DIV. $45,835 ROGER MILLS 5 25477(04) CO RD 8.00 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO RD FR THE SOUTHWEST CORNER OF HAMMON SOUTHWEST 7.5 MI (4 BRIDGES) $3,836,750 DIV. $3,836,750 ROGER MILLS 5 25477(06) CO RD 8.00 MI. FY 2012 RIGHT OF WAY CO RD FR THE SOUTHWEST CORNER OF HAMMON SOUTHWEST 7.5 MI (4 BRIDGES) ROW FOR 25477(04) $25,750 DIV. $25,750 ROGER MILLS 5 25477(07) CO RD 8.00 MI. FY 2012 UTILITIES CO RD FR THE SOUTHWEST CORNER OF HAMMON SOUTHWEST 7.5 MI (4 BRIDGES) UT FOR 25477(04) $25,750 DIV. $25,750 ROGER MILLS 5 25478(05) CO RD 7.00 MI. FY 2012 PRELIMINARY ENGINEERING CO RD (6514C) FR 2.0 MI EAST OF CHEYENNE EAST 7.0 MI TO 6544C PE FOR 25478(05) $139,050 DIV. $139,050 ROGER MILLS 5 28023(04) COBRGE 0.00 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER CAMP HOLLOW CR. APPROX 3.0 MILE EAST & 2.3 MILE NORTH OF REYDON $72,100 DIV. $360,500 ROGER MILLS 5 28687(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES REPLACE PIPE WITH BRIDGE OVER CAMP HOLLOW CREEK, EW93/N176.5 $108,150 DIV. $396,550 ROGER MILLS 5 28687(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING CO BR OVER CAMP HOLLOW CREEK, EW93/N176.5 PE FOR 28687(04) $36,050 DIV. $36,050 Friday, July 8, 2011 Page 22 of 63 5 YEAR CIRB WORK PLAN ROGERS 8 20642(04) COBRGE 0.20 MI. FY 2012 BRIDGE & APPROACHES COUNTY BRIDGE OVER SPUNKY CREEK, 1.8 MILES NORTH AND 0.7 MILES EAST OF JCT SH-66/I-44 $232,780 DIV. $591,220 ROGERS 8 25479(06) CO RD 1.42 MI. FY 2012 RIGHT OF WAY CO RD: OVER TWO UNNAMED CREEKS AND ROADWAY 2.5 MI SOUTHWEST OF KEETONVILLE ROAD (ROW FOR 25479(04) $107,256 DIV. $107,256 ROGERS 8 25479(07) CO RD 1.42 MI. FY 2012 UTILITIES CO RD: OVER TWO UNNAMED CREEKS AND ROADWAY 2.5 MI SOUTHWEST OF KEETONVILLE ROAD (UT FOR 25479(04) $16,995 DIV. $16,995 ROGERS 8 25480(05) CO RD 1.59 MI. FY 2012 PRELIMINARY ENGINEERING CO RD: 2 BRIDGES & ROADWAY, (BR# 107 & 108) PE FOR 25480(04) $118,450 DIV. $118,450 ROGERS 8 25480(06) COBRGE 1.59 MI. FY 2012 RIGHT OF WAY CO RD: 2 BRIDGES & ROADWAY, (BR# 107 & 108) ROW FOR 25480(04) $83,214 DIV. $83,214 ROGERS 8 25480(07) COBRGE 1.59 MI. FY 2012 UTILITIES CO RD: 2 BRIDGES & ROADWAY, (BR# 107 & 108) UT FOR 25480(04) $14,420 DIV. $14,420 ROGERS 8 27811(05) COBRGE FY 2012 PRELIMINARY ENGINEERING CO BR OVER DOG CREEK ON EW 410 APPX 1.2 MI EAST OF SH 66 $72,100 DIV. $72,100 SEQUOYAH 1 20738(04) COBRGE 0.13 MI. FY 2012 BRIDGE & APPROACHES COUNTY BRIDGE OVER BIG SKIN BAYOU, 4.2 MILES WEST & 1.2 MILES NORTH OF MULDROW $257,500 DIV. $607,700 SEQUOYAH 1 25434(06) CO RD 8.40 MI. FY 2012 RIGHT OF WAY CO RD. NS4620 (OLD HWY 17) BEG. 1.0 MI. N OF SH-64 EXTEND N 8.4 MI. TO MARBLE CITY (INCLUDES 2 BRIDGES) OVER BRUSHY CREEK ( ROW FOR 2543404) $103,000 DIV. $103,000 SEQUOYAH 1 25434(07) CO RD 8.40 MI. FY 2012 UTILITIES CO RD. NS4620 (OLD HWY 17) BEG. 1.0 MI. N OF SH-64 EXTEND N 8.4 MI. TO MARBLE CITY (INCLUDES 2 BRIDGES) OVER BRUSHY CREEK (UT FOR 2543404) $103,000 DIV. $103,000 STEPHENS 7 26846(04) COBRGE 0.25 MI. FY 2012 BRIDGE & APPROACHES CO BR ON NS-275: OVER STAGE STAND CR, 7.0 MI WEST & 6.3 MI SOUTH OF THE US-81/SH-7 JCT IN NORTH DUNCAN $127,720 DIV. $638,600 STEPHENS 7 26846(06) COBRGE 0.25 MI. FY 2012 RIGHT OF WAY CO BR ON NS-275: OVER STAGE STAND CR, 7.0 MI WEST & 6.3 MI SOUTH OF THE US-81/SH-7 JCT IN NORTH DUNCAN ROW FOR 26846(04) $5,150 DIV. $5,150 STEPHENS 7 26846(07) COBRGE 0.25 MI. FY 2012 UTILITIES CO BR ON NS-275: OVER STAGE STAND CR, 7.0 MI WEST & 6.3 MI SOUTH OF THE US-81/SH-7 JCT IN NORTH DUNCAN UT FOR 26846(04) $10,300 DIV. $10,300 STEPHENS 7 26847(04) COBRGE 0.30 MI. FY 2012 BRIDGE & APPROACHES CO BR ON NS-277 OVER A TRIBUTARY OF LITTLE BEAVER CR, 1.0 MI NORTH & 6.0 MI WEST OF MARLOW $115,487 DIV. $577,434 STEPHENS 7 27847(05) CO RD 5.00 MI. FY 2012 PRELIMINARY ENGINEERING GRADE, DRAIN, BRIDGE & SURFACE ON EW-187, BEGIN AT NS-277 AND EXTEND EAST 5.0 MILES TO US-81 PE FOR 27847(04) $283,250 DIV. $283,250 TEXAS 6 25483(04) CO RD 5.50 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD: (NS-077) FROM 5.0 MI NORTH OF US-64 NORTH 5.5 MI PHASE I $2,266,000 DIV. $2,266,000 TEXAS 6 25483(06) CO RD 10.50 MI. FY 2012 RIGHT OF WAY CO RD: (7064C) FROM US-64 NORTH 10.5 MI ROW FOR 25483(04) & (08) $20,600 DIV. $20,600 TEXAS 6 25483(07) CO RD 10.50 MI. FY 2012 UTILITIES CO RD: (7064C) FROM US-64 NORTH 10.5 MI UT FOR 25483(04) & (08) $20,600 DIV. $20,600 TEXAS 6 25483(08) CO RD 5.00 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO RD: (7064C) FROM US-64 NORTH 5.0 MI PHASE II $2,575,000 DIV. $2,575,000 Friday, July 8, 2011 Page 23 of 63 5 YEAR CIRB WORK PLAN TEXAS 6 25484(06) COBRGE 0.38 MI. FY 2012 RIGHT OF WAY CO BR OVER HACKBERRY CR, 5.2 MI EAST OF HARDESTY ROW FOR 25484(04) $5,150 DIV. $5,150 TEXAS 6 25484(07) COBRGE 0.38 MI. FY 2012 UTILITIES CO BR OVER HACKBERRY CR, 5.2 MI EAST OF HARDESTY UT FOR 25484(04) $5,150 DIV. $5,150 TEXAS 6 28640(05) CO RD 3.50 MI. FY 2012 PRELIMINARY ENGINEERING RESURFACE ON NS-76. BEGIN AT EW-28.5 AND EXTEND 3.5 MILES NORTH PE FOR 28640(04) $30,900 DIV. $30,900 TILLMAN 5 23236(04) COBRGE 0.02 MI. FY 2012 BRIDGE & APPROACHES CO. BR.: OVER BLUE CR., 3.1 MI SOUTH & 2.3 MI EAST OF GRANDFIELD ON NS-243 $108,150 DIV. $396,550 TILLMAN 5 25485(04) CO RD 5.50 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD 7112C FROM 7120C 5.5 MI TO US-183 $3,746,934 DIV. $3,746,934 TILLMAN 5 25486(04) COBRGE 0.76 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER HORSE & JACK CREEKS, 7 & 8 MI WEST OF THE COTTON C/L ON 7108C $1,256,600 DIV. $1,256,600 TILLMAN 5 25486(07) COBRGE 0.76 MI. FY 2012 UTILITIES CO BR OVER HORSE & JACK CREEKS, 7 & 8 MI WEST OF THE COTTON C/L ON 7108C UT FOR 25486(04) $10,300 DIV. $10,300 TILLMAN 5 26558(04) CO RD 0.00 MI. FY 2012 GRADE, DRAIN & SURFACE CORD(EW-180) BEG @ US-183 & EXT EAST APPROX 1.25 MILE TO CORD(NS-223); CORD(NS-223) BEG @ CORD(EW-180) & EXT SOUTH APPROX 3.0 MILE TO EW-183. $340,430 DIV. $1,702,151 TILLMAN 5 28689(05) CO RD 10.00 MI. FY 2012 PRELIMINARY ENGINEERING CO RD 71-08C, BEGIN 5.4 MI E. OF MANITOU EXTEND EAST 10.0 MI. PE FOR 28689(04) $77,250 DIV. $77,250 TULSA 8 25487(04) CO RD 1.20 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO RD: DIP CREEK ROAD, BETWEEN 61ST SOUTH & COYOTE TRAIL (INCLUDES BRIDGE) $2,030,130 DIV. $2,030,130 TULSA 8 25487(06) CO RD 1.20 MI. FY 2012 RIGHT OF WAY CO RD: DIP CREEK ROAD, BETWEEN 61ST SOUTH & COYOTE TRAIL (INCLUDES BRIDGE) ROW FOR 25487(04) $25,750 DIV. $25,750 TULSA 8 25487(07) CO RD 1.20 MI. FY 2012 UTILITIES CO RD: DIP CREEK ROAD, BETWEEN 61ST SOUTH & COYOTE TRAIL (INCLUDES BRIDGE) UT FOR 25487(04) $115,360 DIV. $115,360 WAGONER 1 22156(04) COBRGE 0.50 MI. FY 2012 BRIDGE & APPROACHES CO BR: OVER SPUNKY CR, 0.1 MI SOUTH & 3.0 MI WEST OF FAIR OAKS (S. OF US-412 NEAR ROGER C/L) $1,030,000 DIV. $1,030,000 WAGONER 1 25488(06) CO RD 8.00 MI. FY 2012 RIGHT OF WAY CO RD 7342C FR 5.75 MI WEST OF US-69, EXT 8.0 MI NORTH FROM SH-51 (ELEVATOR ROAD) ROW FOR 25488(04) $309,000 DIV. $309,000 WAGONER 1 25489(05) CO RD 2.00 MI. FY 2012 PRELIMINARY ENGINEERING CO RD 7308C: E 161ST, BEGIN AT S 257TH EAST( NS 411) EXTEND TO SH-72 (INCLUDES CEDAR CR BR) PE FOR 25489(04) $309,000 DIV. $309,000 WASHINGTON 8 25490(06) CO RD 3.00 MI. FY 2012 RIGHT OF WAY CO RD FROM US-75 @ THE NORTH EDGE OF DEWEY, EXT 1.0 MI EAST & 2.0 MI SOUTH ROW FOR 25490(04) $300,204 DIV. $300,204 WASHINGTON 8 25490(07) CO RD 3.00 MI. FY 2012 UTILITIES CO RD FROM US-75 @ THE NORTH EDGE OF DEWEY, EXT 1.0 MI EAST & 2.0 MI SOUTH ROW FOR 25490(04) $32,960 DIV. $32,960 WASHITA 5 25491(04) CO RD 0.00 MI. FY 2012 GRADE, DRAIN & SURFACE CO RD FROM SH-152 NORTH 2.0 MI TO US-183 & 0.7 MI ALONG 14TH ST. TO US-183: ALL IN CORDELL $2,455,327 DIV. $2,455,327 WASHITA 5 25492(04) COBRGE 1.52 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER 4 CREEKS ON 7506C, WEST OF BESSIE PHASE I $4,018,030 DIV. $4,018,030 Friday, July 8, 2011 Page 24 of 63 5 YEAR CIRB WORK PLAN WASHITA 5 26626(06) CO RD 5.00 MI. FY 2012 PRELIMINARY ENGINEERING CO RD: FROM SH-54 IN COLONY, ON NS-242, NORTH TO EW-110 (PE FOR 26626(04) $25,750 DIV. $25,750 WASHITA 5 28040(04) COBRGE 0.00 MI. FY 2012 BRIDGE & APPROACHES CO BR OVER UNNAMED CREEK APPROX 4.7 MILE SOUTH & 12 MILE WEST OF DILL CITY $144,200 DIV. $576,800 WASHITA 5 28688(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING CO BR OVER BOGGY CREEK EW-118N230.5 PE FOR 28688(04) $30,900 DIV. $30,900 WASHITA 5 28690(05) CO RD 11.00 MI. FY 2012 PRELIMINARY ENGINEERING CO.RD. GRADE,DRAIN,SURFACE MC.75-06C BEGIN SH-44 EXT.E.11MI.TO US-183 PE FOR 28690(04) $133,900 DIV. $133,900 WOODS 6 23046(04) COBRGE 0.02 MI. FY 2012 BRIDGE & APPROACHES CO. BR.: OVER LITTLE EAGLE CHIEF CR., 1.6 MI. N. AND .8 MI. E. OF HOPETON, ON EW-21 $248,230 DIV. $454,230 WOODS 6 24196(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER UNNAMED CR., 7.0 MI. W. AND 6.5 MI. S. OF US-64/US-281S JCT. ON NS-237 $103,000 DIV. $515,000 WOODS 6 25475(04) CO RD 6.00 MI. FY 2012 GRADE,DRAINING,BRIDGE & SURFACE CO RD: EW 025 FROM US-281 EAST 6.0 MI TO DACOMA $3,090,000 DIV. $3,090,000 WOODS 6 25475(06) CO RD 6.00 MI. FY 2012 RIGHT OF WAY CO RD: EW 025 FROM US-281 EAST 6.0 MI & WEST 5.0 MI ROW FOR 25475(04) $10,300 DIV. $10,300 WOODS 6 25475(07) CO RD 6.00 MI. FY 2012 UTILITIES CO RD: EW 025 FROM US-281 EAST 6.0 MI & WEST 5.0 MI UT FOR 25475(04) $10,300 DIV. $10,300 WOODS 6 25493(05) COBRGE 0.38 MI. FY 2012 PRELIMINARY ENGINEERING CO BR OVER SALT FORK RV, 5.0 MI NORTH, 7.0 MI WEST & 0.8 MI SOUTH OF THE US-281/SH-11 JCT PE FOR 25493(04) $92,700 DIV. $92,700 WOODS 6 28347(05) COBRGE 0.25 MI. FY 2012 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES ON NS-241 OVER LITTLE EAGLE CHIEF CREEK, 3.0 MILES WEST AND 2.1 MILES SOUTH OF JCT US-64/US-281S PE FOR 28347(04) CIRB FUND $48,410 DIV. $48,410 WOODS 6 28458(05) COBRGE 1.00 MI. FY 2012 PRELIMINARY ENGINEERING CO RD AND 2 BRIDGES ON NS-230 BETWEEN EW-12 AND EW-13 PE FOR 28458(04) $136,990 DIV. $136,990 WOODWARD 6 25700(04) COBRGE 0.10 MI. FY 2012 BRIDGE & APPROACHES CO. BR. OVER DEEP DR., 4.0 MI. S. & 10.5 MI. E. OF MUTUAL OKLAHOMA ON EW-58 $245,257 DIV. $515,000 WOODWARD 6 26802(06) CO RD 4.00 MI. FY 2012 RESURFACE CO RD: NS-203 FROM 2.8 MI WEST & 3.0 MI NORTH OF SHARON EXTEND NORTH 5.0 MI $515,000 DIV. $1,545,000 WOODWARD 6 27406(06) CO RD 6.50 MI. FY 2012 RIGHT OF WAY RESURFACE & WIDEN CO RD (QUINLAN RD) & REPLACE CO BR BEGIN US-412/NS-221 NORTHEAST TO NS-223 THEN NORTH 2.5 MI TO EW-35 (PHASE 1) RW FOR 27406(04) $10,300 DIV. $10,300 WOODWARD 6 27406(07) CO RD 6.50 MI. FY 2012 UTILITIES RESURFACE & WIDEN CO RD (QUINLAN RD) & REPLACE CO BR BEGIN US-412/NS-221 NORTHEAST TO NS-223 THEN NORTH 2.5 MI TO EW-35 (PHASE 1) UT FOR 27406(04) $10,300 DIV. $10,300 Project Count: 472 $217,455,283 $264,785,835 Friday, July 8, 2011 Page 25 of 63 FFY 2013 5 YEAR CIRB WORK PLAN FISCAL YEAR 2013 CIRB$ Total$ ADAIR 1 24831(04) COBRGE 0.50 MI. FY 2013 BRIDGE REHABILITATION CO. BR. OVER ILLINOIS RIVER, 4.0 MI. S. AND 0.8 MI. E.OF NW C/L $2,120,000 DIV. $2,120,000 ADAIR 1 28652(05) COBRGE FY 2013 PRELIMINARY ENGINEERING LYONS SWITCH COMMUNITY (PE FOR 2865204) $67,000 DIV. $67,000 ALFALFA 6 24832(08) CO RD 8.00 MI. FY 2013 GRADE,DRAINING,BRIDGE & SURFACE CO. RD. ON NS-255 FROM EW-25 EXT. N. 2.0 MI. TO EW-23 THEN EXT. E. 6.0 MI. TO US-64 (PH II) $3,392,000 DIV. $3,392,000 ALFALFA 6 28343(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES IDGE AND APPROACHES ON EW-034 OVER EAGLE CHIEF CREEK, 1.0 MILES NORTH AND 0.5 MILES EAST OF ALINE $106,000 DIV. $530,000 ALFALFA 6 28441(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING COUNTY BRIDGE ON EW-09 OVER BIG SANDY CREEK, 3.9 MILES EAST AND 1.0 MILES SOUTH OF BYRON PE FOR 28441(04) CIRB FUNDS $49,820 DIV. $49,820 ATOKA 2 27370(04) COBRGE 0.20 MI. FY 2013 BRIDGE & APPROACHES CO BR OVER UNNAMED CREEK APPROX 0.2 MILE SOUTH & 1.2 MILE WEST OF TUSHKA $86,920 DIV. $434,600 ATOKA 2 27370(06) COBRGE 0.20 MI. FY 2013 RIGHT OF WAY CO BR OVER UNNAMED CREEK APPROX 0.2 MILE SOUTH & 1.2 MILE WEST OF TUSHKA RW FOR 2737004 $5,300 DIV. $5,300 ATOKA 2 27370(07) COBRGE 0.20 MI. FY 2013 UTILITIES CO BR OVER UNNAMED CREEK APPROX 0.2 MILE SOUTH & 1.2 MILE WEST OF TUSHKA UT FOR 2737004 $5,300 DIV. $5,300 BEAVER 6 24837(04) COBRGE 0.66 MI. FY 2013 BRIDGE & APPROACHES CO. BR. OVER WILLOW CR., EW-15, 4.0 MI. E. & 6.0 MI. N. & 1.6 MI. E. OF BOYD $1,166,000 DIV. $1,166,000 BEAVER 6 24838(06) COBRGE 1.89 MI. FY 2013 RIGHT OF WAY CO. BR. OVER DUGOUT CR., 0.7 MI. S. & 6.4 MI. W. OF BEAVER (RW FOR 24838(04)) $10,600 DIV. $10,600 BEAVER 6 24838(07) COBRGE 1.89 MI. FY 2013 UTILITIES CO. BR. OVER DUGOUT CR., 0.7 MI. S. & 6.4 MI. W. OF BEAVER (UT FOR 24838(04)) $10,600 DIV. $10,600 BEAVER 6 28344(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING IDGE AND APPROACHES ON EW-019 OVER CAMP CREEK, 8.0 MILES NORTH AND 7.6 MILES EAST OF ELMWOOD PE FOR 28344(04) CIRB FUNDS $68,900 DIV. $68,900 BEAVER 6 28349(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES COUNTY BRIDGE ON NS-141 OVER CLEAR CREEK, 2.0 MILES NORTH AND 2.0 MILES EAST OF ELMWOOD $106,000 DIV. $530,000 BECKHAM 5 26657(04) COBRGE 0.10 MI. FY 2013 BRIDGE & APPROACHES CO BR APPROX 6.0 MILE NORTH & 2.1 MILE EAST OF SAYRE. $80,560 DIV. $402,800 BECKHAM 5 28700(05) COBRGE 0.03 MI. FY 2013 PRELIMINARY ENGINEERING CO BR. OVER BUFFALO CREEK 12.5 MI.N.&2.7 MI.E. OF ERICK PE FOR 28700(04) $31,800 DIV. $31,800 BLAINE 5 28692(04) CO RD 4.00 MI. FY 2013 WIDEN & RESURFACE CO.RD. MC-06-40C BEGINNING AT US 270 EXTENDING SOUTH 4.0 MI. $1,812,600 DIV. $1,812,600 BLAINE 5 28692(05) CO RD 4.00 MI. FY 2013 PRELIMINARY ENGINEERING CO.RD. MC-06-40C BEGINNING AT US 270 EXTENDING SOUTH 4.0 MI. PE. FOR 28692(04) $95,400 DIV. $95,400 BLAINE 5 28694(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES COBR. REPLACE BRIDGE OVER 9 MILE CREEK,6 MI. S. AND 0.4 EAST OF CANTON. $80,560 DIV. $402,800 BLAINE 5 28703(05) CO RD 3.00 MI. FY 2013 PRELIMINARY ENGINEERING GRADE DRAIN,SURFACE MAJOR COLLECTOR 06-41C AT SH-51 EXT.S 3.0MI. TO 06-10C PE FOR 28703(04) $63,600 DIV. $63,600 Friday, July 8, 2011 Page 26 of 63 5 YEAR CIRB WORK PLAN BRYAN 2 22488(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES CO. BR.: AND APPR. OVER ISLAND BAYOU, APPROX. 3.2 MI N. OF YUBA $318,000 DIV. $689,000 BRYAN 2 22488(06) COBRGE 0.25 MI. FY 2013 RIGHT OF WAY CO. BR.: AND APPR. OVER ISLAND BAYOU, APPROX. 3.2 MI N. OF YUBA R/W FOR 2248804 $5,300 DIV. $5,300 BRYAN 2 22488(07) COBRGE 0.25 MI. FY 2013 UTILITIES CO. BR.: AND APPR. OVER ISLAND BAYOU, APPROX. 3.2 MI N. OF YUBA UT FOR 2248804 $5,300 DIV. $5,300 BRYAN 2 24800(04) COBRGE 0.95 MI. FY 2013 BRIDGE & APPROACHES CO BR OVER THE RED RIVER, S.E. OF HENDRIX (CARPENTERS BLUFF BR) $6,360,000 DIV. $6,360,000 CADDO 7 24802(04) CO RD 2.00 MI. FY 2013 GRADE, DRAIN & SURFACE CO RD (EW-131) BEG AT US-281 & EXTEND WEST APPROXIMATELY 5.8 MILES $4,814,520 DIV. $5,344,520 CADDO 7 24803(06) COBRGE 1.00 MI. FY 2013 RIGHT OF WAY CO BR OVER THE LITTLE WASHITA RIVER WEST OF CYRIL ON NS-267 BEG @ SH-19 & EXT APPROX 1.0 MILE SOUTH(TWO BRIDGES) (RW FOR 24803(04)) $31,800 DIV. $31,800 CADDO 7 24803(07) COBRGE 1.00 MI. FY 2013 UTILITIES CO BR OVER THE LITTLE WASHITA RIVER WEST OF CYRIL ON NS-267 BEG @ SH-19 & EXT APPROX 1.0 MILE SOUTH(2 BRIDGES) (UT FOR 24803(04)) $106,000 DIV. $106,000 CANADIAN 4 24804(04) CO RD 4.00 MI. FY 2013 GRADE,DRAINING,BRIDGE & SURFACE CO RD FROM US-81 IN OKARCHE WEST 4.0 MI (EW-89) $4,240,000 DIV. $4,240,000 CANADIAN 4 26646(04) CO RD 2.00 MI. FY 2013 GRADE, DRAIN & SURFACE CO RD(NS-274) BEG @ EW-91, APPROX 6.5 MILE NORTH OF CALUMET, & EXT NORTH 2.0 MILE TO EW-89(KINGFISHER C/L) $275,600 DIV. $1,378,000 CANADIAN 4 26967(06) COBRGE 0.23 MI. FY 2013 PRELIMINARY ENGINEERING CO BR ON NS-289 OVER TRIB TO PURCELL CREEK APPROX 6.0 MILE WEST & 1.8 MILE SOUTH OF YUKON PE FOR 26967(04) $45,580 DIV. $45,580 CARTER 7 27435(04) COBRGE 0.20 MI. FY 2013 BRIDGE & APPROACHES CO RD(EW-190) OVER WALNUT CREEK APPROX 0.3 MILE WEST OF SH-76 & 2.0 MILE NORTH OF HEALDTON (LOW WATER XING) $127,200 DIV. $636,000 CARTER 7 27435(06) COBRGE 0.20 MI. FY 2013 RIGHT OF WAY CO RD(EW-190) OVER WALNUT CREEK APPROX 0.3 MILE WEST OF SH-76 & 2.0 MILE NORTH OF HEALDTON (LOW WATER XING) ROW FOR 27435(04) $5,300 DIV. $5,300 CARTER 7 27435(07) COBRGE 0.20 MI. FY 2013 UTILITIES CO RD(EW-190) OVER WALNUT CREEK APPROX 0.3 MILE WEST OF SH-76 & 2.0 MILE NORTH OF HEALDTON (LOW WATER XING) UT FOR 27435(04) $10,600 DIV. $10,600 CARTER 7 28388(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-199) OVER TRIB. TO HICKORY CREEK, 1.3 MILES SOUTH AND 0.8 MILES WEST OF JCT I-35/US-70 PE FOR 28388(04) $53,000 DIV. $53,000 CHEROKEE 1 23430(06) COBRGE 0.43 MI. FY 2013 RIGHT OF WAY CO. BR. OVER BARRON FORK CREEK, 0.8 MI SOUTH OF WELLING (RW FOR 224304) $53,000 DIV. $53,000 CHEROKEE 1 23430(07) COBRGE 0.43 MI. FY 2013 UTILITIES CO. BR. OVER BARRON FORK CREEK, 0.8 MI SOUTH OF WELLING (UT FOR 224304) $53,000 DIV. $53,000 CHEROKEE 1 24824(04) CO RD 1.00 MI. FY 2013 GRADE,DRAINING,BRIDGE & SURFACE CO RD:NS4410 FROM 3.8 MI S &1.0 MI. W. OF HULBERT, EXT. NORTH APPRX. 1.0 MI OVER RATTLESNAKE CREEK TRIB. $2,000,000 DIV. $2,000,000 CHEROKEE 1 27722(04) COBRGE 0.10 MI. FY 2013 BRIDGE & APPROACHES CO BR ON NS445 OVER MAYNARD BAYOU 5 MI SOUTH & 5.5 MI WEST OF TAHLEQUAH $265,000 DIV. $530,000 CHOCTAW 2 21651(04) COBRGE 0.20 MI. FY 2013 BRIDGE & APPROACHES CO. BR.: OVER CARNEY CREEK, APPROX. 5.0 MI. EAST OF GRANT $225,780 DIV. $490,780 Friday, July 8, 2011 Page 27 of 63 5 YEAR CIRB WORK PLAN CHOCTAW 2 21651(06) COBRGE 0.20 MI. FY 2013 RIGHT OF WAY CO. BR.: OVER CARNEY CREEK, APPROX. 5.0 MI. EAST OF GRANT R/W FOR 2165104 $5,300 DIV. $5,300 CHOCTAW 2 21651(07) COBRGE 0.20 MI. FY 2013 UTILITIES CO. BR.: OVER CARNEY CREEK, APPROX. 5.0 MI. EAST OF GRANT UT FOR 2165104 $5,300 DIV. $5,300 CHOCTAW 2 21782(04) COBRGE 0.20 MI. FY 2013 BRIDGE & APPROACHES CO. BR.: OVER CROWDER CREEK, APPROX. 2.5 MI N. & 2.6 MI. E. OF SOPER $371,000 DIV. $742,000 CHOCTAW 2 21782(06) COBRGE 0.20 MI. FY 2013 RIGHT OF WAY CO. BR.: OVER CROWDER CREEK, APPROX. 2.5 MI N. & 2.6 MI. E. OF SOPER R/W FOR 2178204 $5,300 DIV. $5,300 CHOCTAW 2 21782(07) COBRGE 0.20 MI. FY 2013 UTILITIES CO. BR.: OVER CROWDER CREEK, APPROX. 2.5 MI N. & 2.6 MI. E. OF SOPER UT FOR 2178204 $5,300 DIV. $5,300 CHOCTAW 2 24820(04) COBRGE 1.04 MI. FY 2013 BRIDGE & APPROACHES CO BR OVER CLEAR BOGGY CR, 1.9 MI EAST & 4.3 MI NORTH OF BOSWELL $2,332,000 DIV. $2,332,000 CHOCTAW 2 24821(04) COBRGE 1.14 MI. FY 2013 BRIDGE & APPROACHES CO BR OVER MUDDY BOGGY CR, 5.0 MI NORTH OF US-70 $5,724,000 DIV. $5,724,000 COAL 3 24943(06) CO RD 4.75 MI. FY 2013 RIGHT OF WAY CO RD & BR: FROM SH-3, 1.0 MI WEST OF TUPELO, SOUTH 4.75 MI ROW FOR 24943(04) $53,000 DIV. $53,000 COAL 3 24943(07) CO RD 4.75 MI. FY 2013 UTILITIES CO RD & BR: FROM SH-3, 1.0 MI WEST OF TUPELO, SOUTH 4.75 MI UT FOR 24943(04) $53,000 DIV. $53,000 COMANCHE 7 28373(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES BRIDGE AND APPROACHES (EW-170) OVER BEAVER CREEK, 3.0 MILES SOUTH AND 2.7 MILES EAST OF JCT SH-7/SH-65 (LOW WATER XING) $168,752 DIV. $843,760 COMANCHE 7 28373(06) COBRGE 0.25 MI. FY 2013 RIGHT OF WAY BRIDGE AND APPROACHES (EW-170) OVER BEAVER CREEK, 3.0 MILES SOUTH AND 2.7 MILES EAST OF JCT SH-7/SH-65 (LOW WATER XING) ROW FOR 28373(04) $5,300 DIV. $5,300 COMANCHE 7 28373(07) COBRGE 0.25 MI. FY 2013 UTILITIES BRIDGE AND APPROACHES (EW-170) OVER BEAVER CREEK, 3.0 MILES SOUTH AND 2.7 MILES EAST OF JCT SH-7/SH-65 (LOW WATER XING) UT FOR 28373(04) $10,600 DIV. $10,600 COTTON 7 24859(06) COBRGE 6.00 MI. FY 2013 RIGHT OF WAY CO RD(NS-270) BEG APPROX 3.5 MILE EAST & 3.0 MILE SOUTH OF JCT SH-65/SH-5 IN TEMPLE & EXT NORTH APPROX 6.0 MILE (RW FOR 24859(04)) $106,000 DIV. $106,000 COTTON 7 24859(07) COBRGE 6.00 MI. FY 2013 UTILITIES CO RD(NS-270) BEG APPROX 3.5 MILE EAST & 3.0 MILE SOUTH OF JCT SH-65/SH-5 IN TEMPLE & EXT NORTH APPROX 6.0 MILE (UT FOR 24859(04)) $265,000 DIV. $265,000 COTTON 7 28410(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES BRIDGE AND APPROACHES (EW-185) OVER WEST CACHE CREEK TRIB., 2.0 MILES SOUTH AND 1.4 MILES WEST OF JCT SH-5/I-44 $78,440 DIV. $392,200 COTTON 7 28410(06) COBRGE 0.25 MI. FY 2013 RIGHT OF WAY BRIDGE AND APPROACHES (EW-185) OVER WEST CACHE CREEK TRIB., 2.0 MILES SOUTH AND 1.4 MILES WEST OF JCT SH-5/I-44 ROW FOR 28410(04) $5,300 DIV. $5,300 COTTON 7 28410(07) COBRGE 0.25 MI. FY 2013 UTILITIES BRIDGE AND APPROACHES (EW-185) OVER WEST CACHE CREEK TRIB., 2.0 MILES SOUTH AND 1.4 MILES WEST OF JCT SH-5/I-44 UT FOR 28410(04) $10,600 DIV. $10,600 CRAIG 8 28526(04) COBRGE FY 2013 BRIDGE & APPROACHES CO BR ON NS448 OVER COW CREEK APPX 4.0 MI EAST OF WELCH $168,258 DIV. $378,950 CRAIG 8 28530(06) COBRGE FY 2013 RIGHT OF WAY CO BR ON NS 429 OVER BIG CREEK APPX 2.5 MILE SOUTH OF KANSAS SL (RW FOR 28530(04)) $23,850 DIV. $23,850 Friday, July 8, 2011 Page 28 of 63 5 YEAR CIRB WORK PLAN CRAIG 8 28530(07) COBRGE FY 2013 UTILITIES CO BR ON NS 429 OVER BIG CREEK APPX 2.5 MILE SOUTH OF KANSAS SL UT FOR 2853(04)) $23,850 DIV. $23,850 CREEK 8 22350(08) CO RD 1.00 MI. FY 2013 GRADE, DRAIN & SURFACE CO. RD: WEST 81ST STREET SOUTH, FROM FRANKOMA ROAD WEST TO SH-97 $6,385,440 DIV. $6,385,440 DELAWARE 8 28589(04) COBRGE FY 2013 BRIDGE & APPROACHES CO. BR ON EW456 OVER BEATY CREEK 7 MI SE OF JAY $240,962 DIV. $688,812 DEWEY 5 28452(04) CO RD 0.00 MI. FY 2013 GRADE, DRAIN & SURFACE GRADE DRAIN SURFACE 2208C FROM 2238C EAST 5.5 MI TO US-183 $287,525 DIV. $1,347,525 DEWEY 5 28695(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES COBR. REPLACE CO. BRIDGE OVER LONE CREEK,1.5MI. S. AND 3.8 MI. E OF WEBB. $80,560 DIV. $402,800 DEWEY 5 28699(05) CO RD 8.00 MI. FY 2013 PRELIMINARY ENGINEERING GRADE,DRAIN,SURFACE CO-RD 22-02C MAJOR COLLECT.FROM US-60&US281 E.8MI. PE FOR 28699(04) $127,200 DIV. $127,200 ELLIS 6 28456(06) CO RD 6.50 MI. FY 2013 RIGHT OF WAY CO RD ON NS-190, BEGIN AT SH-60 AND EXTEND NORTH 6.5 MILES RW FOR 28456(04 $10,600 DIV. $10,600 ELLIS 6 28456(07) CO RD 6.50 MI. FY 2013 UTILITIES CO RD ON NS-190, BEGIN AT SH-60 AND EXTEND NORTH 6.5 MILES UT FOR 28456(04 $10,600 DIV. $10,600 ELLIS 6 28457(05) CO RD 7.50 MI. FY 2013 PRELIMINARY ENGINEERING CO RD ON EW-37, BEGINAT US-283 AND EXTEND EAST 7.5 MILES TO SH-46 D2 PE FOR 28457(04) $159,000 DIV. $159,000 GARFIELD 4 24868(06) CO RD 11.00 MI. FY 2013 RIGHT OF WAY CO. RD. EW-40 FROM NS-294 TO 305 (RW FOR 24868(04)(08)) $10,600 DIV. $10,600 GARFIELD 4 24868(07) CO RD 11.00 MI. FY 2013 UTILITIES CO. RD. EW-40 FROM NS-294 TO 305 (RW FOR 24868(04)(08)) $10,000 DIV. $10,000 GARFIELD 4 27233(04) COBRGE 0.15 MI. FY 2013 BRIDGE & APPROACHES CB ON EW-57 8 MI SOUTH & 1.2 MI EAST OF COVINGTON $106,000 DIV. $530,000 GARFIELD 4 28374(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES ON EW 34 OVER RED ROCK CREEK, 5.0 MILES SOUTH AND 3.3 MILES EAST OF HUNTER PE FOR 28374(04) CIRB FUNDS $49,820 DIV. $49,820 GARFIELD 4 28423(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING BRIDGE ON EW-54 OVER TURKEY CREEK, 2.6 MILES NORTH AND 5.6 MILES WEST OF BISON PE FOR 28423(04) CIRB FUNDS $49,820 DIV. $49,820 GRADY 7 24945(04) CO RD 4.00 MI. FY 2013 GRADE, DRAIN & SURFACE CO RD FROM 0.5 MI NORTH OF I-44 NORTH TO SH-37 (MC-2686C) (SARA ROAD) $5,883,000 DIV. $5,883,000 GRADY 7 27856(05) CO RD FY 2013 PRELIMINARY ENGINEERING GRADE, DRAIN, BRIDGE & SURFACE ON EW-142, BEGIN AT US-81 EXT EAST 1.0 MILE, NS-284 AT EW-141 EXT S 1.5 MI, THEN E 1.0 MI ON EW-142.5 PE FOR 27856(04) $291,500 DIV. $291,500 GRADY 7 28442(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (EW-137) OVER TRIB. TO WEST BITTER CREEK, 0.4 MILES WEST AND 1.0 MILE SOUTH OF JCT US-62/SH-39 PE FOR 28442(04) $53,000 DIV. $53,000 GRANT 4 27281(04) COBRGE 0.17 MI. FY 2013 BRIDGE & APPROACHES CO RD(EW-12) OVER AN UNNAMED CREEK APPROX 0.5 MI WEST OF SAND CREEK $106,000 DIV. $530,000 GRANT 4 28413(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING COUNTY BRIDGE ON NS-296 OVER UNNAMED CREEK, 2.0 MILES EAST AND 7.0 MILES NOTH OF MEDFORD PE FOR 28413(04) CIRB FUNDS $49,820 DIV. $49,820 Friday, July 8, 2011 Page 29 of 63 5 YEAR CIRB WORK PLAN GRANT 4 28418(06) COBRGE 0.25 MI. FY 2013 RIGHT OF WAY COUNTY BRIDGE ON EW-09 OVER SAND CREEK, 5.0 MILES NORTH AND 0.4 MILES EAST OF JCT SH-11/SH-132 RW FOR 28418(04) $5,300 DIV. $5,300 GRANT 4 28418(07) COBRGE 0.25 MI. FY 2013 UTILITIES COUNTY BRIDGE ON EW-09 OVER SAND CREEK, 5.0 MILES NORTH AND 0.4 MILES EAST OF JCT SH-11/SH-132 UT FOR 28418(04) $5,300 DIV. $5,300 GRANT 4 28419(06) CO RD 4.00 MI. FY 2013 PRELIMINARY ENGINEERING COUNTY ROAD EW-09 BEG AT SH-132 AND EXT E 6.0 MILES TO WAKITA, EW-08 BEG 4.0 MILES E OF SH-132 AND EXT E 4.0 MILES PE FOR 28419(04)(05) $148,400 DIV. $148,400 GREER 5 28697(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES CO BR. REPLACE BRIDGE OVER UNNAMED CREEK 2MI.WEST AND 0.9MI N.OF ALTUS LAKE DAM. $80,560 DIV. $402,800 HARMON 5 28701(05) COBRGE 0.03 MI. FY 2013 PRELIMINARY ENGINEERING CO BR OVER UNNAMED CREEK 1.1 MI S. AND 1.3 MI E. OF VINSON PE FOR 28701(04) $31,800 DIV. $31,800 HASKELL 1 21381(04) COBRGE 0.20 MI. FY 2013 BRIDGE & APPROACHES CO BR: OVER TALOKA CREEK, NORTH OF STIGLER ON NS444 AT EW 120.2 $265,000 DIV. $574,520 HASKELL 1 24967(06) CO RD 4.00 MI. FY 2013 RIGHT OF WAY CO RD NS 447 ,BEGINNING APPROX. 3.5 MI EAST OF STIGLER AT SH. 9 AND EXTEND 4.0 MI NORTH TO GARLAND (TAMAHA RD PHASE 1) ROW FOR 24967(04) $31,800 DIV. $31,800 HASKELL 1 24967(07) CO RD 4.00 MI. FY 2013 UTILITIES CO RD NS 447 ,BEGINNING APPROX. 3.5 MI EAST OF STIGLER AT SH. 9 AND EXTEND 4.0 MI NORTH TO GARLAND (TAMAHA RD PHASE 1) UT FOR 24967(04) $31,800 DIV. $31,800 HASKELL 1 28411(04) CO RD 2.80 MI. FY 2013 GRADE,DRAINING,BRIDGE & SURFACE CO. RD. EW1270 WEST LONA VALLEY RD. BEG. 2.0 MI W. & 4.0 MI N. OF KINTA,EXT 2.8 MI. EAST TO SH-2 (OVER UNNAMED CREEK) $1,770,200 DIV. $1,770,200 HASKELL 1 28499(06) CO RD 6.50 MI. FY 2013 RIGHT OF WAY CO RD NS 4580 & EW 1175 BEGINNING 3.0 MI EAST OF KEOTA AT SH 9 EXTEND NORTH 3.5 MI THEN 3.0 MI EAST. (STAR ROAD) ROW FOR 28499(04) $21,200 DIV. $21,200 HASKELL 1 28499(07) CO RD 6.50 MI. FY 2013 UTILITIES CO RD NS 4580 & EW 1175 BEGINNING 3.0 MI EAST OF KEOTA AT SH 9 EXTEND NORTH 3.5 MI THEN 3.0 MI EAST. (STAR ROAD) UT FOR 28499(04) $21,200 DIV. $21,200 HUGHES 3 24968(04) CO RD 8.00 MI. FY 2013 GRADE,DRAINING,BRIDGE & SURFACE CO RD FROM 3.0 MI SOUTH & 4.0 MI EAST OF THE SH-75/SH-9 JCT EXTEND EAST 3.0 MI (INLUDES GREASY CR) CARSON RD $3,710,000 DIV. $3,710,000 HUGHES 3 24968(06) CO RD 6.75 MI. FY 2013 RIGHT OF WAY CO RD FROM 3.0 MI SOUTH & 4.0 MI EAST OF THE SH-75/SH-9 JCT EXTEND EAST 6.75 MI (ROW FOR 24968(04) CARSON RD. $227,900 DIV. $227,900 HUGHES 3 24968(07) CO RD 6.75 MI. FY 2013 UTILITIES CO RD FROM 3.0 MI SOUTH & 4.0 MI EAST OF THE SH-75/SH-9 JCT EXTEND EAST 6.75 MI (UT FOR 24968(04) CARSON RD. $113,950 DIV. $113,950 JACKSON 5 28021(04) COBRGE 0.00 MI. FY 2013 BRIDGE & APPROACHES CO BR OVER BITTER CREEK APPROX 5.5 MILE NORTH & 2.0 MILE WEST OF ALTUS $80,560 DIV. $402,800 JEFFERSON 7 28375(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES BRIDGE AND APPROACHES (EW-207) OVER FROG CREEK, 0.5 MILES SOUTH AND 2.1 MILES EAST OF RYAN $76,320 DIV. $381,600 JEFFERSON 7 28375(06) COBRGE 0.25 MI. FY 2013 RIGHT OF WAY BRIDGE AND APPROACHES (EW-207) OVER FROG CREEK, 0.5 MILES SOUTH AND 2.1 MILES EAST OF RYAN ROW FOR 28375(04) $5,300 DIV. $5,300 JEFFERSON 7 28375(07) COBRGE 0.25 MI. FY 2013 UTILITIES BRIDGE AND APPROACHES (EW-207) OVER FROG CREEK, 0.5 MILES SOUTH AND 2.1 MILES EAST OF RYAN UT FOR 28375(04) $10,600 DIV. $10,600 JEFFERSON 7 28378(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES BRIDGE AND APPROACHES (EW-191) OVER UNNAMED CREEK, 10.7 MILES EAST OF ADDINGTON $65,720 DIV. $328,600 Friday, July 8, 2011 Page 30 of 63 5 YEAR CIRB WORK PLAN JEFFERSON 7 28378(06) COBRGE 0.25 MI. FY 2013 RIGHT OF WAY BRIDGE AND APPROACHES (EW-191) OVER UNNAMED CREEK, 10.7 MILES EAST OF ADDINGTON ROW FOR 28378(04) $5,300 DIV. $5,300 JEFFERSON 7 28378(07) COBRGE 0.25 MI. FY 2013 UTILITIES BRIDGE AND APPROACHES (EW-191) OVER UNNAMED CREEK, 10.7 MILES EAST OF ADDINGTON UT FOR 28378(04) $10,600 DIV. $10,600 JEFFERSON 7 28443(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES (NS-296) OVER MUD CREEK, 7.2 MILES WEST AND 4.9 MILES SOUTH OF CORNISH PE FOR 28443(04) $53,000 DIV. $53,000 JOHNSTON 3 28574(06) COBRGE 0.50 MI. FY 2013 RIGHT OF WAY BRIDGE AND APPROACHES OVER THE WASHITA RIVER, GREASY BEND BRIDGE (R/W FOR 2857404) $53,000 DIV. $53,000 KAY 4 28431(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING COUNTY BRIDGE ON EW-13 OVER BOIS D'ARC CREEK, 2.9 MILES WEST AND 1.0 MILES NORTH OF KILDARE CN 71 PE FOR 28431(04) CIRB FUNDS $53,000 DIV. $53,000 KAY 4 28433(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES COUNTY BRIDGE ON EW-18 OVER BOIS D'ARC CREEK, 4.0 MILES SOUTH AND 3.5 MILES WEST OF KILDARE CN 103 $106,000 DIV. $530,000 KINGFISHER 4 22821(06) CO RD 2.00 MI. FY 2013 GRADE, DRAIN & SURFACE CO. RD.: (NS-274) APPROX 8.0 MI W. & 5.0 MI N. OF OKARCHE @ CO RD(EW-84) EXT APPROX 2.0 MI N. TO SH-33 $1,060,000 DIV. $1,060,000 KINGFISHER 4 28361(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES BRIDGE AND APPROACHES ON EW-66 OVER TURKEY CREEK, 4.0 SOUTH AND 2.0 MILES WEST OF JCT SH-51/US-81 $106,000 DIV. $530,000 KINGFISHER 4 28437(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING COUNTY BRIDGE ON EW 60 OVER TURKEY CREEK, 2.2 MILES WEST AND 2.0 MILES NORTH OF JCT US-81/SH-51 PE FOR 28437(04) CIRB FUNDS $53,000 DIV. $53,000 KIOWA 5 28022(04) COBRGE 0.00 MI. FY 2013 BRIDGE & APPROACHES CO BR OVER RAINY MOUNTAIN CREEK APPROX 3.0 MILE WEST & 6.9 MILE SOUTH OF GOTEBO $80,560 DIV. $402,800 LATIMER 2 25095(04) CO RD 4.00 MI. FY 2013 GRADE,DRAINING,BRIDGE & SURFACE CO. RD.(EW-159) BEG APPROX. 4.0 MILE WEST OF SH-2 & EXT EAST 4.0 MILE $2,862,000 DIV. $2,862,000 LATIMER 2 28613(04) COBRGE 0.35 MI. FY 2013 BRIDGE & APPROACHES BRIDGE AND APPROACHES OVER WEST FORK CREEK ON EW-158, LOCATED 5.6 MILE WEST AND 0.3 MILE WEST OF YANUSH $63,600 DIV. $318,000 LATIMER 2 28613(06) COBRGE 0.35 MI. FY 2013 RIGHT OF WAY BRIDGE AND APPROACHES OVER WEST FORK CREEK ON EW-158, LOCATED 5.6 MILE WEST AND 0.3 MILE WEST OF YANUSH (RW FOR 2861304) $5,300 DIV. $5,300 LATIMER 2 28613(07) COBRGE 0.35 MI. FY 2013 UTILITIES BRIDGE AND APPROACHES OVER WEST FORK CREEK ON EW-158, LOCATED 5.6 MILE WEST AND 0.3 MILE WEST OF YANUSH (UT FOR 2861304) $5,300 DIV. $5,300 LEFLORE 2 27371(04) COBRGE 0.20 MI. FY 2013 BRIDGE & APPROACHES CO BR OVER FOURCHE MALINE CREEK APPROX 2.0 MILE NORTH OF LEFLORE $318,000 DIV. $826,800 LEFLORE 2 27372(04) COBRGE 0.20 MI. FY 2013 BRIDGE & APPROACHES CO BR OVER RED OAK CREEK APPROX 2.7 MILE NORTH OF LEFLORE $265,000 DIV. $773,800 LINCOLN 3 25088(05) CO RD 6.00 MI. FY 2013 PRELIMINARY ENGINEERING CO RD: FR US-62 4.0 MI EAST OF MEEKER EXT NORTH 6.0 MI PE FOR 25088(04) $106,000 DIV. $106,000 LINCOLN 3 25088(06) CO RD 6.00 MI. FY 2013 RIGHT OF WAY CO RD: FR US-62 4.0 MI EAST OF MEEKER EXT NORTH 6.0 MI ROW FOR 25088(04) $53,000 DIV. $53,000 LINCOLN 3 25088(07) CO RD 6.00 MI. FY 2013 UTILITIES CO RD: FR US-62 4.0 MI EAST OF MEEKER EXT NORTH 6.0 MI UT FOR 25088(04) $53,000 DIV. $53,000 Friday, July 8, 2011 Page 31 of 63 5 YEAR CIRB WORK PLAN LOGAN 4 25090(06) COBRGE 0.38 MI. FY 2013 RIGHT OF WAY CO BR OVER SKELETON CR, 2.0 MI WEST & 1.3 MI SOUTH OF SH-51/SH-74E ROW FOR 25090(04) $5,300 DIV. $5,300 LOGAN 4 25090(07) COBRGE 0.38 MI. FY 2013 UTILITIES CO BR OVER SKELETON CR, 2.0 MI WEST & 1.3 MI SOUTH OF SH-51/SH-74E UT FOR 25090(04) $5,300 DIV. $5,300 LOGAN 4 26645(04) CO RD 0.00 MI. FY 2013 RESURFACE CO RD(EW-87)(CHARTER OAK RD) BEG @ NS-309(KELLY AVE) EXT EAST TO NS-310 (BROADWAY BLVD) $94,185 DIV. $470,924 LOGAN 4 27519(04) COBRGE 0.20 MI. FY 2013 BRIDGE & APPROACHES BRIDGE & APPROACHES ON CO RD EW-081 OVER AN UNNAMED CREEK 2.9 MI WEST OF MERIDIAN $159,000 DIV. $344,427 LOGAN 4 28715(05) CO RD 5.00 MI. FY 2013 PRELIMINARY ENGINEERING PHASE 1 MIDWEST BLVD FROM WATERLOO NORTH 4 MILES TO EW-85 THEN WEST 1 MILE TO NS-314(AIR DEPOT/ PINE ROAD) PE FOR 28715(04) $106,000 DIV. $106,000 LOVE 7 25447(06) CO RD 0.00 MI. FY 2013 RIGHT OF WAY CO RD: FROM SH-76 EAST 6.0 MI (3 BRIDGES0 (4304C) ROW FOR 25447(04) $159,000 DIV. $159,000 LOVE 7 25447(07) CO RD 0.00 MI. FY 2013 UTILITIES CO RD: FROM SH-76 EAST 6.0 MI (3 BRIDGES0 (4304C) UT FOR 25447(04) $265,000 DIV. $265,000 MAJOR 6 27393(04) COBRGE 0.18 MI. FY 2013 BRIDGE & APPROACHES CO BR ON CO RD D-0454 OVER GRIEVER CREEK 3.5 MI EAST & 0.5 MI SOUTH OF SHERMAN $106,000 DIV. $530,000 MAJOR 6 28346(05) COBRGE 0.25 MI. FY 2013 PRELIMINARY ENGINEERING BRIDGE AND APPROACHES ON NS-256 OVER EAGLE CHIEF CREEK, 1.5 MILES NORTH OF CLEO SPRINGS PE FOR 28346(04) CIRB FUNDS $58,300 DIV. $58,300 MARSHALL 2 25105(04) CO RD 4.00 MI. FY 2013 GRADE, DRAIN & SURFACE CO RD(EW-200)(LINN RD) BEG APPROX 5.0 MILE EAST OF SH-99 & EXT EAST & SOUTH APPROX 4.8 MILE(PHASE I) $3,826,006 DIV. $3,826,006 MARSHALL 2 25105(05) CO RD 5.00 MI. FY 2013 GRADE & DRAIN CO. RD(EW-200)(LINN RD) BEG @ SH-99 & EXTEND EAST APPROX 5.0 MILES (PHASE II) $3,826,006 DIV. $3,826,006 MARSHALL 2 28618(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 2.5 MILES WEST AND 5.4 MILES SOUTH OF MADILL $198,750 DIV. $622,750 MARSHALL 2 28618(06) COBRGE 0.25 MI. FY 2013 RIGHT OF WAY BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 2.5 MILES WEST AND 5.4 MILES SOUTH OF MADILL RW FOR 2861804 $5,300 DIV. $5,300 MARSHALL 2 28618(07) COBRGE 0.25 MI. FY 2013 UTILITIES BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 2.5 MILES WEST AND 5.4 MILES SOUTH OF MADILL UT FOR 2861804 $5,300 DIV. $5,300 MARSHALL 2 28619(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 1.0 MILE NORTH OF TYLER $198,750 DIV. $622,750 MARSHALL 2 28619(06) COBRGE 0.25 MI. FY 2013 RIGHT OF WAY BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 1.0 MILE NORTH OF TYLER RW FOR 2861904 $5,300 DIV. $5,300 MARSHALL 2 28619(07) COBRGE 0.25 MI. FY 2013 UTILITIES BRIDGE AND APPROACHES OVER UNNAMED CREEK, LOCATED 1.0 MILE NORTH OF TYLER UT FOR 2861904 $5,300 DIV. $5,300 MAYES 8 25416(04) COBRGE 0.00 MI. FY 2013 BRIDGE & APPROACHES COUNTY ROAD(EW-50) OVER PRYOR CREEK APPROX 1.0 MILE WEST OF US-69 $873,440 DIV. $873,440 MAYES 8 27813(04) COBRGE FY 2013 BRIDGE & APPROACHES CO BR ON EW 600 OVER MURPHY CREEK APPX 5.8 MILE EAST OF US412 AND US69 $182,320 DIV. $449,440 Friday, July 8, 2011 Page 32 of 63 5 YEAR CIRB WORK PLAN MCCLAIN 3 21139(04) COBRGE 0.20 MI. FY 2013 BRIDGE & APPROACHES COUNTY BRIDGE OVER WALNUT CREEK, 4.6 MILES NORTH AND 2.0 MILES EAST OF SH-59/SH-39 JCT $297,739 DIV. $297,739 MCCURTAIN 2 22056(04) COBRGE 0.20 MI. FY 2013 BRIDGE & APPROACHES CO BR OVER BENNINGFIELD CREEK, APPROX. 0.5 MI SOUTH & 1.5 MI WEST OF NORTH POLE $116,600 DIV. $434,600 MCCURTAIN 2 25469(06) COBRGE 1.70 MI. FY 2013 RIGHT OF WAY CO BR OVER LITTLE RIVER CR, 1.6 MI NORTH & 0.5 MI EAST OF GARVIN (4530C) ROW FOR 25469(04) $30,019 DIV. $30,019 MCCURTAIN 2 25469(07) COBRGE 1.70 MI. FY 2013 UTILITIES CO BR OVER LITTLE RIVER CR, 1.6 MI NORTH & 0.5 MI EAST OF GARVIN (4530C) UT FOR 25469(04) $31,800 DIV. $31,800 MCCURTAIN 2 25470(06) COBRGE 0.30 MI. FY 2013 RIGHT OF WAY CO BR OVER GLOVER, GOLDEN & HOLLY CREEKS, 3.6 MI NORTH OF IDABEL ROW FOR 25470(04) $3,423 DIV. $3,423 MCCURTAIN 2 25470(07) COBRGE 0.30 MI. FY 2013 UTILITIES CO BR OVER GLOVER, GOLDEN & HOLLY CREEKS, 3.6 MI NORTH OF IDABEL UT FOR 25470(04) $3,885 DIV. $3,885 MCINTOSH 1 25103(04) CO RD 3.80 MI. FY 2013 GRADE,DRAINING,BRIDGE & SURFACE CO. RD(EW103) BEG @ OLD US-69(NS421) & EXT EAST 2.0 MI., NORTH 1.0 MI. (NS423), EAST 0.2MI.(EW102), NORTH 0.6MI,(NS4232). $2,120,000 DIV. $2,120,000 MURRAY 7 27855(05) CO RD 6.00 MI. FY 2013 PRELIMINARY ENGINEERING GRADE, DRAIN, BRIDGE AND SURFACE ON EW-169. BEGIN AT US-177 AND EXTEND EAST 6.0 MILES PE FOR 27855(04) $291,500 DIV. $291,500 MURRAY 7 28427(04) COBRGE 0.25 MI. FY 2013 BRIDGE & APPROACHES BRIDGE AND APPROACHES (EW-167) OVER ROCK CREEK, 1.5 MILES SOUTH AND 1.7 MILES EAST OF OAK GROVE $106,000 DIV. $530,000 MURRAY 7 28427(06) COBRGE 0.25 MI. FY 2013 RIGHT OF WAY BRIDGE AND APPROACHES (EW-167) OVER ROCK CREEK, 1.5 MILES SOUTH AND 1.7 MILES EAST OF OAK GROVE ROW FOR 28427(04) $5,300 DIV. $5,300 MURRAY 7 28427(07) COBRGE 0.25 MI. FY 2013 UTILITIES BRIDGE AND APPROACHES (EW-167) OVER ROCK CREEK, 1.5 MILES SOUTH AND 1.7 MILES EAST OF OAK GROVE UT FOR 28427(04) $10,600 DIV. $10,600 MUSKOGEE 1 25420(04) COBRGE 0.50 MI. FY 2013 BRIDGE & APPROACHES CO RD(EW-87) OVER PECAN CREEK APPROX. 0.5 MILE SOUTH & 3.0 MILE EAST OF TAFT $1,060,000 DIV. $1,060,000 NOBLE 4 25422(04) CO RD 6.00 MI. FY 2013 GRADE, DRAIN & SURFACE CO RD(NS-312) BEG APPROX 4.5 MILE NORTH OF US-412 & EXT NORTH APPROX 5.0 MILE TO |
Date created | 2011-08-10 |
Date modified | 2011-08-10 |